fbpx
Wikipedia

Groombridge railway station

Groombridge railway station is a station on the Spa Valley Railway (SVR) in Groombridge, East Sussex, England. Once a busy station serving four directions, it closed in 1985 to British Rail services. A new station the other side of Station Road bridge was opened by the SVR in 1997 as part of a standard gauge heritage railway to Tunbridge Wells West.

Groombridge
Station on heritage railway
General information
LocationGroombridge, Wealden, East Sussex
England
Coordinates51°06′43″N 0°11′16″E / 51.11194°N 0.18778°E / 51.11194; 0.18778
Grid referenceTQ533372
Owned bySouthern Railway
Southern Region of British Railways
Spa Valley Railway
Managed byLondon, Brighton and South Coast Railway
Platformsnew station 1 (original station 3)
Key dates
1 October 1866Opened
4 November 1968Goods facilities withdrawn
8 July 1985[1]Closed to passengers
August 1997Reopened by Spa Valley Railway

Early years edit

The first Groombridge station was opened in 1866 by the London, Brighton and South Coast Railway (LBSCR) when it extended its Three Bridges to Tunbridge Wells Central Line to Tunbridge Wells.

Two years later, the station's importance increased with the completion of the line from Lewes. At that time, trains from Lewes and Uckfield could only reach East Grinstead by reversing at Groombridge.

In 1878, authority was obtained to lay a single-track spur south of Ashurst Junction, which would enable services to bypass Groombridge. Although completed in 1888, this spur remained largely unused until 1914. It was eventually doubled to handle increased traffic on the Cuckoo Line and regular services to Uckfield.[2] This reduced the importance of Groombridge as a junction station, as direct Victoria - Crowborough/Uckfield services no longer had to reverse at there. The opening of the spur meant that more services were routed through Eridge, which became the point where London trains were divided for the two lines south.[3] To compensate for this loss, slip coaches were shed from some down trains at Ashurst.[4]

Upon the completion of the Cuckoo Line in 1880, which opened up a route to Eastbourne via Polegate, the line between Eridge and Groombridge was doubled. At the same time, a crossover was constructed on the western side of the station, together with associated signalling equipment, and later the Groombridge West signal box.[4] A second box, "Groombridge Junction", was provided on the opening of the Cuckoo Line, and a third, "Groombridge West" (the first box's name was changed to "Groombridge East"), was added in 1888 after the opening of the Oxted Line. Within 10 years of nationalisation, the three signal boxes had been closed by British Rail and replaced by a single box on 23 November 1958 when the Groombridge section was resignalled.[5]

Main station building edit

 
Groombridge Station frontage

Designed by Charles Henry Driver,[6] the Groombridge station building is located on the east side of Station Road, and is architecturally designed to be "the exact counterpart in miniature of Tunbridge Wells".[7] The building is made of red brick with string courses of blue and white brick, and features coloured brick reveals on the doors and windows. Originally, the stationmaster's residence was on the western side of the building, adjacent to a booking hall. A new goods and parcels office was added to the eastern end of the building, next to the gentlemen's toilets.[8]

The station was equipped with three platform faces, with the main station platform used for down trains, and the far side of the island platform served the up trains. A double track ran through the station, with a third line splaying out to the other side of the island before merging once again with the line to Tunbridge Wells.[9] A subway led from the main platform to the island platform, which previously had no passenger facilities until 1896; upon the urging of a passenger, a waiting room and buffet were added at a cost of £2,300.[8]

Four sets of goods sidings lay to the north of the main station, serving a carriage dock, blacksmith's shop, and stable.[9] The extensive goods yard and generous facilities did not, however, see much use, and the Southern Railway used the station as a collection point for empty wagons and, at one point, as a holding yard for Tunbridge-bound trains.[5]

A footbridge was installed in 1889 to the west of the station, replacing deep cutting steps that led down the embankment on either side of the footpath; the use of those steps was becoming more dangerous with the increasing traffic. By 1899, the levels of traffic generated from the Oxted Line prompted the LBSCR to invest in extending the island platform and re-aligning the track around it.

Decline edit

 
Notice announcing the line's closure in 1985

Prior to 1965, north-south train services ran in two sections: Victoria - Tunbridge Wells West, and Tunbridge Wells West - Brighton/Eastbourne; the two sections were interconnected at Groombridge, where Eastbourne and Tunbridge Wells coaches were detached from London trains.[10] The traffic grew from around 80 trains per day in the 1900s to 120 in the 1930s and more than 200 per day in the 1950s.[11] However, the pattern of operations changed significantly in the wake of the Beeching Report, when the relative importance of Groombridge and Eridge as railway junctions diminished with the closure of one after another of the lines in the area. The Cuckoo Line was the first to go in June 1965, followed by the line from Three Bridges and East Grinstead in January 1967, and then the Uckfield line to the south of Uckfield in 1969. The line between Ashurst Junction and Groombridge was taken out on 5 January 1969. At the same time, the 1958 signal box was closed, leaving the block signalling section between Tunbridge Wells West and Birchden Junction.[12]

 
State of the station shortly after closure

The section from Birchden Junction to Grove Junction remained open with an hourly off-peak 3-coach DEMU shuttle between Eridge and Tonbridge, with connecting services at Eridge provided for Uckfield line passengers.[13] By the 1980s, the section had been gradually run down with little maintenance, disruptions to service patterns, and the reduction of services to a dozen or so per day. All of these factors took its toll on passenger numbers, although some commuter traffic remained.[14]

Groombridge station was staffed on the morning shift only by the wife of a railwayman at Tunbridge Wells West, who kept the station clean and presentable, while the tracks outside became overgrown. The 1958 signal box remained boarded-up, and the goods yard contained a moribund coal merchant's business. In 1985, the Department for Transport gave British Rail permission to close the line from Eridge to Tunbridge Wells with the alternative bus services being provided. It was announced that the last service would run on 6 July. Empty carriage stock trains continued to pass through the station until the last train on 10 August 1985, after which the line was closed completely.[14]

A private company called "Surrey Downs Ltd" proposed running a joint service with BR from Tonbridge to Uckfield, but this never materialised amid scepticism from BR that somebody outside the industry could make a loss-making line pay.[14]

Revival edit

 
Spa Valley Railway Platform (looking towards High Rocks)

The Spa Valley Railway obtained the trackbed between Tunbridge Wells West and Birchden Junction in 1996. After much hard work, the public service from Tunbridge Wells West to Groombridge was reinstated in August 1997.[15] As the original Groombridge station building had been turned into a private residence, and the old ticket offices now serve as offices for a local financial adviser, a new station had to be constructed on the opposite side of the road bridge. Access to the new station is provided via the old main station platform, which has been extended. The new single track had to be laid to curve along the trackbed of the old up-loop line into the new station due to houses have been built on part of the former trackbed.[16]

 
Spa Valley Railway Platform

Canopies have been erected on the station, using the former canopy supports from Gravesend West station. The signal box has been updated from the current picture, and the LBSCR signal frame (originally from the Birchden Junction signal box) has been installed, and was first operated on 1 August 2014. A new refreshment kiosk has also been constructed, selling local produce, hot and cold drinks, and ice creams. The section of line between Groombridge to Eridge reopened on 25 March 2011.

References edit

  1. ^ Groombridge railway station at Subterranea Britannica - Nick Catford - Accessed 1 September 2007
  2. ^ Oppitz, Leslie (2001). Lost Railways of Sussex (Lost Railways). Newbury, Berkshire: Countryside Books. p. 69. ISBN 978-1-85306-697-9.
  3. ^ Mitchell, Vic; Smith, Keith (1986). Branch Lines to Tunbridge Wells. Midhurst, West Sussex: Middleton Press. p. 2. ISBN 0-906520-32-0.
  4. ^ a b Elliott, A.C. (1988). The Cuckoo Line. Didcot, Oxon: Wild Swan Publications Ltd. p. 121. ISBN 0-906867-63-0.
  5. ^ a b Elliott 1988, p. 123.
  6. ^ "Opening of the Tunbridge Wells and East Grinstead Branch of the London, Brighton & South Coast Railway". Sussex Advertiser. British Newspaper Archive. 3 October 1866. Retrieved 8 August 2016 – via British Newspaper Archive.
  7. ^ Gould, D. (1983). Three Bridges to Tunbridge Wells (Locomotion Papers no. 144). The Oakwood Press. p. 14. ISBN 0-85361-299-4.
  8. ^ a b Elliott 1988, p. 124.
  9. ^ a b Elliott 1988, pp. 122–3.
  10. ^ Mitchell, Vic; Smith, Keith (1984). Branch Lines to East Grinstead. Midhurst, West Sussex: Middleton Press. plate 92. ISBN 0-906520-07-X.
  11. ^ Hughes, Stephen (March 1984). "'Brighton' Frontier: Requiem?". Railway Magazine. 130 (995): 88.
  12. ^ Gould 1983, pp. 56–57.
  13. ^ Oppitz 2001, pp. 74–75.
  14. ^ a b c Oppitz, Leslie (July 1985). "The Passing of a Line". RailE: 14.
  15. ^ Oppitz 2001, pp. 76–77.
  16. ^ Foster, Richard (July 2007). (PDF). Steam Railway (337): 90. Archived from the original (PDF) on 6 February 2009. Retrieved 27 June 2008.

External links edit

  • Groombridge railway station at Subterranea Britannica

groombridge, railway, station, station, valley, railway, groombridge, east, sussex, england, once, busy, station, serving, four, directions, closed, 1985, british, rail, services, station, other, side, station, road, bridge, opened, 1997, part, standard, gauge. Groombridge railway station is a station on the Spa Valley Railway SVR in Groombridge East Sussex England Once a busy station serving four directions it closed in 1985 to British Rail services A new station the other side of Station Road bridge was opened by the SVR in 1997 as part of a standard gauge heritage railway to Tunbridge Wells West GroombridgeStation on heritage railwayGeneral informationLocationGroombridge Wealden East SussexEnglandCoordinates51 06 43 N 0 11 16 E 51 11194 N 0 18778 E 51 11194 0 18778Grid referenceTQ533372Owned bySouthern Railway Southern Region of British Railways Spa Valley RailwayManaged byLondon Brighton and South Coast RailwayPlatformsnew station 1 original station 3 Key dates1 October 1866Opened4 November 1968Goods facilities withdrawn8 July 1985 1 Closed to passengersAugust 1997Reopened by Spa Valley Railway Contents 1 Early years 2 Main station building 3 Decline 4 Revival 5 References 6 External linksEarly years editThe first Groombridge station was opened in 1866 by the London Brighton and South Coast Railway LBSCR when it extended its Three Bridges to Tunbridge Wells Central Line to Tunbridge Wells Two years later the station s importance increased with the completion of the line from Lewes At that time trains from Lewes and Uckfield could only reach East Grinstead by reversing at Groombridge In 1878 authority was obtained to lay a single track spur south of Ashurst Junction which would enable services to bypass Groombridge Although completed in 1888 this spur remained largely unused until 1914 It was eventually doubled to handle increased traffic on the Cuckoo Line and regular services to Uckfield 2 This reduced the importance of Groombridge as a junction station as direct Victoria Crowborough Uckfield services no longer had to reverse at there The opening of the spur meant that more services were routed through Eridge which became the point where London trains were divided for the two lines south 3 To compensate for this loss slip coaches were shed from some down trains at Ashurst 4 Upon the completion of the Cuckoo Line in 1880 which opened up a route to Eastbourne via Polegate the line between Eridge and Groombridge was doubled At the same time a crossover was constructed on the western side of the station together with associated signalling equipment and later the Groombridge West signal box 4 A second box Groombridge Junction was provided on the opening of the Cuckoo Line and a third Groombridge West the first box s name was changed to Groombridge East was added in 1888 after the opening of the Oxted Line Within 10 years of nationalisation the three signal boxes had been closed by British Rail and replaced by a single box on 23 November 1958 when the Groombridge section was resignalled 5 Main station building edit nbsp Groombridge Station frontage Designed by Charles Henry Driver 6 the Groombridge station building is located on the east side of Station Road and is architecturally designed to be the exact counterpart in miniature of Tunbridge Wells 7 The building is made of red brick with string courses of blue and white brick and features coloured brick reveals on the doors and windows Originally the stationmaster s residence was on the western side of the building adjacent to a booking hall A new goods and parcels office was added to the eastern end of the building next to the gentlemen s toilets 8 The station was equipped with three platform faces with the main station platform used for down trains and the far side of the island platform served the up trains A double track ran through the station with a third line splaying out to the other side of the island before merging once again with the line to Tunbridge Wells 9 A subway led from the main platform to the island platform which previously had no passenger facilities until 1896 upon the urging of a passenger a waiting room and buffet were added at a cost of 2 300 8 Four sets of goods sidings lay to the north of the main station serving a carriage dock blacksmith s shop and stable 9 The extensive goods yard and generous facilities did not however see much use and the Southern Railway used the station as a collection point for empty wagons and at one point as a holding yard for Tunbridge bound trains 5 A footbridge was installed in 1889 to the west of the station replacing deep cutting steps that led down the embankment on either side of the footpath the use of those steps was becoming more dangerous with the increasing traffic By 1899 the levels of traffic generated from the Oxted Line prompted the LBSCR to invest in extending the island platform and re aligning the track around it Decline edit nbsp Notice announcing the line s closure in 1985 Prior to 1965 north south train services ran in two sections Victoria Tunbridge Wells West and Tunbridge Wells West Brighton Eastbourne the two sections were interconnected at Groombridge where Eastbourne and Tunbridge Wells coaches were detached from London trains 10 The traffic grew from around 80 trains per day in the 1900s to 120 in the 1930s and more than 200 per day in the 1950s 11 However the pattern of operations changed significantly in the wake of the Beeching Report when the relative importance of Groombridge and Eridge as railway junctions diminished with the closure of one after another of the lines in the area The Cuckoo Line was the first to go in June 1965 followed by the line from Three Bridges and East Grinstead in January 1967 and then the Uckfield line to the south of Uckfield in 1969 The line between Ashurst Junction and Groombridge was taken out on 5 January 1969 At the same time the 1958 signal box was closed leaving the block signalling section between Tunbridge Wells West and Birchden Junction 12 nbsp State of the station shortly after closure The section from Birchden Junction to Grove Junction remained open with an hourly off peak 3 coach DEMU shuttle between Eridge and Tonbridge with connecting services at Eridge provided for Uckfield line passengers 13 By the 1980s the section had been gradually run down with little maintenance disruptions to service patterns and the reduction of services to a dozen or so per day All of these factors took its toll on passenger numbers although some commuter traffic remained 14 Groombridge station was staffed on the morning shift only by the wife of a railwayman at Tunbridge Wells West who kept the station clean and presentable while the tracks outside became overgrown The 1958 signal box remained boarded up and the goods yard contained a moribund coal merchant s business In 1985 the Department for Transport gave British Rail permission to close the line from Eridge to Tunbridge Wells with the alternative bus services being provided It was announced that the last service would run on 6 July Empty carriage stock trains continued to pass through the station until the last train on 10 August 1985 after which the line was closed completely 14 A private company called Surrey Downs Ltd proposed running a joint service with BR from Tonbridge to Uckfield but this never materialised amid scepticism from BR that somebody outside the industry could make a loss making line pay 14 Revival edit nbsp Spa Valley Railway Platform looking towards High Rocks The Spa Valley Railway obtained the trackbed between Tunbridge Wells West and Birchden Junction in 1996 After much hard work the public service from Tunbridge Wells West to Groombridge was reinstated in August 1997 15 As the original Groombridge station building had been turned into a private residence and the old ticket offices now serve as offices for a local financial adviser a new station had to be constructed on the opposite side of the road bridge Access to the new station is provided via the old main station platform which has been extended The new single track had to be laid to curve along the trackbed of the old up loop line into the new station due to houses have been built on part of the former trackbed 16 nbsp Spa Valley Railway Platform Canopies have been erected on the station using the former canopy supports from Gravesend West station The signal box has been updated from the current picture and the LBSCR signal frame originally from the Birchden Junction signal box has been installed and was first operated on 1 August 2014 A new refreshment kiosk has also been constructed selling local produce hot and cold drinks and ice creams The section of line between Groombridge to Eridge reopened on 25 March 2011 Preceding station nbsp Heritage railways Following station Eridge Spa Valley Railway High Rocks Disused railways Eridge British RailSouthern RegionWealden Line High Rocks Halt British RailSouthern RegionCuckoo Line Withyham British RailSouthern RegionThree Bridges to Tunbridge Wells Central Line High Rocks Halt Ashurst British RailSouthern RegionOxted Line High Rocks HaltReferences edit Groombridge railway station at Subterranea Britannica Nick Catford Accessed 1 September 2007 Oppitz Leslie 2001 Lost Railways of Sussex Lost Railways Newbury Berkshire Countryside Books p 69 ISBN 978 1 85306 697 9 Mitchell Vic Smith Keith 1986 Branch Lines to Tunbridge Wells Midhurst West Sussex Middleton Press p 2 ISBN 0 906520 32 0 a b Elliott A C 1988 The Cuckoo Line Didcot Oxon Wild Swan Publications Ltd p 121 ISBN 0 906867 63 0 a b Elliott 1988 p 123 Opening of the Tunbridge Wells and East Grinstead Branch of the London Brighton amp South Coast Railway Sussex Advertiser British Newspaper Archive 3 October 1866 Retrieved 8 August 2016 via British Newspaper Archive Gould D 1983 Three Bridges to Tunbridge Wells Locomotion Papers no 144 The Oakwood Press p 14 ISBN 0 85361 299 4 a b Elliott 1988 p 124 a b Elliott 1988 pp 122 3 Mitchell Vic Smith Keith 1984 Branch Lines to East Grinstead Midhurst West Sussex Middleton Press plate 92 ISBN 0 906520 07 X Hughes Stephen March 1984 Brighton Frontier Requiem Railway Magazine 130 995 88 Gould 1983 pp 56 57 Oppitz 2001 pp 74 75 a b c Oppitz Leslie July 1985 The Passing of a Line RailE 14 Oppitz 2001 pp 76 77 Foster Richard July 2007 Great Eridge pectations PDF Steam Railway 337 90 Archived from the original PDF on 6 February 2009 Retrieved 27 June 2008 External links editGroombridge railway station at the Spa Valley Railway Groombridge railway station at Subterranea Britannica Retrieved from https en wikipedia org w index php title Groombridge railway station amp oldid 1201865502, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.