fbpx
Wikipedia

ISRO Pad Abort Test

ISRO Pad Abort Test was an Indian Space Research Organisation launch escape system test of its crew module as part of Indian Human Spaceflight Programme. The successful test took place on 5 July 2018.[2]

ISRO Pad Abort Test
Mission typeLaunch escape system
OperatorISRO
Mission duration4 minutes, 25 seconds
Apogee2.75 km (1.71 mi),
Spacecraft properties
Spacecraft typeGaganyaan's boilerplate vehicle
ManufacturerISRO
Launch mass12.6 ton [1]
Start of mission
Launch date5 July 2018
Launch siteSatish Dhawan Space Centre
← CARE
TV-D1 →
 

A Pad Abort Test is a trial run for the spacecraft's launch abort system (sometimes called a launch escape system). This system is designed to quickly get the crew and spacecraft away from the rocket in the event of a potential failure. It is similar to an ejection seat for a fighter pilot, but instead of ejecting the pilot out of the spacecraft, the entire spacecraft is "ejected" away from the launch vehicle. The technology developed is expected to be applied to the first Indian crewed spacecraft called Gaganyaan, scheduled to be launched no earlier than 2024.[3]

Flight edit

 
Launch Escape System
 
The Gaganyaan Crew Module boilerplate, after jettisoning the Crew Escape System (CES), floats back to the ground under its parachutes over the Bay of Bengal, about 2.9 km from the Satish Dhawan Space Centre, Sriharikota.

The countdown for the test started at 2:00 am (IST) on 5 July 2018. At 7:00 am (IST) The Crew Escape System with crew module successfully lifted-off from Satish Dhawan Space Centre. The crew module was accelerated to 10 g[4] and reached a highest altitude of 2.75 km (1.71 mi), it later safely parachuted down and floated in the Bay of Bengal 2.9 km (1.80 mi) away from its launch site. It was carried skyward using seven solid-fueled rocket motors keeping within the safe g-force limits. Later recovery boats were sent to recover the crew module. The total duration of the test mission was 259 seconds. The test launch process was recorded by around 300 sensors.[5][6] Main objectives of test were nominal 20 second ascent and 200 seconds of descent, not including the splashdown.[7] Chute detachment was a scheduled event occurring around 259.4 seconds after launch as intended.[8][9]

Sequence of flight events.[10]
Time Event
T0 - 30 minutes Grid fins deployed
T0 - 8 seconds Separation from launchpad
T0 Ignition of High Altitude Escape Motor (HEM) and Low Altitude Escape Motor (LEM)
T0 + 0.9 seconds Ignition of Pitch Motor (PM)
T0 + 2 seconds Burnout of Pitch Motor (PM)
T0 + 5 seconds Burnout of High Altitude Escape Motor (HEM)
T0 + 8 seconds Burnout of Low Altitude Escape Motor (LEM)
T0 + 18 seconds Crew Escape System/Crew Module aft link separation
T0 + 20 seconds Crew Escape System/Crew Module separation, jettisoning motor ignition
T0 + 29 seconds Parachute deployment
T0 + 265 seconds Crew Module Splashdown.

See also edit

References edit

  1. ^ "Parliamentary Q&A [25 Nov 2016]: Queries on Crew Escape System,Chandrayaan-2 rover and MOM-2". 25 November 2016.
  2. ^ "ISRO conducts pad abort test for Indian human space flight program – NASASpaceFlight.com". www.nasaspaceflight.com. 4 July 2018. Retrieved 5 July 2018.
  3. ^ "Gaganyaan mission can't happen this year or next year, focus fully on safety aspects: Isro chief". The Times of India. 30 June 2022. ISSN 0971-8257. Retrieved 21 May 2023.
  4. ^ Baluragi, Hanamantray; Suresh, Byrana Nagappa (2020), "Indian Space Program: Evolution, Dimensions, and Initiatives", Handbook of Space Security, Cham: Springer International Publishing, pp. 1–19, doi:10.1007/978-3-030-22786-9_38-2, ISBN 978-3-030-22786-9, S2CID 216447640, retrieved 4 July 2020
  5. ^ "ISRO's first 'pad abort' test, critical for future human space mission, successful".
  6. ^ . www.isro.gov.in. Archived from the original on 5 July 2018. Retrieved 5 July 2018.
  7. ^ (PDF). 4 July 2018. Archived from the original (PDF) on 4 July 2018.
  8. ^ "Episode 80 - S Somnath Director of Vikram Sarabhai Space Centre". AstrotalkUK. 30 November 2018. Retrieved 12 January 2020.
  9. ^ "Flight test of crew escape system - Technology Demonstrator Lift of video - ISRO". www.isro.gov.in. Retrieved 12 January 2020.
  10. ^ Kunhikrishnan, P. (15 February 2019). "Recent Indian Space Missions: Update as of February 2019" (PDF).

External links edit

  • Official video

isro, abort, test, indian, space, research, organisation, launch, escape, system, test, crew, module, part, indian, human, spaceflight, programme, successful, test, took, place, july, 2018, mission, typelaunch, escape, systemoperatorisromission, duration4, min. ISRO Pad Abort Test was an Indian Space Research Organisation launch escape system test of its crew module as part of Indian Human Spaceflight Programme The successful test took place on 5 July 2018 2 ISRO Pad Abort TestMission typeLaunch escape systemOperatorISROMission duration4 minutes 25 secondsApogee2 75 km 1 71 mi Spacecraft propertiesSpacecraft typeGaganyaan s boilerplate vehicleManufacturerISROLaunch mass12 6 ton 1 Start of missionLaunch date5 July 2018Launch siteSatish Dhawan Space CentreIHSP CARETV D1 A Pad Abort Test is a trial run for the spacecraft s launch abort system sometimes called a launch escape system This system is designed to quickly get the crew and spacecraft away from the rocket in the event of a potential failure It is similar to an ejection seat for a fighter pilot but instead of ejecting the pilot out of the spacecraft the entire spacecraft is ejected away from the launch vehicle The technology developed is expected to be applied to the first Indian crewed spacecraft called Gaganyaan scheduled to be launched no earlier than 2024 3 Contents 1 Flight 2 See also 3 References 4 External linksFlight edit nbsp Launch Escape System nbsp The Gaganyaan Crew Module boilerplate after jettisoning the Crew Escape System CES floats back to the ground under its parachutes over the Bay of Bengal about 2 9 km from the Satish Dhawan Space Centre Sriharikota The countdown for the test started at 2 00 am IST on 5 July 2018 At 7 00 am IST The Crew Escape System with crew module successfully lifted off from Satish Dhawan Space Centre The crew module was accelerated to 10 g 4 and reached a highest altitude of 2 75 km 1 71 mi it later safely parachuted down and floated in the Bay of Bengal 2 9 km 1 80 mi away from its launch site It was carried skyward using seven solid fueled rocket motors keeping within the safe g force limits Later recovery boats were sent to recover the crew module The total duration of the test mission was 259 seconds The test launch process was recorded by around 300 sensors 5 6 Main objectives of test were nominal 20 second ascent and 200 seconds of descent not including the splashdown 7 Chute detachment was a scheduled event occurring around 259 4 seconds after launch as intended 8 9 Sequence of flight events 10 Time EventT0 30 minutes Grid fins deployedT0 8 seconds Separation from launchpadT0 Ignition of High Altitude Escape Motor HEM and Low Altitude Escape Motor LEM T0 0 9 seconds Ignition of Pitch Motor PM T0 2 seconds Burnout of Pitch Motor PM T0 5 seconds Burnout of High Altitude Escape Motor HEM T0 8 seconds Burnout of Low Altitude Escape Motor LEM T0 18 seconds Crew Escape System Crew Module aft link separationT0 20 seconds Crew Escape System Crew Module separation jettisoning motor ignitionT0 29 seconds Parachute deploymentT0 265 seconds Crew Module Splashdown See also editGaganyaan India s crewed spacecraft Indian Human Spaceflight Programme Launch escape systemReferences edit Parliamentary Q amp A 25 Nov 2016 Queries on Crew Escape System Chandrayaan 2 rover and MOM 2 25 November 2016 ISRO conducts pad abort test for Indian human space flight program NASASpaceFlight com www nasaspaceflight com 4 July 2018 Retrieved 5 July 2018 Gaganyaan mission can t happen this year or next year focus fully on safety aspects Isro chief The Times of India 30 June 2022 ISSN 0971 8257 Retrieved 21 May 2023 Baluragi Hanamantray Suresh Byrana Nagappa 2020 Indian Space Program Evolution Dimensions and Initiatives Handbook of Space Security Cham Springer International Publishing pp 1 19 doi 10 1007 978 3 030 22786 9 38 2 ISBN 978 3 030 22786 9 S2CID 216447640 retrieved 4 July 2020 ISRO s first pad abort test critical for future human space mission successful SUCCESSFUL FLIGHT TESTING OF CREW ESCAPE SYSTEM TECHNOLOGY DEMONSTRATOR ISRO www isro gov in Archived from the original on 5 July 2018 Retrieved 5 July 2018 ISRO s Human Space Programme Pad Abort Test PAT on 5th July 2018 Early Morning PDF 4 July 2018 Archived from the original PDF on 4 July 2018 Episode 80 S Somnath Director of Vikram Sarabhai Space Centre AstrotalkUK 30 November 2018 Retrieved 12 January 2020 Flight test of crew escape system Technology Demonstrator Lift of video ISRO www isro gov in Retrieved 12 January 2020 Kunhikrishnan P 15 February 2019 Recent Indian Space Missions Update as of February 2019 PDF External links editOfficial video Retrieved from https en wikipedia org w index php title ISRO Pad Abort Test amp oldid 1180995489, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.