Gunfleet Sands Offshore Wind Farm is a 172 MW wind farm about 7 kilometres (4.3 mi) off the Clacton-on-Sea coast in the Northern Thames Estuary.

Gunfleet Sands 1 & 3
The farm from a passing ship, 30 September 2010
CountryEngland, United Kingdom
LocationNorthern Thames Estuary 7 km (4.3 mi) off Clacton-on-Sea, Essex
Coordinates51°44′22″N 1°10′28″E / 51.73944°N 1.17444°E / 51.73944; 1.17444
StatusOperational
Construction began2008
Commission date2010
Owner(s)Orsted (51%)
Marubeni Corporation / Bank of Japan (remainder)
Wind farm
TypeOffshore
Power generation
Units operational48
Make and modelSiemens Wind Power SWT-3.6-107
Nameplate capacity172MW
Capacity factor~30-35%
External links
Websitewww.dongenergy.com/gunfleetsands/Pages/Index.aspx
CommonsRelated media on Commons
Wind farm layout

The 108 MW Gunfleet Sands 1 wind farm gained planning consent in 2003/4; in 2006 DONG Energy (now Ørsted) acquired the project and submitted an application for a second 64 MW windfarm Gunfleet Sands 2 adjacent to the first, which received consent in 2008. Construction of both mounting Siemens Wind Power SWT-3.6-107 turbines took place between 2008 and 2010.

In 2010 planning began on a demonstration project Gunfleet Sands 3, used to test Siemens' 6 MW wind turbine model; two such turbines were installed in 2013.

Gunfleet Sands 1 & 2 edit

Gunfleet Sands 1 & 2 are 7 km southeast of Clacton-on-Sea, Essex; in water at depths of 2 to 15 m (6 ft 7 in to 49 ft 3 in) (given spring-to-neap tidal range of about 4.6 m); Gunfleet 1 consists of 30 turbines in a 5×6 array, whilst Gunfleet 2 consists of a 9×2 array adjacent, to the southeast; the installed capacities are 108 and 64 MW respectively. The average wind speed is 8.8 m/s (29 ft/s) at 60 m elevation.[1]

The turbines connect to a 33 kV offshore substation, which steps up the transmission voltage to 132 kV; the export cable makes landfall at Holland Haven (next to Holland-on-Sea), and underground cables connect it to the National Grid at the Cooks Green substation.[2][3]

Development edit

Such development near Clacton-on-Sea began in 1996 under Windmaster Developments;[4] Windmaster was acquired by Enron in 2000, and passed to General Electric (GE Wind Energy) in 2002.[5] A Round 1 concession for the development was awarded in 2001, and planning consents obtained in 2003/4.[1][6][7]

In June 2006 a consent application and environmental statement was submitted to the Department of Trade and Industry for permission to build and operate an extension (Gunfleet Sands 2) to the consented project: up to 22 further turbines with an additional capacity of 64 MW.[8] In December 2006 DONG Energy acquired the 100-megawatt "Gunfleet 1" project from GE.[9]

A contract for 30 Siemens Wind Power 3.6 MW turbines was signed in April 2007.[10]

The application for Gunfleet Sands 2 rested with decision maker the Department for Business Enterprise and Regulatory Reform in June 2007,[11] who gave its permission the next year.[1]

Construction edit

 
Turbines visible from Clacton-on-Sea beyond Clacton Pier

Construction began in 2008, with initial work including onshore infrastructure and cable installation.[11] A formal groundbreaking ceremony was held in April 2008.[12] The first turbine was installed in April 2009.[13]

MT Højgaard was contracted to instal the monopile foundations; work started in October 2008;[14] Sif supplied the monopiles and transition pieces,[15] and Smulders supplied the wind turbine foundations,[16]

The cabling was supplied by Prysmian,[17][18] Bladt Industries constructed the offshore monopile substation superstructure,[18][19] with electrical equipment supplied by Areva T&D and ABB Group.[18]

Construction of the wind farm was delayed, due to cable layer Oceanteam going into administration in May 2009 and the breakdown of liftboat KS Titan 2.[20]

Electrical generation began in August 2009.[21] The wind farm was fully operational by March 2010; the wind farm was formally opened on 15 June 2010 by Anders Eldrup (DONG Energy) and the UK's Energy Minister Charles Hendry. Cost of the development was 4 billion Danish Kroner.[22] Large-scale development of British wind farms was enabled by their kickstart subsidies: set in 2010 at a long term rate of 1.20 Danish Kroner per kWh, compared to about 0.50 Kroner (Horns Rev 2) in Denmark.[23]

An operations and servicing center was built in Brightlingsea, Essex where a former boatyard stood.[24][25][26]

 
Satellite image of the Thames Estuary with Gunfleet Sands top left.

Operational history edit

The wind farm produced between 450 and 520 GWh between 2010 and 2012, with a capacity factor of 31–35% (2011/12).[27] Its levelised cost has been put at £122 per MWh.[28]

The transmission assets were divested in July 2011 to TC Gunfleet Sands OFTO Limited due to regulatory change.[29]

In September 2011 Marubeni Corporation acquired a 49.9% shareholding of the farm for £200 million.[30] In 2013 Marubeni divested part of its stake to the Development Bank of Japan.[31]

During the St Jude storm of October 2013, wind speeds of 65 metres per second (150 mph) were measured at the wind farm.[32]

Gunfleet Sands 3 edit

Gunfleet Sands 3
 
 
Official nameGunfleet Sands demonstration project
Country
  • United Kingdom
Location
Coordinates51°42′11″N 1°11′28″E / 51.703°N 1.191°E / 51.703; 1.191
StatusOperational
Commission date
  • 2010
Owner(s)
Wind farm
Type
Power generation
Units operational2
Make and modelSiemens Wind Power SWT-6.0-120
Nameplate capacity
  • 172 MW
External links
Websitewww.dongenergy.com/gunfleetsands/Pages/Index.aspx
CommonsRelated media on Commons

Ambit edit

A planning application for the Gunfleet Sands 3 - Demonstration Project (GFS 3) was submitted in 2010. The project consisted of a wind farm about 1 km2 (0.39 sq mi) 8.5 km southeast of Clacton. It was for testing new wind farm equipment ready for the Round 3 wind farm letting process. Two wind turbine installations were proposed.[33]

The development required a separate export cable and grid connection to the prior farm; a planning application for the onshore electrical facilities and cabling was submitted in November 2011.[34]

Suppliers edit

Inter-array and export cables (at 33 kV) were supplied by JDR Cables.[35]

The monopile foundations and transition pieces were supplied by Bladt Industries and installed by Ballast Nedam in 2012.[36][37] Two Siemens 6MW turbines were installed in January 2013 by A2SEA.[38]

Productivity edit

The site began generating power in April 2013.[39] A blade replacement took place in mid 2013 after one of the tips was damaged.[40] The facility was officially opened on 12 September 2013 by UK Energy Minister Greg Barker.[41][42]

See also edit

References edit

  1. ^ a b c Hjelmsted 2008, p. 6.
  2. ^ About Gunfleet Sands (Dong) Offshore substation
  3. ^ Sources:
    • "(03/00011/FUL) Excavation of trench and drilling for installation of electric cable between an off-shore wind farm and the electricity sub-station, and extension to existing sub-station". Tendring District Council. 3 January 2003. from the original on 29 April 2014. Retrieved 29 April 2014.
    • "(06/00445/FUL) Alteration to application 03/00011/FUL". Tendring District Council. 13 March 2006. from the original on 29 April 2014. Retrieved 29 April 2014.
    • "(08/00421/FUL) Installation of electric cable between a consented off-shore wind farm and existing electricity substation. (Modification to planning permission 03/00011/FUL awarded on 4th March 2003 and subsequent planning permission 06/00445/FUL)". Tendring District Council. 11 March 2008. from the original on 29 April 2014. Retrieved 29 April 2014.
  4. ^ Schoon, Nicholas (12 February 1997). "Giant turbines star in end of the pier show at Clacton". www.independent.co.uk. from the original on 6 October 2016. Retrieved 29 August 2017.
  5. ^ "Wind Energy Power Plants in the UK - offshore". The Power Plants Around the World Photo Gallery (www.industcards.com). Gunfleet Sands. Archived from the original on 29 April 2014. Retrieved 5 October 2016.
  6. ^ "Essex sand bank is site for wind farm". eadt.co.uk. 23 October 2003. from the original on 29 April 2014. Retrieved 29 April 2014.
  7. ^ "The Gunfleet Sands Offshore Wind Farm Order 2004" (Statutory Instrument). 2004. from the original on 20 February 2022. Retrieved 29 April 2014.
  8. ^ "Gunfleet Sands 2 – Project Briefing Note Number 1" (PDF). Dong Energy. 18 June 2006. (PDF) from the original on 29 April 2014. Retrieved 29 April 2014.
  9. ^ "DONG Energy expands its UK offshore wind portfolio". www.dongenergy.com. 18 December 2006. from the original on 29 April 2014. Retrieved 29 April 2014.
  10. ^ "DONG Energy signs contract for delivery of wind turbines for Gunfleet Sands Offshore Wind Farm". www.dongenergy.com. 19 April 2007. from the original on 29 April 2014. Retrieved 29 April 2014.
  11. ^ a b "Gunfleet Sands – Project Briefing Note Number 2" (PDF). DONG Energy. 11 February 2008. (PDF) from the original on 29 April 2014. Retrieved 29 April 2014.
  12. ^ "Gunfleet Sands – Project Briefing Note Number 3" (PDF). DONG Energy. 30 April 2008. (PDF) from the original on 29 April 2014. Retrieved 29 April 2014.
  13. ^ "First Round 2-turbine installed at DONG Energy's Gunfleet Sands Offshore Wind Farm project". www.dongenergy.co.uk. 1 April 2009. from the original on 20 February 2022. Retrieved 29 April 2014.
  14. ^ "Gunfleet Sands - a challenging location". mth.com. 25 May 2010. from the original on 29 April 2014. Retrieved 29 April 2014.
  15. ^ (PDF). ww.sif-group.com. Archived from the original (PDF) on 24 April 2014. Retrieved 29 April 2014.
  16. ^ "Gunfleet Sands Project". www.smulders-foundations.com. from the original on 29 April 2014. Retrieved 29 April 2014.
  17. ^ [dead link]"Prysmian secures strategic cable contracts worth a total 35 Million Euro for major Offshore Wind Power Plants". investoren.prysmian.com (Press release). 14 November 2007. from the original on 20 February 2022. Retrieved 29 April 2014.
  18. ^ a b c Gunfleet Sands Offshore Wind Farm (LORC) Substations, Inter-Array & Export Cables
  19. ^ . www.stateofgreen.com. Archived from the original on 29 April 2014. Retrieved 29 April 2014.
  20. ^ Dwan, James. "Gunfleet Sands wind farm firm goes under". from the original on 5 June 2009. Retrieved 7 February 2010.
  21. ^ "First power from the first Round 2 offshore wind farm — DONG Energy's Gunfleet Sands project". www.dongenergy.co.uk. 20 August 2009. from the original on 20 February 2022. Retrieved 29 April 2014.
  22. ^ Holm, Erik (15 June 2010). "Briterne runder 1 GW vindkraft". ing.dk (in Danish). from the original on 17 June 2010. Retrieved 15 June 2010.
  23. ^ Holm, Erik (16 June 2010). "Massiv udbygning skal gøre Storbritannien førende inden for havvind". ing.dk (in Danish). from the original on 17 June 2010. Retrieved 16 June 2010.
  24. ^ Brading, Wendy (17 January 2009). "Brightlingsea: Wind farm construction bringing money into town". www.essexcountystandard.co.uk. from the original on 29 April 2014. Retrieved 29 April 2014.
  25. ^ About Gunfleet Sands (Dong) Operation and maintenance
  26. ^ "(08/01225/FUL) Demolition of existing boat building yard and outbuildings and erection of new three storey office accommodation ..." Tendring District Council. 29 August 2009. from the original on 29 April 2014. Retrieved 29 April 2014.
  27. ^ Gunfleet Sands Offshore Wind Farm (LORC) Production & Performance
  28. ^ Aldersey-Williams, John; Broadbent, Ian; Strachan, Peter (2019). "Better estimates of LCOE from audited accounts – A new methodology with examples from United Kingdom offshore wind and CCGT". Energy Policy. 128: 25–35. doi:10.1016/j.enpol.2018.12.044. hdl:10059/3298.
  29. ^ "Terms in place for the divestment of the transmission assets af the Gunfleet Sands offshore wind farm". www.dongenergy.com. 19 July 2011. from the original on 29 April 2014. Retrieved 29 April 2014.
  30. ^ "Marubeni Corporation to become co-owner of Gunfleet Sands offshore wind farm". www.dongenergy.com (Press release). from the original on 29 April 2014. Retrieved 29 April 2014.
  31. ^ "Marubeni Corporation to Divest Part of Gunfleet Sands Offshore Wind Farm Shares". www.marubeni.com. 27 December 2013. from the original on 29 April 2014. Retrieved 29 April 2014.
  32. ^ Holm, Erik; Wittrup, Sanne (29 October 2013). "Tre havvindparker koblede ud under stormen". ing.dk (in Danish). from the original on 1 November 2013. Retrieved 29 October 2013.
  33. ^ Gunfleet Sands 3 - Environmental statement (Non-tech.) (December 2010) pp.2,3
  34. ^ "(1/01311/FUL) Installation of cables in conjunction with the Gunfleet Sands Wind Farm from landfall at Martello Bay coach and car park to the Veolia Water site at the Waterglade Retail Park and the erection of a substation at the Veolia Water Site". Tendring District Council. 1 November 2011. from the original on 29 April 2014. Retrieved 29 April 2014.
  35. ^ "Gunfleet Sands". jdrglobal.com. from the original on 29 April 2014. Retrieved 29 April 2014.
  36. ^ . renews.biz. 30 August 2012. Archived from the original on 29 April 2014. Retrieved 29 April 2014.
  37. ^ "Gunfleet Sands 3 Offshore Wind Farm" (PDF). Ballast Nedam Offshore. (PDF) from the original on 29 April 2014. Retrieved 29 April 2014.
  38. ^ "Siemens giants go up at Gunfleet". renews.biz. 30 January 2013. from the original on 29 April 2014. Retrieved 29 April 2014.
  39. ^ "Siemens 6MW Offshore Wind Turbines Produce First Power at Gunfleet Sands (UK)". www.offshorewind.biz. 18 April 2013. from the original on 29 April 2014. Retrieved 29 April 2014.
  40. ^ "Blade swap complete at Gunfleet 3". renews.biz. 14 August 2013. from the original on 29 April 2014. Retrieved 29 April 2014.
  41. ^ "Next generation of offshore turbines tested at gunfleet sands". Department of Energy & Climate Change. 12 September 2013. from the original on 29 April 2014. Retrieved 29 April 2014.
  42. ^ "Dong Opens Gunfleet Sands Demo Site". www.breakbulk.com. 13 September 2013. from the original on 29 April 2014. Retrieved 29 April 2014.

Sources edit

Gunfleet 1 & 2
  • "About Gunfleet Sands". www.dongenergy.com. from the original on 25 January 2013.
    • "Gunfleet Sands 1 & 2" (PDF). DONG Energy. May 2010. (PDF) from the original on 13 August 2012.
  • Hjelmsted, Per (2008). (PDF). Dansk Vindkraftkonference. DONG Energy. Archived from the original (PDF) on 29 April 2014. Retrieved 29 April 2014.
  • "Gunfleet Sands Offshore Wind Farm". www.lorc.dk. from the original on 26 March 2011. Retrieved 9 June 2011.
Gunfleet 3
  • "Gunfleet Sands 3 - Demonstration Project - Environmental Statement - Non-Technical Summary" (PDF). DONG Energy. December 2010. (PDF) from the original on 29 April 2014. Retrieved 29 April 2014.
  • "Gunfleet Sands 3 - Demonstration Project". www.4coffshore.com. from the original on 20 February 2022. Retrieved 29 April 2014.

External links edit

"Gunfleet Sands Offshore Wind Farm 7km off Clacton On Sea Essex". www.youtube.com. BBC. Archived from the original on 20 December 2021.

gunfleet, sands, offshore, wind, farm, wind, farm, about, kilometres, clacton, coast, northern, thames, estuary, gunfleet, sands, 3the, farm, from, passing, ship, september, 2010countryengland, united, kingdomlocationnorthern, thames, estuary, clacton, essexco. Gunfleet Sands Offshore Wind Farm is a 172 MW wind farm about 7 kilometres 4 3 mi off the Clacton on Sea coast in the Northern Thames Estuary Gunfleet Sands 1 amp 3The farm from a passing ship 30 September 2010CountryEngland United KingdomLocationNorthern Thames Estuary 7 km 4 3 mi off Clacton on Sea EssexCoordinates51 44 22 N 1 10 28 E 51 73944 N 1 17444 E 51 73944 1 17444StatusOperationalConstruction began2008Commission date2010Owner s Orsted 51 Marubeni Corporation Bank of Japan remainder Wind farmTypeOffshorePower generationUnits operational48Make and modelSiemens Wind Power SWT 3 6 107Nameplate capacity172MWCapacity factor 30 35 External linksWebsitewww wbr dongenergy wbr com wbr gunfleetsands wbr Pages wbr Index wbr aspxCommonsRelated media on Commons edit on Wikidata Wind farm layout The 108 MW Gunfleet Sands 1 wind farm gained planning consent in 2003 4 in 2006 DONG Energy now Orsted acquired the project and submitted an application for a second 64 MW windfarm Gunfleet Sands 2 adjacent to the first which received consent in 2008 Construction of both mounting Siemens Wind Power SWT 3 6 107 turbines took place between 2008 and 2010 In 2010 planning began on a demonstration project Gunfleet Sands 3 used to test Siemens 6 MW wind turbine model two such turbines were installed in 2013 Contents 1 Gunfleet Sands 1 amp 2 1 1 Development 1 2 Construction 1 3 Operational history 2 Gunfleet Sands 3 2 1 Ambit 2 2 Suppliers 2 3 Productivity 3 See also 4 References 4 1 Sources 5 External linksGunfleet Sands 1 amp 2 editGunfleet Sands 1 amp 2 are 7 km southeast of Clacton on Sea Essex in water at depths of 2 to 15 m 6 ft 7 in to 49 ft 3 in given spring to neap tidal range of about 4 6 m Gunfleet 1 consists of 30 turbines in a 5 6 array whilst Gunfleet 2 consists of a 9 2 array adjacent to the southeast the installed capacities are 108 and 64 MW respectively The average wind speed is 8 8 m s 29 ft s at 60 m elevation 1 The turbines connect to a 33 kV offshore substation which steps up the transmission voltage to 132 kV the export cable makes landfall at Holland Haven next to Holland on Sea and underground cables connect it to the National Grid at the Cooks Green substation 2 3 Development edit Such development near Clacton on Sea began in 1996 under Windmaster Developments 4 Windmaster was acquired by Enron in 2000 and passed to General Electric GE Wind Energy in 2002 5 A Round 1 concession for the development was awarded in 2001 and planning consents obtained in 2003 4 1 6 7 In June 2006 a consent application and environmental statement was submitted to the Department of Trade and Industry for permission to build and operate an extension Gunfleet Sands 2 to the consented project up to 22 further turbines with an additional capacity of 64 MW 8 In December 2006 DONG Energy acquired the 100 megawatt Gunfleet 1 project from GE 9 A contract for 30 Siemens Wind Power 3 6 MW turbines was signed in April 2007 10 The application for Gunfleet Sands 2 rested with decision maker the Department for Business Enterprise and Regulatory Reform in June 2007 11 who gave its permission the next year 1 Construction edit nbsp Turbines visible from Clacton on Sea beyond Clacton PierConstruction began in 2008 with initial work including onshore infrastructure and cable installation 11 A formal groundbreaking ceremony was held in April 2008 12 The first turbine was installed in April 2009 13 MT Hojgaard was contracted to instal the monopile foundations work started in October 2008 14 Sif supplied the monopiles and transition pieces 15 and Smulders supplied the wind turbine foundations 16 The cabling was supplied by Prysmian 17 18 Bladt Industries constructed the offshore monopile substation superstructure 18 19 with electrical equipment supplied by Areva T amp D and ABB Group 18 Construction of the wind farm was delayed due to cable layer Oceanteam going into administration in May 2009 and the breakdown of liftboat KS Titan 2 20 Electrical generation began in August 2009 21 The wind farm was fully operational by March 2010 the wind farm was formally opened on 15 June 2010 by Anders Eldrup DONG Energy and the UK s Energy Minister Charles Hendry Cost of the development was 4 billion Danish Kroner 22 Large scale development of British wind farms was enabled by their kickstart subsidies set in 2010 at a long term rate of 1 20 Danish Kroner per kWh compared to about 0 50 Kroner Horns Rev 2 in Denmark 23 An operations and servicing center was built in Brightlingsea Essex where a former boatyard stood 24 25 26 nbsp Satellite image of the Thames Estuary with Gunfleet Sands top left Operational history edit The wind farm produced between 450 and 520 GWh between 2010 and 2012 with a capacity factor of 31 35 2011 12 27 Its levelised cost has been put at 122 per MWh 28 The transmission assets were divested in July 2011 to TC Gunfleet Sands OFTO Limited due to regulatory change 29 In September 2011 Marubeni Corporation acquired a 49 9 shareholding of the farm for 200 million 30 In 2013 Marubeni divested part of its stake to the Development Bank of Japan 31 During the St Jude storm of October 2013 wind speeds of 65 metres per second 150 mph were measured at the wind farm 32 Gunfleet Sands 3 editGunfleet Sands 3 nbsp nbsp Official nameGunfleet Sands demonstration projectCountryUnited KingdomLocationGunfleet SandsCoordinates51 42 11 N 1 11 28 E 51 703 N 1 191 E 51 703 1 191StatusOperationalCommission date2010Owner s Development Bank of JapanJERAOrstedWind farmTypeOffshorePower generationUnits operational2Make and modelSiemens Wind Power SWT 6 0 120Nameplate capacity172 MWExternal linksWebsitewww wbr dongenergy wbr com wbr gunfleetsands wbr Pages wbr Index wbr aspxCommonsRelated media on Commons edit on Wikidata Ambit edit A planning application for the Gunfleet Sands 3 Demonstration Project GFS 3 was submitted in 2010 The project consisted of a wind farm about 1 km2 0 39 sq mi 8 5 km southeast of Clacton It was for testing new wind farm equipment ready for the Round 3 wind farm letting process Two wind turbine installations were proposed 33 The development required a separate export cable and grid connection to the prior farm a planning application for the onshore electrical facilities and cabling was submitted in November 2011 34 Suppliers edit Inter array and export cables at 33 kV were supplied by JDR Cables 35 The monopile foundations and transition pieces were supplied by Bladt Industries and installed by Ballast Nedam in 2012 36 37 Two Siemens 6MW turbines were installed in January 2013 by A2SEA 38 Productivity edit The site began generating power in April 2013 39 A blade replacement took place in mid 2013 after one of the tips was damaged 40 The facility was officially opened on 12 September 2013 by UK Energy Minister Greg Barker 41 42 See also edit nbsp England portal nbsp Weather portal nbsp Renewable energy portal Wind power in the United Kingdom List of offshore wind farms in the United Kingdom List of offshore wind farms in the North Sea List of offshore wind farmsReferences edit a b c Hjelmsted 2008 p 6 About Gunfleet Sands Dong Offshore substation Sources 03 00011 FUL Excavation of trench and drilling for installation of electric cable between an off shore wind farm and the electricity sub station and extension to existing sub station Tendring District Council 3 January 2003 Archived from the original on 29 April 2014 Retrieved 29 April 2014 06 00445 FUL Alteration to application 03 00011 FUL Tendring District Council 13 March 2006 Archived from the original on 29 April 2014 Retrieved 29 April 2014 08 00421 FUL Installation of electric cable between a consented off shore wind farm and existing electricity substation Modification to planning permission 03 00011 FUL awarded on 4th March 2003 and subsequent planning permission 06 00445 FUL Tendring District Council 11 March 2008 Archived from the original on 29 April 2014 Retrieved 29 April 2014 Schoon Nicholas 12 February 1997 Giant turbines star in end of the pier show at Clacton www independent co uk Archived from the original on 6 October 2016 Retrieved 29 August 2017 Wind Energy Power Plants in the UK offshore The Power Plants Around the World Photo Gallery www industcards com Gunfleet Sands Archived from the original on 29 April 2014 Retrieved 5 October 2016 Essex sand bank is site for wind farm eadt co uk 23 October 2003 Archived from the original on 29 April 2014 Retrieved 29 April 2014 The Gunfleet Sands Offshore Wind Farm Order 2004 Statutory Instrument 2004 Archived from the original on 20 February 2022 Retrieved 29 April 2014 Gunfleet Sands 2 Project Briefing Note Number 1 PDF Dong Energy 18 June 2006 Archived PDF from the original on 29 April 2014 Retrieved 29 April 2014 DONG Energy expands its UK offshore wind portfolio www dongenergy com 18 December 2006 Archived from the original on 29 April 2014 Retrieved 29 April 2014 DONG Energy signs contract for delivery of wind turbines for Gunfleet Sands Offshore Wind Farm www dongenergy com 19 April 2007 Archived from the original on 29 April 2014 Retrieved 29 April 2014 a b Gunfleet Sands Project Briefing Note Number 2 PDF DONG Energy 11 February 2008 Archived PDF from the original on 29 April 2014 Retrieved 29 April 2014 Gunfleet Sands Project Briefing Note Number 3 PDF DONG Energy 30 April 2008 Archived PDF from the original on 29 April 2014 Retrieved 29 April 2014 First Round 2 turbine installed at DONG Energy s Gunfleet Sands Offshore Wind Farm project www dongenergy co uk 1 April 2009 Archived from the original on 20 February 2022 Retrieved 29 April 2014 Gunfleet Sands a challenging location mth com 25 May 2010 Archived from the original on 29 April 2014 Retrieved 29 April 2014 Sif References Offshore wind PDF ww sif group com Archived from the original PDF on 24 April 2014 Retrieved 29 April 2014 Gunfleet Sands Project www smulders foundations com Archived from the original on 29 April 2014 Retrieved 29 April 2014 dead link Prysmian secures strategic cable contracts worth a total 35 Million Euro for major Offshore Wind Power Plants investoren prysmian com Press release 14 November 2007 Archived from the original on 20 February 2022 Retrieved 29 April 2014 a b c Gunfleet Sands Offshore Wind Farm LORC Substations Inter Array amp Export Cables Gunfleet Sands Offshore www stateofgreen com Archived from the original on 29 April 2014 Retrieved 29 April 2014 Dwan James Gunfleet Sands wind farm firm goes under Archived from the original on 5 June 2009 Retrieved 7 February 2010 First power from the first Round 2 offshore wind farm DONG Energy s Gunfleet Sands project www dongenergy co uk 20 August 2009 Archived from the original on 20 February 2022 Retrieved 29 April 2014 Holm Erik 15 June 2010 Briterne runder 1 GW vindkraft ing dk in Danish Archived from the original on 17 June 2010 Retrieved 15 June 2010 Holm Erik 16 June 2010 Massiv udbygning skal gore Storbritannien forende inden for havvind ing dk in Danish Archived from the original on 17 June 2010 Retrieved 16 June 2010 Brading Wendy 17 January 2009 Brightlingsea Wind farm construction bringing money into town www essexcountystandard co uk Archived from the original on 29 April 2014 Retrieved 29 April 2014 About Gunfleet Sands Dong Operation and maintenance 08 01225 FUL Demolition of existing boat building yard and outbuildings and erection of new three storey office accommodation Tendring District Council 29 August 2009 Archived from the original on 29 April 2014 Retrieved 29 April 2014 Gunfleet Sands Offshore Wind Farm LORC Production amp Performance Aldersey Williams John Broadbent Ian Strachan Peter 2019 Better estimates of LCOE from audited accounts A new methodology with examples from United Kingdom offshore wind and CCGT Energy Policy 128 25 35 doi 10 1016 j enpol 2018 12 044 hdl 10059 3298 Terms in place for the divestment of the transmission assets af the Gunfleet Sands offshore wind farm www dongenergy com 19 July 2011 Archived from the original on 29 April 2014 Retrieved 29 April 2014 Marubeni Corporation to become co owner of Gunfleet Sands offshore wind farm www dongenergy com Press release Archived from the original on 29 April 2014 Retrieved 29 April 2014 Marubeni Corporation to Divest Part of Gunfleet Sands Offshore Wind Farm Shares www marubeni com 27 December 2013 Archived from the original on 29 April 2014 Retrieved 29 April 2014 Holm Erik Wittrup Sanne 29 October 2013 Tre havvindparker koblede ud under stormen ing dk in Danish Archived from the original on 1 November 2013 Retrieved 29 October 2013 Gunfleet Sands 3 Environmental statement Non tech December 2010 pp 2 3 1 01311 FUL Installation of cables in conjunction with the Gunfleet Sands Wind Farm from landfall at Martello Bay coach and car park to the Veolia Water site at the Waterglade Retail Park and the erection of a substation at the Veolia Water Site Tendring District Council 1 November 2011 Archived from the original on 29 April 2014 Retrieved 29 April 2014 Gunfleet Sands jdrglobal com Archived from the original on 29 April 2014 Retrieved 29 April 2014 Bladt ships Gunfleet feet renews biz 30 August 2012 Archived from the original on 29 April 2014 Retrieved 29 April 2014 Gunfleet Sands 3 Offshore Wind Farm PDF Ballast Nedam Offshore Archived PDF from the original on 29 April 2014 Retrieved 29 April 2014 Siemens giants go up at Gunfleet renews biz 30 January 2013 Archived from the original on 29 April 2014 Retrieved 29 April 2014 Siemens 6MW Offshore Wind Turbines Produce First Power at Gunfleet Sands UK www offshorewind biz 18 April 2013 Archived from the original on 29 April 2014 Retrieved 29 April 2014 Blade swap complete at Gunfleet 3 renews biz 14 August 2013 Archived from the original on 29 April 2014 Retrieved 29 April 2014 Next generation of offshore turbines tested at gunfleet sands Department of Energy amp Climate Change 12 September 2013 Archived from the original on 29 April 2014 Retrieved 29 April 2014 Dong Opens Gunfleet Sands Demo Site www breakbulk com 13 September 2013 Archived from the original on 29 April 2014 Retrieved 29 April 2014 Sources edit Gunfleet 1 amp 2 About Gunfleet Sands www dongenergy com Archived from the original on 25 January 2013 Gunfleet Sands 1 amp 2 PDF DONG Energy May 2010 Archived PDF from the original on 13 August 2012 Hjelmsted Per 2008 DONG Energy s internationale Havmolleaktiviteter PDF Dansk Vindkraftkonference DONG Energy Archived from the original PDF on 29 April 2014 Retrieved 29 April 2014 Gunfleet Sands Offshore Wind Farm www lorc dk Archived from the original on 26 March 2011 Retrieved 9 June 2011 Gunfleet 3 Gunfleet Sands 3 Demonstration Project Environmental Statement Non Technical Summary PDF DONG Energy December 2010 Archived PDF from the original on 29 April 2014 Retrieved 29 April 2014 Gunfleet Sands 3 Demonstration Project www 4coffshore com Archived from the original on 20 February 2022 Retrieved 29 April 2014 External links edit nbsp Wikimedia Commons has media related to Gunfleet Sands Wind Farm Gunfleet Sands Offshore Wind Farm 7km off Clacton On Sea Essex www youtube com BBC Archived from the original on 20 December 2021 Retrieved from https en wikipedia org w index php title Gunfleet Sands Offshore Wind Farm amp oldid 1194745526, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.