fbpx
Wikipedia

Gloucester station (MBTA)

Gloucester station is an MBTA Commuter Rail station in Gloucester, Massachusetts. Located off Railroad Avenue and Washington Street in downtown Gloucester, it serves the Rockport branch of the Newburyport/Rockport Line. The station consists of a single side platform serving the line's single track. The station has a mini-high platform, making it accessible.

Gloucester
Gloucester station looking outbound from Washington Street
General information
Location75 Railroad Avenue
Gloucester, Massachusetts
Coordinates42°37′00″N 70°40′06″W / 42.61675°N 70.66830°W / 42.61675; -70.66830
Line(s)Gloucester Branch
Platforms1 side platform
Tracks1
Connections CATA: Beverly Commuter, Lanesville, Saturday Mall, Gloucester Crossing/Business Express, Stage Fort Park Shuttle (summer)
Construction
Parking100 spaces ($4.00 fee)
Bicycle facilities5 spaces
AccessibleYes
Other information
Fare zone7
History
OpenedDecember 1847
RebuiltSeptember 2005[1]
Passengers
2018296 (weekday average boardings)[2]
Services
Preceding station MBTA Following station
West Gloucester Newburyport/​Rockport Line Rockport
Terminus

History edit

Eastern Railroad and B&M edit

 
Gloucester station on an early postcard

The Eastern Railroad built their Gloucester Branch in 1847, reaching Gloucester on December 1.[3][4] The station was located in downtown Gloucester, at the intersection of Railroad and Maplewood Avenues. Gloucester was the end of the line until November 4, 1861, when the Rockport Railroad extended the branch to Rockport station.[4] Due to the new curve heading to Rockport, a new station was built to the west near Washington Street. The old depot, now on a short spur, was still used for freight service for several decades to come.[5]

Initially, Rockport trains were operated by the Eastern Railroad and met Eastern mainline trains at Beverly. In 1864, trains began to be through-routed to Boston to increase frequencies on the inner part of the trunk line.[4] The Eastern Railroad bought the Rockport Railroad in 1868, but the branch is still known as the Gloucester Branch. By the 1870s, regular commuter service was available.[3][4] The Eastern was leased by the Boston and Maine Railroad in 1885 and merged into it in 1890. In 1911, the branch was doubled-tracked to Gloucester.[3] (Today, the double track ends west of the station). Commuter service continued in the same fashion for decades, with 13 inbound round trips in 1906, 14 trips in 1950, and 11 trips in 1962.[4]

MBTA era edit

 
The accessible mini-high platform, completed in 2005

Gloucester has seen nearly continuous service to Boston since 1848. When the newly formed MBTA began funding commuter rail service in 1965, communities outside the funding district were left to pay for trains to continue stopping. Gloucester and neighboring Rockport initially declined to subsidize service. Service past Manchester was discontinued on January 28, 1965, along with the outer sections of the Fitchburg Line and Central Mass Branch.[6] The MBTA rushed to reach subsidy agreements with out-of-district towns, and after negotiations service was to resume on June 6. After a lawsuit in which the Eastern Massachusetts Street Railway challenged the right of the MBTA to provide out-of-district service, Rockport service resumed on June 28, 1965.[6][7]

The MBTA bought most B&M commuter assets, including the Gloucester Branch, on December 27, 1976.[6] The station building was gone by that time, with a gas station in its place.[8] On January 20, 1984, the North Station approach trestles were destroyed by a fire. Gloucester Branch trains were terminated at a temporary station near Sullivan or bussed from Lynn. On November 16, 1984, the Beverly Draw bridge connecting Salem to Beverly burned, cutting the Rockport Branch and the Ipswich Line from the rest of the system. (All lines running north and west of Newburyport were abandoned by 1984, leaving no route to move equipment to the rest of the northside.) A shuttle train was run from Rockport to Beverly Depot until January 7, 1985, when it was replaced by bus service.[6] The locomotives used were then trucked to Danvers so they could be repaired at the MBTA's main maintenance facility. A new bridge opened on December 1, 1985, reconnecting Gloucester to the larger system.[6]

On June 3, 2004, the MBTA board approved a renovation of the station, including new parking spaces, lighting, and signage, as well as a "mini-high" platform for handicapped accessibility.[9] The $3.4 million rebuilt station was opened in September 2005.[1]

On April 29, 2020, service between West Gloucester and Rockport was indefinitely replaced by buses due to a failure of the old bridge.[10] That June, the MBTA indicated the closure would continue until the completion of the bridge replacement.[11] Regular service to Rockport over the bridge resumed on May 23, 2022.[12]

References edit

  1. ^ a b (PDF). TRANSreport. Boston Metropolitan Planning Organization. October 2005. Archived from the original (PDF) on 16 January 2011. Retrieved 29 December 2012.
  2. ^ Central Transportation Planning Staff (2019). "2018 Commuter Rail Counts". Massachusetts Bay Transportation Authority.
  3. ^ a b c Karr, Ronald Dale (1995). The Rail Lines of Southern New England. Branch Line Press. pp. 264–65. ISBN 0942147022.
  4. ^ a b c d e Humphrey, Thomas J.; Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association. pp. 75–77. ISBN 9780685412947.
  5. ^ "Gloucester". Topographical Atlas of Massachusetts. Walker Lithograph & Publishing Co. 1891 – via Ward Maps.
  6. ^ a b c d e Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  7. ^ Humphrey, Thomas J.; Clark, Norton D. (1986). Boston's Commuter Rail: Second Section. Boston Street Railway Association. p. 10. ISBN 9780938315025.
  8. ^ Henry, Alan P. (August 10, 1977). "There's no depot like an old depot". Boston Globe. p. 3 – via Newspapers.com.
  9. ^ (PDF). TRANSreport. Boston Metropolitan Planning Organization. July 2004. Archived from the original (PDF) on 16 November 2010.
  10. ^ . Massachusetts Bay Transportation Authority. April 29, 2020. Archived from the original on May 1, 2020.
  11. ^ "Newburyport/Rockport Trains between Rockport and West Gloucester Replaced with Shuttle Buses through Summer 2021" (Press release). Massachusetts Bay Transportation Authority. June 9, 2020.
  12. ^ "MBTA Commuter Rail Spring/Summer Schedule to Take Effect May 23" (Press release). Keolis Commuter Services. May 10, 2022.

External links edit

  Media related to Gloucester station (MBTA) at Wikimedia Commons

  • MBTA - Gloucester

gloucester, station, mbta, gloucester, station, mbta, commuter, rail, station, gloucester, massachusetts, located, railroad, avenue, washington, street, downtown, gloucester, serves, rockport, branch, newburyport, rockport, line, station, consists, single, sid. Gloucester station is an MBTA Commuter Rail station in Gloucester Massachusetts Located off Railroad Avenue and Washington Street in downtown Gloucester it serves the Rockport branch of the Newburyport Rockport Line The station consists of a single side platform serving the line s single track The station has a mini high platform making it accessible GloucesterGloucester station looking outbound from Washington StreetGeneral informationLocation75 Railroad AvenueGloucester MassachusettsCoordinates42 37 00 N 70 40 06 W 42 61675 N 70 66830 W 42 61675 70 66830Line s Gloucester BranchPlatforms1 side platformTracks1ConnectionsCATA Beverly Commuter Lanesville Saturday Mall Gloucester Crossing Business Express Stage Fort Park Shuttle summer ConstructionParking100 spaces 4 00 fee Bicycle facilities5 spacesAccessibleYesOther informationFare zone7HistoryOpenedDecember 1847RebuiltSeptember 2005 1 Passengers2018296 weekday average boardings 2 ServicesPreceding station MBTA Following stationWest Gloucestertoward North Station Newburyport Rockport Line RockportTerminus Contents 1 History 1 1 Eastern Railroad and B amp M 1 2 MBTA era 2 References 3 External linksHistory editEastern Railroad and B amp M edit nbsp Gloucester station on an early postcardThe Eastern Railroad built their Gloucester Branch in 1847 reaching Gloucester on December 1 3 4 The station was located in downtown Gloucester at the intersection of Railroad and Maplewood Avenues Gloucester was the end of the line until November 4 1861 when the Rockport Railroad extended the branch to Rockport station 4 Due to the new curve heading to Rockport a new station was built to the west near Washington Street The old depot now on a short spur was still used for freight service for several decades to come 5 Initially Rockport trains were operated by the Eastern Railroad and met Eastern mainline trains at Beverly In 1864 trains began to be through routed to Boston to increase frequencies on the inner part of the trunk line 4 The Eastern Railroad bought the Rockport Railroad in 1868 but the branch is still known as the Gloucester Branch By the 1870s regular commuter service was available 3 4 The Eastern was leased by the Boston and Maine Railroad in 1885 and merged into it in 1890 In 1911 the branch was doubled tracked to Gloucester 3 Today the double track ends west of the station Commuter service continued in the same fashion for decades with 13 inbound round trips in 1906 14 trips in 1950 and 11 trips in 1962 4 MBTA era edit nbsp The accessible mini high platform completed in 2005Gloucester has seen nearly continuous service to Boston since 1848 When the newly formed MBTA began funding commuter rail service in 1965 communities outside the funding district were left to pay for trains to continue stopping Gloucester and neighboring Rockport initially declined to subsidize service Service past Manchester was discontinued on January 28 1965 along with the outer sections of the Fitchburg Line and Central Mass Branch 6 The MBTA rushed to reach subsidy agreements with out of district towns and after negotiations service was to resume on June 6 After a lawsuit in which the Eastern Massachusetts Street Railway challenged the right of the MBTA to provide out of district service Rockport service resumed on June 28 1965 6 7 The MBTA bought most B amp M commuter assets including the Gloucester Branch on December 27 1976 6 The station building was gone by that time with a gas station in its place 8 On January 20 1984 the North Station approach trestles were destroyed by a fire Gloucester Branch trains were terminated at a temporary station near Sullivan or bussed from Lynn On November 16 1984 the Beverly Draw bridge connecting Salem to Beverly burned cutting the Rockport Branch and the Ipswich Line from the rest of the system All lines running north and west of Newburyport were abandoned by 1984 leaving no route to move equipment to the rest of the northside A shuttle train was run from Rockport to Beverly Depot until January 7 1985 when it was replaced by bus service 6 The locomotives used were then trucked to Danvers so they could be repaired at the MBTA s main maintenance facility A new bridge opened on December 1 1985 reconnecting Gloucester to the larger system 6 On June 3 2004 the MBTA board approved a renovation of the station including new parking spaces lighting and signage as well as a mini high platform for handicapped accessibility 9 The 3 4 million rebuilt station was opened in September 2005 1 On April 29 2020 service between West Gloucester and Rockport was indefinitely replaced by buses due to a failure of the old bridge 10 That June the MBTA indicated the closure would continue until the completion of the bridge replacement 11 Regular service to Rockport over the bridge resumed on May 23 2022 12 References edit a b Upgrades at Gloucester Commuter Rail Station PDF TRANSreport Boston Metropolitan Planning Organization October 2005 Archived from the original PDF on 16 January 2011 Retrieved 29 December 2012 Central Transportation Planning Staff 2019 2018 Commuter Rail Counts Massachusetts Bay Transportation Authority a b c Karr Ronald Dale 1995 The Rail Lines of Southern New England Branch Line Press pp 264 65 ISBN 0942147022 a b c d e Humphrey Thomas J Clark Norton D 1985 Boston s Commuter Rail The First 150 Years Boston Street Railway Association pp 75 77 ISBN 9780685412947 Gloucester Topographical Atlas of Massachusetts Walker Lithograph amp Publishing Co 1891 via Ward Maps a b c d e Belcher Jonathan Changes to Transit Service in the MBTA district PDF Boston Street Railway Association Humphrey Thomas J Clark Norton D 1986 Boston s Commuter Rail Second Section Boston Street Railway Association p 10 ISBN 9780938315025 Henry Alan P August 10 1977 There s no depot like an old depot Boston Globe p 3 via Newspapers com MBTA Board Approves Improvements for Gloucester and Walpole Stations PDF TRANSreport Boston Metropolitan Planning Organization July 2004 Archived from the original PDF on 16 November 2010 Rockport Line Service Changes Massachusetts Bay Transportation Authority April 29 2020 Archived from the original on May 1 2020 Newburyport Rockport Trains between Rockport and West Gloucester Replaced with Shuttle Buses through Summer 2021 Press release Massachusetts Bay Transportation Authority June 9 2020 MBTA Commuter Rail Spring Summer Schedule to Take Effect May 23 Press release Keolis Commuter Services May 10 2022 External links edit nbsp Media related to Gloucester station MBTA at Wikimedia Commons MBTA Gloucester Retrieved from https en wikipedia org w index php title Gloucester station MBTA amp oldid 1181575887, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.