Hornberg Basin

The Hornberg Basin (German: Hornbergbecken) is the upper reservoir of the Wehr power station, whose lower reservoir is impounded by the Wehra Dam. It lies near Herrischried (Hornberg) and near the town of Wehr in the county of Waldshut in Baden-Württemberg on the dome of the Langer Eck, the highest hill in the Hotzenwald. It was opened in 1975, is only used to generate pumped-storage power and is operated by the Schluchseewerk.

Hornberg Basin
Hornberg Basin - Upper storage reservoir of the Wehr pumped hydropower station
LocationLandkreis Waldshut
Construction began1970–1975
Dam and spillways
Height (foundation)65 m
Height (thalweg)65 m
Length1715 m
Elevation at crest1050.00 m
Width (crest)5 m
Dam volume2200000 m3
Reservoir
Active capacity4.4 million m³
Surface area0.17 km2
Maximum length0.700 km
Maximum width0.300 km
Normal elevation1048.00 m
The Hornberg Basin from the air (31 Jan 2015).
The Hornberg Basin during renovations in November 2008

An addition to the existing Hornberg Basin was planned as part of building the Atdorf Power Station, but the effort was cancelled in 2017 by the local operating company EnBW.[1] With a length of almost one kilometre and storage capacity of 9 million m³ it would have been considerably larger than the present Hornberg Basin.

See also

References

  1. ^ "EnBW reprioritises its storage projects: The Atdorf pump storage project will not be pursued further". EnBW Company Website. EnBW. Retrieved 22 December 2020.

Literature

  • Festschrift Hornbergstufe der Schluchseewerk AG. November 1976
  • Peter Franke, Wolfgang Frey: Talsperren in der Bundesrepublik Deutschland. DNK – DVWK 1987, ISBN 3-926520-00-0.

hornberg, basin, german, hornbergbecken, upper, reservoir, wehr, power, station, whose, lower, reservoir, impounded, wehra, lies, near, herrischried, hornberg, near, town, wehr, county, waldshut, baden, württemberg, dome, langer, highest, hill, hotzenwald, ope. The Hornberg Basin German Hornbergbecken is the upper reservoir of the Wehr power station whose lower reservoir is impounded by the Wehra Dam It lies near Herrischried Hornberg and near the town of Wehr in the county of Waldshut in Baden Wurttemberg on the dome of the Langer Eck the highest hill in the Hotzenwald It was opened in 1975 is only used to generate pumped storage power and is operated by the Schluchseewerk Hornberg BasinHornberg Basin Upper storage reservoir of the Wehr pumped hydropower stationLocationLandkreis WaldshutConstruction began1970 1975Dam and spillwaysHeight foundation 65 mHeight thalweg 65 mLength1715 mElevation at crest1050 00 mWidth crest 5 mDam volume2200000 m3ReservoirActive capacity4 4 million m Surface area0 17 km2Maximum length0 700 kmMaximum width0 300 kmNormal elevation1048 00 mThe Hornberg Basin from the air 31 Jan 2015 The Hornberg Basin during renovations in November 2008 An addition to the existing Hornberg Basin was planned as part of building the Atdorf Power Station but the effort was cancelled in 2017 by the local operating company EnBW 1 With a length of almost one kilometre and storage capacity of 9 million m it would have been considerably larger than the present Hornberg Basin See also EditList of dams in GermanyReferences Edit EnBW reprioritises its storage projects The Atdorf pump storage project will not be pursued further EnBW Company Website EnBW Retrieved 22 December 2020 Literature EditFestschrift Hornbergstufe der Schluchseewerk AG November 1976 Peter Franke Wolfgang Frey Talsperren in der Bundesrepublik Deutschland DNK DVWK 1987 ISBN 3 926520 00 0 Retrieved from https en wikipedia org w index php title Hornberg Basin amp oldid 995701003, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.