fbpx
Wikipedia

Kalukhali–Gobra line

Kalukhali–Gobra line[1] is a 137km-long broad gauge railway. It was constructed under the Ministry of Railways, Government of Bangladesh. The line connects Rajbari District to Gopalganj District. It is operated by West Zone and according to the engineering department of Bangladesh Railway, it has been identified as a high-grade railway line.[2]

Kalukhali–Gobra line
Overview
Native nameকালুখালী–গোবরা রেলপথ
StatusOperational
OwnerMinistry of Railways
LocaleBangladesh
Termini
  • Kalukhali Junction railway station
  • Gobra railway station
Stations18
Service
TypeRailway line in Bangladesh
SystemBangladesh Railway
History
Opened
  • 1932 (Kalukhali–Bhatiapara Ghat)
  • 2018 (Kashiani–Gobra)
Technical
Line length137 km
Track gaugeBroad gauge 1,676 mm (5 ft 6 in)
Operating speed80 km/h
Route map

History edit

The railway line was constructed from Kushtia to Goalundo Ghat on 1 January, 1871 during British rule. As a branch of this line, the railway line from Kalukhali in Rajbari District to Bhatiapara Ghat in Gopalganj District was started in 1932. Later it was closed in 1997 due to losses. On 2 November, 2013, Sheikh Hasina, the prime minister of the country, inaugurated the Kalukhali–Bhatiapara section renovated at a cost of ৳320.85 crore and launched the Bhatiapara Express.[3] In November 2015, the construction of the Kashiani–Gobra section started. The construction of this 44 km long railway section at a cost of ৳258 crore was completed in October 2018. The new railway line was launched on 1 November 2018 with the launch of the Tungipara Express train.[4]

Branch lines edit

Bhatiapara Ghat edit

The railway section from Kalukhali to Bhatiapara ghat was constructed in 1932 as a branch of the Poradah–Goalundo Ghat line built in 1871.[5][6]

Kamarkhali Ghat edit

This railway section was established from Kalukhali Ghat in Rajbari District to Bhatiapara Ghat. Another Madhukhali–Kamarkhali Ghat branch was constructed at the same time. But this branch line was later discontinued due to damage during 1971 liberation war. In 2018, the government announced the construction of a broad gauge railway branch line from Madhukhali to Magura via Kamarkhali Ghat.[7]

References edit

  1. ^ Biswas, PR (15 November 2017). "Kalukhali Gopalganj new rail line about to end". The Asian Age. Retrieved 28 May 2023.
  2. ^ Khan, Kamal Joha (17 October 2018). "মানে বেলাইনে রেললাইন". Prothom Alo (in Bengali). Retrieved 28 May 2023.
  3. ^ "সাত রেলস্টেশন চালুর খবর নেই". Prothom Alo (in Bengali). 7 December 2014. Retrieved 22 February 2020.
  4. ^ "চালু হতে যাচ্ছে গোপালগঞ্জ-রাজশাহী রুটে ট্রেন চলাচল". Banglanews24.com (in Bengali). 1 November 2018. Retrieved 22 February 2020.
  5. ^ "ট্রেন যাবে গোপালগঞ্জ, উদ্বোধন কাল". Bangla Tribune (in Bengali). 31 October 2018. from the original on 23 February 2020. Retrieved 23 February 2020.
  6. ^ . Bhorer Kagoj (in Bengali). 11 February 2018. Archived from the original on 23 February 2020. Retrieved 23 February 2020.
  7. ^ "মধুখালী-মাগুরায় নির্মিত হচ্ছে ব্রডগেজ রেলপথ". Banglanews24.com (in Bengali). 28 May 2018. Retrieved 23 February 2020.

kalukhali, gobra, line, 137km, long, broad, gauge, railway, constructed, under, ministry, railways, government, bangladesh, line, connects, rajbari, district, gopalganj, district, operated, west, zone, according, engineering, department, bangladesh, railway, b. Kalukhali Gobra line 1 is a 137km long broad gauge railway It was constructed under the Ministry of Railways Government of Bangladesh The line connects Rajbari District to Gopalganj District It is operated by West Zone and according to the engineering department of Bangladesh Railway it has been identified as a high grade railway line 2 Kalukhali Gobra lineOverviewNative nameক ল খ ল গ বর র লপথStatusOperationalOwnerMinistry of RailwaysLocaleBangladeshTerminiKalukhali Junction railway stationGobra railway stationStations18ServiceTypeRailway line in BangladeshSystemBangladesh RailwayHistoryOpened1932 Kalukhali Bhatiapara Ghat 2018 Kashiani Gobra TechnicalLine length137 kmTrack gaugeBroad gauge 1 676 mm 5 ft 6 in Operating speed80 km hRoute mapKalukhali Gobra lineLegendPoradah Goalundo Ghat lineKalukhali JunctionPoradah Goalundo Ghat lineRamdiaBohorpurArrkandiNaliagramMadhukhali JunctionKamarkhali GhatMadhumati RiverMaguraGhorakhaliSatairBoalmariSahashrailByaspurDhaka Jessore lineKashiani JunctionDhaka Jessore lineBhatiapara GhatChaptaChoto BahirbagChandradighliaGopalganjBorashiGobraThis diagram viewtalkedit Contents 1 History 2 Branch lines 2 1 Bhatiapara Ghat 2 2 Kamarkhali Ghat 3 ReferencesHistory editThe railway line was constructed from Kushtia to Goalundo Ghat on 1 January 1871 during British rule As a branch of this line the railway line from Kalukhali in Rajbari District to Bhatiapara Ghat in Gopalganj District was started in 1932 Later it was closed in 1997 due to losses On 2 November 2013 Sheikh Hasina the prime minister of the country inaugurated the Kalukhali Bhatiapara section renovated at a cost of 320 85 crore and launched the Bhatiapara Express 3 In November 2015 the construction of the Kashiani Gobra section started The construction of this 44 km long railway section at a cost of 258 crore was completed in October 2018 The new railway line was launched on 1 November 2018 with the launch of the Tungipara Express train 4 Branch lines editBhatiapara Ghat edit The railway section from Kalukhali to Bhatiapara ghat was constructed in 1932 as a branch of the Poradah Goalundo Ghat line built in 1871 5 6 Kamarkhali Ghat edit This railway section was established from Kalukhali Ghat in Rajbari District to Bhatiapara Ghat Another Madhukhali Kamarkhali Ghat branch was constructed at the same time But this branch line was later discontinued due to damage during 1971 liberation war In 2018 the government announced the construction of a broad gauge railway branch line from Madhukhali to Magura via Kamarkhali Ghat 7 References edit Biswas PR 15 November 2017 Kalukhali Gopalganj new rail line about to end The Asian Age Retrieved 28 May 2023 Khan Kamal Joha 17 October 2018 ম ন ব ল ইন র লল ইন Prothom Alo in Bengali Retrieved 28 May 2023 স ত র লস ট শন চ ল র খবর ন ই Prothom Alo in Bengali 7 December 2014 Retrieved 22 February 2020 চ ল হত য চ ছ গ প লগঞ জ র জশ হ র ট ট র ন চল চল Banglanews24 com in Bengali 1 November 2018 Retrieved 22 February 2020 ট র ন য ব গ প লগঞ জ উদ ব ধন ক ল Bangla Tribune in Bengali 31 October 2018 Archived from the original on 23 February 2020 Retrieved 23 February 2020 ক শ য ন ট ঙ গ প ড র লপথ প রকল প র ব যয ব ড ছ Bhorer Kagoj in Bengali 11 February 2018 Archived from the original on 23 February 2020 Retrieved 23 February 2020 মধ খ ল ম গ র য ন র ম ত হচ ছ ব রডগ জ র লপথ Banglanews24 com in Bengali 28 May 2018 Retrieved 23 February 2020 Retrieved from https en wikipedia org w index php title Kalukhali Gobra line amp oldid 1157941491, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.