fbpx
Wikipedia

International Convention on Load Lines

The International Convention on Load Lines (CLL), was signed in London on 5 April 1966, amended by the 1988 Protocol and further revised in 2003. The convention pertains specifically to a ship's load line (also referred to as the "waterline"), a marking of the highest point on a ship's hull that can safely meet the surface of the water; a ship that is loaded to the point where its load line is underwater and no longer visible has exceeded its draft and is in danger because its capacity has been exceeded.

International Convention on Load Lines
Parties to the
  Convention
  Convention and Protocol
Signed5 April 1966 (1966-04-05)
LocationLondon, UK
Effective21 July 1968
Condition15 ratifications, amongst which 7 with over 1 million gross tonnage
Signatories40
Parties162
DepositaryInternational Maritime Organization
LanguagesEnglish and French

The 1988 Protocol was adopted to harmonise the survey and certification requirement of the 1966 Convention with those contained in the International Convention for the Safety of Life at Sea (SOLAS) and MARPOL 73/78.

In accordance with the International Convention on Load Lines (CLL 66/88), all assigned load lines must be marked amidships on each side of the ships engaged in international voyages. The determinations of the freeboard of ships are calculated and/or verified by classification societies which issue International Load Line Certificates in accordance with the legislation of participating States.

Provisions edit

The Convention provides for the terms of ship's surveys, issuance, duration, validity and acceptance of International Load Line Certificates, as well as relevant State control measures, agreed exemptions and exceptions.

Annexes to the Convention contain various regulations for determining load lines, including details of marking and verification of marks, conditions of assignment of freeboard, freeboard tables and corrections, special provisions for ships intended for the carriage of timber and the prescribed form of International Load Line Certificates.

According to the Annexes to the convention, also taken into account are the potential hazards present in different zones and different seasons and additional safety measures concerning doors, hatchways, etc.

References edit

External links edit

international, convention, load, lines, signed, london, april, 1966, amended, 1988, protocol, further, revised, 2003, convention, pertains, specifically, ship, load, line, also, referred, waterline, marking, highest, point, ship, hull, that, safely, meet, surf. The International Convention on Load Lines CLL was signed in London on 5 April 1966 amended by the 1988 Protocol and further revised in 2003 The convention pertains specifically to a ship s load line also referred to as the waterline a marking of the highest point on a ship s hull that can safely meet the surface of the water a ship that is loaded to the point where its load line is underwater and no longer visible has exceeded its draft and is in danger because its capacity has been exceeded International Convention on Load LinesParties to the Convention Convention and ProtocolSigned5 April 1966 1966 04 05 LocationLondon UKEffective21 July 1968Condition15 ratifications amongst which 7 with over 1 million gross tonnageSignatories40Parties162DepositaryInternational Maritime OrganizationLanguagesEnglish and French The 1988 Protocol was adopted to harmonise the survey and certification requirement of the 1966 Convention with those contained in the International Convention for the Safety of Life at Sea SOLAS and MARPOL 73 78 In accordance with the International Convention on Load Lines CLL 66 88 all assigned load lines must be marked amidships on each side of the ships engaged in international voyages The determinations of the freeboard of ships are calculated and or verified by classification societies which issue International Load Line Certificates in accordance with the legislation of participating States Provisions editThe Convention provides for the terms of ship s surveys issuance duration validity and acceptance of International Load Line Certificates as well as relevant State control measures agreed exemptions and exceptions Annexes to the Convention contain various regulations for determining load lines including details of marking and verification of marks conditions of assignment of freeboard freeboard tables and corrections special provisions for ships intended for the carriage of timber and the prescribed form of International Load Line Certificates According to the Annexes to the convention also taken into account are the potential hazards present in different zones and different seasons and additional safety measures concerning doors hatchways etc References editExternal links editInternational Maritime Organization on CLL 66 88 1 Archived 3 July 2020 at the Wayback Machine IACS 2 Archived 2 April 2023 at the Wayback Machine The basic Concept of Load Lines Retrieved from https en wikipedia org w index php title International Convention on Load Lines amp oldid 1199381513, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.