Kızıldere Geothermal Power Plant

The Kızıldere Geothermal Power Plant (Turkish: Kızıldere Jeotermal Elektrik Santrali) is a geothermal power plant located at Kızıldere village of Sarayköy district in Denizli Province, southwestern Turkey. The initial power plant with 15 MW installed capacity was expanded in the second phase about 80 MW to 95 MW in total, making the facility Turkey's biggest geothermal power plant.[1][2] It is planned to expand the power plant in a third and fourth phase.[3][4][5]

Kızıldere Geothermal Power Plant
Official nameKızıldere Jeotermal Elektrik Santrali
CountryTurkey
LocationKızıldere, Sarayköy, Denizli Province
Coordinates37°57′00″N 28°50′35″E / 37.95000°N 28.84306°E / 37.95000; 28.84306
StatusOperational
Commission date1984; 40 years ago (1984)
Construction costUS$250 million
Operator(s)Zorlu Energy Inc.
Power generation
Nameplate capacity95 MW
Annual net output575 GWh

History edit

The power plant began its operation as a prototype system with the installation of a 500 kW turbine generator group in 1974.[6] The facility generated electricity and distributed it to the households of villages in the vicinity for four years free of charge. In 1984, the state-owned company Elektrik Üretim A.Ş. (EÜAŞ) built a power plant with 17.4 MW installed capacity and put it into service.[3][7][8][9][10][11] However, the geothermal power plant has produced 10 MW on average since its opening in 1984.[7][12]

In September 2008, Zorlu Energy Inc. (Zorlu Doğal Elektrik Üretim A.Ş.), a subsidiary of Zorlu Holding, acquired the facility from Ankara Doğal Elektrik Üretim ve Ticaret A.Ş. (ADÜAŞ) as part of a privatisation process with seven other hydroelectric power plants across the country.[4][8][13][14] Zorlu Energy Inc. obtained the operating lease right for a runtime of 30 years.[3][4][14] The company announced that they increased the actual power capacity from 6 MW to 14 MW in three months, and added that they plan to raise the capacity to 60 MW within three years in the next phase.[9][10][11][13]

With the initiative of the governmental Electrical Power Resources Survey and Development Administration (Turkish: Elektrik İşleri Etüt İdaresi, EIE), a research project was started by Zorlu Petrogas Oil &Gas group. After the oil and gas assets were sold to Transatlantic Petroleum, the project was carried out by Zorlu Geothermal Company in cooperation with the Hacettepe University and the Middle East Technical University (ODTÜ) to increase the electricity production from the geothermal field.[12]

For the investment capital of the planned capacity increase, which amounts to US$230 million,[15] the company received a credit from the banks Akbank and Garanti Bank in October 2010 with a backpayment term of 12 years.[16]

In December 2011, the provincial administration allocated 70 decares (70,000 m2; 750,000 sq ft) land needed for the construction site of the geothermal power plant expansion. The project forecast 575 GWh annual electrical energy generation, and a contribution to the country's economy at US$60 million yearly. The geothermal fluid would be used also in dry ice production and for heating in greenhouses and households in the villages around the power plant.[15]

The construction of the Kızıldere Geothermal Power Plant was completed in 2013, and it went into service. On September 29, 2013, a ceremonial opening took place in presence of Prime Minister Recep Tayyip Erdoğan, Minister Energy and Natural Resources Taner Yıldız, other high-ranked politicians and officials.[3][4][17] The construction cost US$250 million.[1][2][17][18]

Kızıldere Geothermal Reservoir edit

Kızıldere geothermal field is situated at the western branch of Büyük Menderes Graben within the limits of Denizli Province.[12] It is Turkey's first and high-potential geothermal field explored for energy generation purposes.[3][6][8][9][10]

The first geological and geophysical surveys in the Kızıldere geothermal field began in 1965, and were carried out by the state-owned Turkish Mineral Research and Exploration Co. (MTA). The first geothermal reservoir was discovered in 1968 with a geothermal well drilled in 540 m (1,770 ft) depth, which had a source temperature of 198 °C (388 °F). In the years from 1968 to 1973, a total of 16 geothermal wells were drilled to depths ranging between 370–1,241 m (1,214–4,072 ft). Six of the 17 geothermal wells were found feasible for electricity generation.[6][7][8][9][10][11]

Lithologically, the Kızıldere geothermal reservoir is surrounded by marble and limestone rocks containing plentiful carbon dioxide. The calcium carbonate dissolves from the rocks and later gets deposited as limescale on the instruments in the geothermal well and at the brink, such as demisters, heat exchangers, and other locations, and this causes a drop in pressure. This results in decreased steam production, reduced efficiency, and an increased probability of failure.[7] Thus, the power plant capacity was reduced to 6 MW before privatization in 2008.[8][9][10][11] To prevent calcium carbonate scaling in production wells, inhibitors are used.[6]

The geothermal fluid of Kızıldere reservoir has a Langelier Saturation Index (LSI) of 2.1 and Ryznar Stability Index (RSI) of 2.3 by a pH value of 9.3, making scaling take place very rapidly.[7]

The source temperature at the first reservoir is between 240–260 °C (464–500 °F).[7][15] All the geothermal fluid used in the power plant is reinjected into the reservoir for the purpose of maintaining the sustainability of the source.[3][5][6]

Byproducts edit

In addition to electricity generation, the geothermal fluid serves for processing of carbon dioxide gas as a byproduct, and this is used in dry ice production at two nearby plants. The total annual dry ice production in Kızıldere is 80,000 tons.[7] Further applications are heating of 500 decares (500,000 m2; 5,400,000 sq ft) greenhouse space and 2,500 households.[1][3][4][5][19]

Honors edit

In June 2011, the International Energy and Environment Fair and Conference (ICCI) awarded Zorlu Energy Inc. the 2010 Energy Prize for its works on renewable energy, particularly in relation to the Kızıldere GEPP and Gökçedağ Wind Farm.[20]

See also edit

References edit

  1. ^ a b c "Erdoğan en büyük jeotermal santrali açtı". Haber 7 (in Turkish). 2013-09-29. Retrieved 2014-01-05.
  2. ^ a b "Largest geothermal power plant opeed by Erdogan". Dünya. 2013-09-30. Retrieved 2014-01-06.
  3. ^ a b c d e f g "Türkiye'nin en büyük jeotermal santrali devreye giriyor". Hürriyet Ekonomi (in Turkish). 2013-09-28. Retrieved 2014-01-05.
  4. ^ a b c d e "Zorlu'dan 'en büyük jeotermal'". Hürriyet Ekonomi (in Turkish). 2013-09-29. Retrieved 2014-01-05.
  5. ^ a b c . Energy World (in Turkish). 2013-09-28. Archived from the original on 2014-01-06. Retrieved 2014-01-05.
  6. ^ a b c d e Kaya, Tevfik; Ali Kindap (2009). "Kızıldere-New Geothermal Power Plant in Turkey" (PDF). Slovakia: International geothermal Days. Retrieved 2014-01-06. {{cite journal}}: Cite journal requires |journal= (help)
  7. ^ a b c d e f g (PDF) (in Turkish). Ankara: TMMOB. 2009. Archived from the original (PDF) on 2014-02-10. Retrieved 2014-01-05. {{cite journal}}: Cite journal requires |journal= (help)
  8. ^ a b c d e Çetin, Engin; Ali Rıza Verel; Edip Alpan; Erim Arıcı; Cevat Uçman; Talat Karaman (12–13 October 2009). "Denizli İli Elektrik Enerjisi Üretim Tesislerinin İncelenmesi" (PDF). Ege Bölgesi Enerji Forumu (in Turkish). Denizli: Elektrik Mühendisleri Odası. Retrieved 2014-01-05.
  9. ^ a b c d e "Zorlu Enerji Grubu, Kızıldere Jeotermal Santrali'nin kapasitesini iki katına çıkardı" (in Turkish). Ekonomize. Archived from the original on 2014-01-07. Retrieved 2014-01-05.
  10. ^ a b c d e "Kızıldere Jeotermal" (in Turkish). Alternaturk. 2008-12-29. Retrieved 2014-01-05.
  11. ^ a b c d . Kent Haber (in Turkish). 2009-01-02. Archived from the original on 2014-01-06. Retrieved 2014-01-05.
  12. ^ a b c Parlaktuna, Mahmut; Nilgün Güleç; Nurkan Karahanoğlu; Ender Okandan; Seyfullah Tufan; Dönmez Çiftçi; Tamer Çirkin; Yılmaz Tuna; Nazife Yılmaz. "Denizli-Kızıldere Jeotermal Sahası Elektrik Üretiminin Aartırımına Yönelik Rezervuar Değerlendirme Çalışması" (PDF). JMO. Retrieved 2013-01-05. {{cite journal}}: Cite journal requires |journal= (help)
  13. ^ a b "Zorlu Kızıldere Jeotermal Santrali'nin kapasitesini iki katına çıkardı". Hürriyet Ekonomi (in Turkish). 2008-12-29. Retrieved 2014-01-05.
  14. ^ a b "ADÜAŞ devir sözleşmesi imzalandı". Milliyet Ekonomi (in Turkish). 2008-09-01. Retrieved 2014-01-05.
  15. ^ a b c "Zorlu Denizli'de dev Jeotermal santral yapacak". Hürriyet Ekonomi (in Turkish). 2011-12-14. Retrieved 2014-01-05.
  16. ^ "Zorlu Enerji'ye kredi". Hürriyet Ekonomi (in Turkish). 2010-10-15. Retrieved 2014-01-05.
  17. ^ a b "'3 yetmez 4 çocuk yapın'". Doğan News Agency (in Turkish). 2013-09-29. Retrieved 2014-01-05.
  18. ^ "Zorlu's geothermal power plant opened". Hürriyet Daily News. 2013-09-30. Retrieved 2014-01-06.
  19. ^ . Energy World (in Turkish). 2013-09-02. Archived from the original on 2014-01-06. Retrieved 2014-01-05.
  20. ^ "Gökçedağ ve Kızıldere Zorlu Enerji'ye iki ödül kazandırdı". Hürriyet Ekonomi (in Turkish). 2011-06-19. Retrieved 2014-01-05.

kızıldere, geothermal, power, plant, this, article, needs, updated, please, help, update, this, article, reflect, recent, events, newly, available, information, 2022, turkish, kızıldere, jeotermal, elektrik, santrali, geothermal, power, plant, located, kızılde. This article needs to be updated Please help update this article to reflect recent events or newly available information May 2022 The Kizildere Geothermal Power Plant Turkish Kizildere Jeotermal Elektrik Santrali is a geothermal power plant located at Kizildere village of Saraykoy district in Denizli Province southwestern Turkey The initial power plant with 15 MW installed capacity was expanded in the second phase about 80 MW to 95 MW in total making the facility Turkey s biggest geothermal power plant 1 2 It is planned to expand the power plant in a third and fourth phase 3 4 5 Kizildere Geothermal Power PlantOfficial nameKizildere Jeotermal Elektrik SantraliCountryTurkeyLocationKizildere Saraykoy Denizli ProvinceCoordinates37 57 00 N 28 50 35 E 37 95000 N 28 84306 E 37 95000 28 84306StatusOperationalCommission date1984 40 years ago 1984 Construction costUS 250 millionOperator s Zorlu Energy Inc Power generationNameplate capacity95 MWAnnual net output575 GWh edit on Wikidata Contents 1 History 2 Kizildere Geothermal Reservoir 3 Byproducts 4 Honors 5 See also 6 ReferencesHistory editThe power plant began its operation as a prototype system with the installation of a 500 kW turbine generator group in 1974 6 The facility generated electricity and distributed it to the households of villages in the vicinity for four years free of charge In 1984 the state owned company Elektrik Uretim A S EUAS built a power plant with 17 4 MW installed capacity and put it into service 3 7 8 9 10 11 However the geothermal power plant has produced 10 MW on average since its opening in 1984 7 12 In September 2008 Zorlu Energy Inc Zorlu Dogal Elektrik Uretim A S a subsidiary of Zorlu Holding acquired the facility from Ankara Dogal Elektrik Uretim ve Ticaret A S ADUAS as part of a privatisation process with seven other hydroelectric power plants across the country 4 8 13 14 Zorlu Energy Inc obtained the operating lease right for a runtime of 30 years 3 4 14 The company announced that they increased the actual power capacity from 6 MW to 14 MW in three months and added that they plan to raise the capacity to 60 MW within three years in the next phase 9 10 11 13 With the initiative of the governmental Electrical Power Resources Survey and Development Administration Turkish Elektrik Isleri Etut Idaresi EIE a research project was started by Zorlu Petrogas Oil amp Gas group After the oil and gas assets were sold to Transatlantic Petroleum the project was carried out by Zorlu Geothermal Company in cooperation with the Hacettepe University and the Middle East Technical University ODTU to increase the electricity production from the geothermal field 12 For the investment capital of the planned capacity increase which amounts to US 230 million 15 the company received a credit from the banks Akbank and Garanti Bank in October 2010 with a backpayment term of 12 years 16 In December 2011 the provincial administration allocated 70 decares 70 000 m2 750 000 sq ft land needed for the construction site of the geothermal power plant expansion The project forecast 575 GWh annual electrical energy generation and a contribution to the country s economy at US 60 million yearly The geothermal fluid would be used also in dry ice production and for heating in greenhouses and households in the villages around the power plant 15 The construction of the Kizildere Geothermal Power Plant was completed in 2013 and it went into service On September 29 2013 a ceremonial opening took place in presence of Prime Minister Recep Tayyip Erdogan Minister Energy and Natural Resources Taner Yildiz other high ranked politicians and officials 3 4 17 The construction cost US 250 million 1 2 17 18 Kizildere Geothermal Reservoir editKizildere geothermal field is situated at the western branch of Buyuk Menderes Graben within the limits of Denizli Province 12 It is Turkey s first and high potential geothermal field explored for energy generation purposes 3 6 8 9 10 The first geological and geophysical surveys in the Kizildere geothermal field began in 1965 and were carried out by the state owned Turkish Mineral Research and Exploration Co MTA The first geothermal reservoir was discovered in 1968 with a geothermal well drilled in 540 m 1 770 ft depth which had a source temperature of 198 C 388 F In the years from 1968 to 1973 a total of 16 geothermal wells were drilled to depths ranging between 370 1 241 m 1 214 4 072 ft Six of the 17 geothermal wells were found feasible for electricity generation 6 7 8 9 10 11 Lithologically the Kizildere geothermal reservoir is surrounded by marble and limestone rocks containing plentiful carbon dioxide The calcium carbonate dissolves from the rocks and later gets deposited as limescale on the instruments in the geothermal well and at the brink such as demisters heat exchangers and other locations and this causes a drop in pressure This results in decreased steam production reduced efficiency and an increased probability of failure 7 Thus the power plant capacity was reduced to 6 MW before privatization in 2008 8 9 10 11 To prevent calcium carbonate scaling in production wells inhibitors are used 6 The geothermal fluid of Kizildere reservoir has a Langelier Saturation Index LSI of 2 1 and Ryznar Stability Index RSI of 2 3 by a pH value of 9 3 making scaling take place very rapidly 7 The source temperature at the first reservoir is between 240 260 C 464 500 F 7 15 All the geothermal fluid used in the power plant is reinjected into the reservoir for the purpose of maintaining the sustainability of the source 3 5 6 Byproducts editIn addition to electricity generation the geothermal fluid serves for processing of carbon dioxide gas as a byproduct and this is used in dry ice production at two nearby plants The total annual dry ice production in Kizildere is 80 000 tons 7 Further applications are heating of 500 decares 500 000 m2 5 400 000 sq ft greenhouse space and 2 500 households 1 3 4 5 19 Honors editIn June 2011 the International Energy and Environment Fair and Conference ICCI awarded Zorlu Energy Inc the 2010 Energy Prize for its works on renewable energy particularly in relation to the Kizildere GEPP and Gokcedag Wind Farm 20 See also editGeothermal energy in TurkeyReferences edit a b c Erdogan en buyuk jeotermal santrali acti Haber 7 in Turkish 2013 09 29 Retrieved 2014 01 05 a b Largest geothermal power plant opeed by Erdogan Dunya 2013 09 30 Retrieved 2014 01 06 a b c d e f g Turkiye nin en buyuk jeotermal santrali devreye giriyor Hurriyet Ekonomi in Turkish 2013 09 28 Retrieved 2014 01 05 a b c d e Zorlu dan en buyuk jeotermal Hurriyet Ekonomi in Turkish 2013 09 29 Retrieved 2014 01 05 a b c En Buyuk Jeotermal Santrali Devreye Giriyor Energy World in Turkish 2013 09 28 Archived from the original on 2014 01 06 Retrieved 2014 01 05 a b c d e Kaya Tevfik Ali Kindap 2009 Kizildere New Geothermal Power Plant in Turkey PDF Slovakia International geothermal Days Retrieved 2014 01 06 a href Template Cite journal html title Template Cite journal cite journal a Cite journal requires journal help a b c d e f g Jeotermal Kongresi Bildirimler Kitabi PDF in Turkish Ankara TMMOB 2009 Archived from the original PDF on 2014 02 10 Retrieved 2014 01 05 a href Template Cite journal html title Template Cite journal cite journal a Cite journal requires journal help a b c d e Cetin Engin Ali Riza Verel Edip Alpan Erim Arici Cevat Ucman Talat Karaman 12 13 October 2009 Denizli Ili Elektrik Enerjisi Uretim Tesislerinin Incelenmesi PDF Ege Bolgesi Enerji Forumu in Turkish Denizli Elektrik Muhendisleri Odasi Retrieved 2014 01 05 a b c d e Zorlu Enerji Grubu Kizildere Jeotermal Santrali nin kapasitesini iki katina cikardi in Turkish Ekonomize Archived from the original on 2014 01 07 Retrieved 2014 01 05 a b c d e Kizildere Jeotermal in Turkish Alternaturk 2008 12 29 Retrieved 2014 01 05 a b c d Kapasitesi dusmustu Kent Haber in Turkish 2009 01 02 Archived from the original on 2014 01 06 Retrieved 2014 01 05 a b c Parlaktuna Mahmut Nilgun Gulec Nurkan Karahanoglu Ender Okandan Seyfullah Tufan Donmez Ciftci Tamer Cirkin Yilmaz Tuna Nazife Yilmaz Denizli Kizildere Jeotermal Sahasi Elektrik Uretiminin Aartirimina Yonelik Rezervuar Degerlendirme Calismasi PDF JMO Retrieved 2013 01 05 a href Template Cite journal html title Template Cite journal cite journal a Cite journal requires journal help a b Zorlu Kizildere Jeotermal Santrali nin kapasitesini iki katina cikardi Hurriyet Ekonomi in Turkish 2008 12 29 Retrieved 2014 01 05 a b ADUAS devir sozlesmesi imzalandi Milliyet Ekonomi in Turkish 2008 09 01 Retrieved 2014 01 05 a b c Zorlu Denizli de dev Jeotermal santral yapacak Hurriyet Ekonomi in Turkish 2011 12 14 Retrieved 2014 01 05 Zorlu Enerji ye kredi Hurriyet Ekonomi in Turkish 2010 10 15 Retrieved 2014 01 05 a b 3 yetmez 4 cocuk yapin Dogan News Agency in Turkish 2013 09 29 Retrieved 2014 01 05 Zorlu s geothermal power plant opened Hurriyet Daily News 2013 09 30 Retrieved 2014 01 06 Kizildere Ii Jeotermal Santrali nde Uretim Basladi Energy World in Turkish 2013 09 02 Archived from the original on 2014 01 06 Retrieved 2014 01 05 Gokcedag ve Kizildere Zorlu Enerji ye iki odul kazandirdi Hurriyet Ekonomi in Turkish 2011 06 19 Retrieved 2014 01 05 nbsp Turkey portal nbsp Geology portal nbsp Renewable energy portal Retrieved from https en wikipedia org w index php title Kizildere Geothermal Power Plant amp oldid 1184019512, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.