fbpx
Wikipedia

German cruiser Lützow (1939)

Lützow was a heavy cruiser of Nazi Germany's Kriegsmarine, the fifth and final member of the Admiral Hipper class, but was never completed. The ship was laid down in August 1937 and launched in July 1939, after which the Soviet Union requested to purchase the ship. The Kriegsmarine agreed to the sale in February 1940, and the transfer was completed on 15 April. The vessel was still incomplete when sold to the Soviet Union, with only half of her main battery of eight 20.3 cm (8 in) guns installed and much of the superstructure missing.

Tallinn in Leningrad, c. 1949
History
Nazi Germany
NameLützow
BuilderDeutsche Schiff- und Maschinenbau, Bremen
Laid down2 August 1937
Launched1 July 1939
FateSold to the Soviet Navy, 11 February 1940
Soviet Union
NamePetropavlovsk (from September 1940)
AcquiredTowed to Leningrad, 15 April 1940
Renamed
  • Tallinn (from 1 September 1944)
  • Dniepr (1953)
  • PKZ-112 (1956)
FateBroken up, c. 1953–1961
General characteristics
Class and typeAdmiral Hipper-class cruiser
Displacement
Length210 m (689 ft 0 in) overall
Beam21.80 m (71 ft 6 in)
DraftFull load: 7.90 m (25.9 ft)
Installed power132,000 shp (98,000 kW)
Propulsion
Speed32 knots (59 km/h; 37 mph)
Complement
  • 42 officers
  • 1,340 enlisted
Armament
Armor
  • Belt: 70 to 80 mm (2.8 to 3.1 in)
  • Armor deck: 20 to 50 mm (0.79 to 1.97 in)
  • Turret faces: 105 mm (4.1 in)
Aircraft carried3 aircraft
Aviation facilities1 catapult

Renamed Petropavlovsk in September 1940, work on the ship was delayed by poor German-Soviet co-operation in crew training and provision of technical literature to enable completion of the ship, which was being carried out in the Leningrad shipyards. Still unfinished when Germany invaded the Soviet Union in June 1941, the ship briefly took part in the defense of Leningrad by providing artillery support to the Soviet defenders. She was heavily damaged by German artillery in September 1941, sunk in April 1942, and raised in September 1942. After repairs were effected, the ship was renamed Tallinn and used in the Soviet counter-offensive that relieved Leningrad in 1944. After the end of the war, the ship was used as a stationary training platform and as a floating barracks before being broken up for scrap sometime between 1953 and 1961.

Design edit

 
Recognition drawing of an Admiral Hipper-class cruiser

The Admiral Hipper class of heavy cruisers was ordered in the context of German naval rearmament after the Nazi Party came to power in 1933 and repudiated the disarmament clauses of the Treaty of Versailles. In 1935, Germany signed the Anglo–German Naval Agreement with Great Britain, which provided a legal basis for German naval rearmament; the treaty specified that Germany would be able to build five 10,000-long-ton (10,160 t) "treaty cruisers".[1] The Admiral Hippers were nominally within the 10,000-ton limit, though they significantly exceeded the figure.[2]

Lützow was 210 meters (690 ft) long overall and had a beam of 21.80 m (71.5 ft) and a maximum draft of 7.90 m (25.9 ft). The ship had a design displacement of 17,600 t (17,300 long tons; 19,400 short tons) and a full load displacement of 20,100 t (19,800 long tons; 22,200 short tons). Lützow was powered by three sets of geared steam turbines, which were supplied with steam by twelve ultra-high pressure oil-fired boilers. The ship's top speed was 32 knots (59 km/h; 37 mph), at 132,000 shaft horsepower (98,000 kW).[3] As designed, her standard complement consisted of 42 officers and 1,340 enlisted men.[4]

Lützow's primary armament was eight 20.3 cm (8 in) SK L/60 guns mounted in four twin gun turrets, placed in superfiring pairs forward and aft.[a] Her anti-aircraft battery was to have consisted of twelve 10.5 cm (4.1 in) L/65 guns, twelve 3.7 cm (1.5 in) guns, and eight 2 cm (0.79 in) guns. The ship also would have carried a pair of triple 53.3 cm (21 in) torpedo launchers abreast of the rear superstructure. The ship was to have been equipped with three Arado Ar 196 seaplanes and one catapult.[4] Lützow's armored belt was 70 to 80 mm (2.8 to 3.1 in) thick; her upper deck was 12 to 30 mm (0.47 to 1.18 in) thick while the main armored deck was 20 to 50 mm (0.79 to 1.97 in) thick. The main battery turrets had 105 mm (4.1 in) thick faces and 70 mm thick sides.[3]

Service history edit

 
Photo of Lützow's bow at her launching ceremony

Lützow was ordered by the Kriegsmarine from the Deschimag shipyard in Bremen.[3] Lützow was originally designed as a light cruiser version of the Admiral Hipper-class heavy cruisers, armed with twelve 15 cm (5.9 in) guns instead of the Admiral Hipper's eight 20.3 cm guns. The Kriegsmarine decided, however, to complete the ship identically to Admiral Hipper on 14 November 1936.[4] Her keel was laid on 2 August 1937,[5] under construction number 941.[3] The ship was launched on 1 July 1939, but was not completed.[6]

In October 1939, the Soviet Union approached Germany with a request to purchase the then unfinished Admiral Hipper-class cruisers Lützow, Seydlitz, and Prinz Eugen, along with plans for German capital ships, naval artillery, and other naval technology. The Kriegsmarine denied the request for Seydlitz and Prinz Eugen, but agreed to sell Lützow, as well as 38 cm (15 in) gun turrets and other weaponry.[7] The price for the heavy cruiser was set at 150 million Reichsmarks,[8] nearly double the original cost of the vessel, which was 83,590,000 Reichsmarks.[3] Complete technical specifications, the results of engine trials, and spare parts were included in the sale. Eighty percent of the material was to be provided within twelve months of the transfer, with the remainder to be provided within fifteen months.[9] Lützow was renamed "L", her original contract name, for the transfer to the Soviet Union.[10]

In February 1940, when the agreement was concluded, Lützow was fitting-out in Bremen. Her main battery guns had been transferred to the German army and placed on railway mountings; they had to be dismantled and returned to Bremen. The ship was then towed to Leningrad on 15 April by a private German towing company.[9] The two navies agreed that Germany would be responsible for naval escort, which included destroyers and smaller vessels. Rear Admiral Otto Feige was placed in command of the operation.[11] Feige then led an advisory commission assigned to assist the Soviet effort to complete the ship.[7]

Soviet service edit

At the time the ship arrived in Leningrad, only the two forward gun turrets had been installed and the bridge superstructure was incomplete. The only secondary guns installed were the 3.7 cm anti-aircraft guns.[12] The Soviet Navy renamed the ship Petropavlovsk on 25 September 1940,[13] and designated the construction effort to complete the ship Project 83. The vessel inspired the specifications for a planned heavy cruiser design, designated Project 82, although work was put on hold by the German invasion in 1941, before being restarted in 1943 to a much larger design.[14][15] Training for the Soviet crew of the ship proved to be contentious; the Soviets wanted their personnel trained in Germany, while the Germans preferred sending instructors to the Soviet Union. Language barriers and inexperience with international training missions also hampered the training effort.[16]

Sea trials for Petropavlovsk were scheduled to begin some time in late 1941, and according to the training program, the Soviet crew would not begin training until a month before the trials.[17] It was decided that Soviet officers would train at German naval schools in the fall of 1941, and that five officers would train aboard Seydlitz when the ship was commissioned for trials. German instructors would also be sent to Leningrad to train engine-room personnel. At the time of the commissioning of Petropavlovsk, the relevant German training and technical manuals would be sent to the Soviet Navy, albeit in German only.[18]

By the time Germany invaded the Soviet Union in June 1941, Petropavlovsk was still only 70% complete.[19] She was nevertheless used as a floating battery in the defense of Leningrad in August of that year. Several other ships, including the cruiser Maxim Gorky, joined Petropavlovsk in shelling the advancing Germans.[20] On 7 September, the ship fired on German forces encircling the city; she fired forty salvos from her forward main battery turrets—the only two operational—expending some 700 rounds of ammunition during the attack.[21] On 17 September 1941, the ship was disabled by German heavy artillery;[22] after being hit 53 times, the ship was forced to beach herself to avoid sinking.[23]

On 4 April 1942, aircraft from I Fliegerkorps launched a major attack on the Soviet naval forces in Leningrad: 62 Ju 87s, 33 Ju 88s, and 37 He 111s struck the ships in the harbor. Petropavlovsk was hit once (credited by Hans-Ulrich Rudel), suffering serious damage,[24] and sunk. The Soviet Navy raised the ship on 17 September 1942 and towed her to the Neva where she was repaired.[6] Renamed Tallinn in 1943, the ship returned to service to support the Soviet counter-offensive to relieve the Siege of Leningrad in 1944. An inspection at the end of the war found that most machinery and equipment had been damaged beyond repair. Despite a proposal to complete her using parts of the captured Seydlitz and with Soviet weaponry, the ship was ultimately never completed, and was used as a stationary training ship after the end of the war.[19][22] She was later used as a floating barracks in the Neva, and renamed Dniepr in 1953. The date of her disposal is uncertain; Erich Gröner reports the ship survived until being broken up for scrap in 1960.[6] Przemysław Budzbon initially stated in Conway's All the World's Fighting Ships that the vessel was scrapped in 1958–1959, but later in Warships of the Soviet Fleets that she was scrapped in 1959-1961.[19][22] Tobias Philbin reports that the ship was broken up in 1953.[21]

Footnotes edit

Notes edit

  1. ^ "L/60" denotes the length of the gun in terms of calibers. The length of a 60 caliber gun is 60 times greater than it is wide in diameter.

Citations edit

  1. ^ Williamson, pp. 4–5.
  2. ^ Koop & Schmolke, p. 9.
  3. ^ a b c d e Gröner, p. 65.
  4. ^ a b c Gröner, p. 66.
  5. ^ Williamson, p. 43.
  6. ^ a b c Gröner, p. 67.
  7. ^ a b Rohwer & Monakov, p. 113.
  8. ^ Philbin, p. 46.
  9. ^ a b Philbin, p. 120.
  10. ^ Rohwer & Monakov, p. 140.
  11. ^ Philbin, pp. 120–121.
  12. ^ Philbin, pp. 121–122.
  13. ^ Philbin, p. 122.
  14. ^ McLaughlin, p. 103.
  15. ^ Rohwer & Monakov, pp. 195–196.
  16. ^ Philbin, pp. 122–123.
  17. ^ Philbin, p. 123.
  18. ^ Philbin, p. 125.
  19. ^ a b c Budzbon, Radziemski & Twardowski, p. 82.
  20. ^ Philbin, pp. 127–128.
  21. ^ a b Philbin, p. 128.
  22. ^ a b c Budzbon, p. 328.
  23. ^ Sieche, p. 229.
  24. ^ Ward, p. 143.

References edit

  • Budzbon, Przemysław (1992). "Soviet Union". In Gardiner, Robert; Chesneau, Roger (eds.). Conway's All the World's Fighting Ships 1922–1946. London: Conway Maritime Press. pp. 318–346. ISBN 978-0-85177-146-5.
  • Budzbon, Przemysław; Radziemski, Jan & Twardowski, Marek (2022). Warships of the Soviet Fleets 1939–1945. Vol. I: Major Combatants. Annapolis, Maryland: Naval Institute Press. ISBN 978-1-68247-877-6.
  • Gröner, Erich (1990). German Warships: 1815–1945. Vol. I: Major Surface Vessels. Annapolis: Naval Institute Press. ISBN 978-0-87021-790-6.
  • Koop, Gerhard & Schmolke, Klaus-Peter (1992). Die Schweren Kreuzer der Admiral Hipper-Klasse [The Heavy Cruisers of the Admiral Hipper Class] (in German). Bonn: Bernard & Graefe Verlag. ISBN 978-3-7637-5896-8.
  • McLaughlin, Stephen (2006). "Project 82: The Stalingrad Class". In Jordan, John (ed.). Warship 2006. London: Conway. pp. 102–123. ISBN 978-1-84486-030-2.
  • Philbin, Tobias R. (1994). The Lure of Neptune: German-Soviet Naval Collaboration and Ambitions, 1919–1941. Columbia: University of South Carolina Press. ISBN 978-0-87249-992-8.
  • Rohwer, Jürgen & Monakov, Mikhail S. (2001). Stalin's Ocean-Going Fleet: Soviet Naval Strategy and Shipbuilding Programmes, 1935–1953. London: Frank Cass. ISBN 978-0-7146-4895-8.
  • Sieche, Erwin (1992). "Germany". In Gardiner, Robert; Chesneau, Roger (eds.). Conway's All the World's Fighting Ships 1922–1946. London: Conway Maritime Press. pp. 218–254. ISBN 978-0-85177-146-5.
  • Ward, John (2004). Hitler's Stuka Squadrons. St. Paul: MBI. ISBN 978-0-7603-1991-8.
  • Williamson, Gordon (2003). German Heavy Cruisers 1939–1945. Oxford: Osprey Publishing. ISBN 978-1-84176-502-0.

Further reading edit

  • Hill, Alexander (2024). Soviet Cruisers 1917-1945: From the October Revolution to World War II. New Vanguard. Vol. 326. Oxford, UK: Osprey Publishing. ISBN 9781472859334.
  • Whitley, M. J. (1987). German Cruisers of World War Two. Annapolis: Naval Institute Press. ISBN 978-0-87021-217-8.

german, cruiser, lützow, 1939, other, ships, with, same, name, german, cruiser, lützow, russian, ship, petropavlovsk, lützow, heavy, cruiser, nazi, germany, kriegsmarine, fifth, final, member, admiral, hipper, class, never, completed, ship, laid, down, august,. For other ships with the same name see German cruiser Lutzow and Russian ship Petropavlovsk Lutzow was a heavy cruiser of Nazi Germany s Kriegsmarine the fifth and final member of the Admiral Hipper class but was never completed The ship was laid down in August 1937 and launched in July 1939 after which the Soviet Union requested to purchase the ship The Kriegsmarine agreed to the sale in February 1940 and the transfer was completed on 15 April The vessel was still incomplete when sold to the Soviet Union with only half of her main battery of eight 20 3 cm 8 in guns installed and much of the superstructure missing Tallinn in Leningrad c 1949History Nazi Germany NameLutzow BuilderDeutsche Schiff und Maschinenbau Bremen Laid down2 August 1937 Launched1 July 1939 FateSold to the Soviet Navy 11 February 1940 Soviet Union NamePetropavlovsk from September 1940 AcquiredTowed to Leningrad 15 April 1940 RenamedTallinn from 1 September 1944 Dniepr 1953 PKZ 112 1956 FateBroken up c 1953 1961 General characteristics Class and typeAdmiral Hipper class cruiser DisplacementNormal 17 600 t 17 300 long tons Full load 20 100 t 19 800 long tons Length210 m 689 ft 0 in overall Beam21 80 m 71 ft 6 in DraftFull load 7 90 m 25 9 ft Installed power132 000 shp 98 000 kW Propulsion3 Blohm amp Voss steam turbines 3 propellers Speed32 knots 59 km h 37 mph Complement42 officers 1 340 enlisted Armament8 20 3 cm 8 in guns 12 10 5 cm 4 1 in SK C 33 guns 12 3 7 cm 1 5 in SK C 30 guns 8 2 cm 0 79 in C 30 guns 12 53 3 cm 21 in torpedo tubes ArmorBelt 70 to 80 mm 2 8 to 3 1 in Armor deck 20 to 50 mm 0 79 to 1 97 in Turret faces 105 mm 4 1 in Aircraft carried3 aircraft Aviation facilities1 catapult Renamed Petropavlovsk in September 1940 work on the ship was delayed by poor German Soviet co operation in crew training and provision of technical literature to enable completion of the ship which was being carried out in the Leningrad shipyards Still unfinished when Germany invaded the Soviet Union in June 1941 the ship briefly took part in the defense of Leningrad by providing artillery support to the Soviet defenders She was heavily damaged by German artillery in September 1941 sunk in April 1942 and raised in September 1942 After repairs were effected the ship was renamed Tallinn and used in the Soviet counter offensive that relieved Leningrad in 1944 After the end of the war the ship was used as a stationary training platform and as a floating barracks before being broken up for scrap sometime between 1953 and 1961 Contents 1 Design 2 Service history 2 1 Soviet service 3 Footnotes 3 1 Notes 3 2 Citations 4 References 5 Further readingDesign editMain article Admiral Hipper class cruiser nbsp Recognition drawing of an Admiral Hipper class cruiser The Admiral Hipper class of heavy cruisers was ordered in the context of German naval rearmament after the Nazi Party came to power in 1933 and repudiated the disarmament clauses of the Treaty of Versailles In 1935 Germany signed the Anglo German Naval Agreement with Great Britain which provided a legal basis for German naval rearmament the treaty specified that Germany would be able to build five 10 000 long ton 10 160 t treaty cruisers 1 The Admiral Hipper s were nominally within the 10 000 ton limit though they significantly exceeded the figure 2 Lutzow was 210 meters 690 ft long overall and had a beam of 21 80 m 71 5 ft and a maximum draft of 7 90 m 25 9 ft The ship had a design displacement of 17 600 t 17 300 long tons 19 400 short tons and a full load displacement of 20 100 t 19 800 long tons 22 200 short tons Lutzow was powered by three sets of geared steam turbines which were supplied with steam by twelve ultra high pressure oil fired boilers The ship s top speed was 32 knots 59 km h 37 mph at 132 000 shaft horsepower 98 000 kW 3 As designed her standard complement consisted of 42 officers and 1 340 enlisted men 4 Lutzow s primary armament was eight 20 3 cm 8 in SK L 60 guns mounted in four twin gun turrets placed in superfiring pairs forward and aft a Her anti aircraft battery was to have consisted of twelve 10 5 cm 4 1 in L 65 guns twelve 3 7 cm 1 5 in guns and eight 2 cm 0 79 in guns The ship also would have carried a pair of triple 53 3 cm 21 in torpedo launchers abreast of the rear superstructure The ship was to have been equipped with three Arado Ar 196 seaplanes and one catapult 4 Lutzow s armored belt was 70 to 80 mm 2 8 to 3 1 in thick her upper deck was 12 to 30 mm 0 47 to 1 18 in thick while the main armored deck was 20 to 50 mm 0 79 to 1 97 in thick The main battery turrets had 105 mm 4 1 in thick faces and 70 mm thick sides 3 Service history edit nbsp Photo of Lutzow s bow at her launching ceremony Lutzow was ordered by the Kriegsmarine from the Deschimag shipyard in Bremen 3 Lutzow was originally designed as a light cruiser version of the Admiral Hipper class heavy cruisers armed with twelve 15 cm 5 9 in guns instead of the Admiral Hipper s eight 20 3 cm guns The Kriegsmarine decided however to complete the ship identically to Admiral Hipper on 14 November 1936 4 Her keel was laid on 2 August 1937 5 under construction number 941 3 The ship was launched on 1 July 1939 but was not completed 6 In October 1939 the Soviet Union approached Germany with a request to purchase the then unfinished Admiral Hipper class cruisers Lutzow Seydlitz and Prinz Eugen along with plans for German capital ships naval artillery and other naval technology The Kriegsmarine denied the request for Seydlitz and Prinz Eugen but agreed to sell Lutzow as well as 38 cm 15 in gun turrets and other weaponry 7 The price for the heavy cruiser was set at 150 million Reichsmarks 8 nearly double the original cost of the vessel which was 83 590 000 Reichsmarks 3 Complete technical specifications the results of engine trials and spare parts were included in the sale Eighty percent of the material was to be provided within twelve months of the transfer with the remainder to be provided within fifteen months 9 Lutzow was renamed L her original contract name for the transfer to the Soviet Union 10 In February 1940 when the agreement was concluded Lutzow was fitting out in Bremen Her main battery guns had been transferred to the German army and placed on railway mountings they had to be dismantled and returned to Bremen The ship was then towed to Leningrad on 15 April by a private German towing company 9 The two navies agreed that Germany would be responsible for naval escort which included destroyers and smaller vessels Rear Admiral Otto Feige was placed in command of the operation 11 Feige then led an advisory commission assigned to assist the Soviet effort to complete the ship 7 Soviet service edit At the time the ship arrived in Leningrad only the two forward gun turrets had been installed and the bridge superstructure was incomplete The only secondary guns installed were the 3 7 cm anti aircraft guns 12 The Soviet Navy renamed the ship Petropavlovsk on 25 September 1940 13 and designated the construction effort to complete the ship Project 83 The vessel inspired the specifications for a planned heavy cruiser design designated Project 82 although work was put on hold by the German invasion in 1941 before being restarted in 1943 to a much larger design 14 15 Training for the Soviet crew of the ship proved to be contentious the Soviets wanted their personnel trained in Germany while the Germans preferred sending instructors to the Soviet Union Language barriers and inexperience with international training missions also hampered the training effort 16 Sea trials for Petropavlovsk were scheduled to begin some time in late 1941 and according to the training program the Soviet crew would not begin training until a month before the trials 17 It was decided that Soviet officers would train at German naval schools in the fall of 1941 and that five officers would train aboard Seydlitz when the ship was commissioned for trials German instructors would also be sent to Leningrad to train engine room personnel At the time of the commissioning of Petropavlovsk the relevant German training and technical manuals would be sent to the Soviet Navy albeit in German only 18 By the time Germany invaded the Soviet Union in June 1941 Petropavlovsk was still only 70 complete 19 She was nevertheless used as a floating battery in the defense of Leningrad in August of that year Several other ships including the cruiser Maxim Gorky joined Petropavlovsk in shelling the advancing Germans 20 On 7 September the ship fired on German forces encircling the city she fired forty salvos from her forward main battery turrets the only two operational expending some 700 rounds of ammunition during the attack 21 On 17 September 1941 the ship was disabled by German heavy artillery 22 after being hit 53 times the ship was forced to beach herself to avoid sinking 23 On 4 April 1942 aircraft from I Fliegerkorps launched a major attack on the Soviet naval forces in Leningrad 62 Ju 87s 33 Ju 88s and 37 He 111s struck the ships in the harbor Petropavlovsk was hit once credited by Hans Ulrich Rudel suffering serious damage 24 and sunk The Soviet Navy raised the ship on 17 September 1942 and towed her to the Neva where she was repaired 6 Renamed Tallinn in 1943 the ship returned to service to support the Soviet counter offensive to relieve the Siege of Leningrad in 1944 An inspection at the end of the war found that most machinery and equipment had been damaged beyond repair Despite a proposal to complete her using parts of the captured Seydlitz and with Soviet weaponry the ship was ultimately never completed and was used as a stationary training ship after the end of the war 19 22 She was later used as a floating barracks in the Neva and renamed Dniepr in 1953 The date of her disposal is uncertain Erich Groner reports the ship survived until being broken up for scrap in 1960 6 Przemyslaw Budzbon initially stated in Conway s All the World s Fighting Ships that the vessel was scrapped in 1958 1959 but later in Warships of the Soviet Fleets that she was scrapped in 1959 1961 19 22 Tobias Philbin reports that the ship was broken up in 1953 21 Footnotes editNotes edit L 60 denotes the length of the gun in terms of calibers The length of a 60 caliber gun is 60 times greater than it is wide in diameter Citations edit Williamson pp 4 5 Koop amp Schmolke p 9 a b c d e Groner p 65 a b c Groner p 66 Williamson p 43 a b c Groner p 67 a b Rohwer amp Monakov p 113 Philbin p 46 a b Philbin p 120 Rohwer amp Monakov p 140 Philbin pp 120 121 Philbin pp 121 122 Philbin p 122 McLaughlin p 103 Rohwer amp Monakov pp 195 196 Philbin pp 122 123 Philbin p 123 Philbin p 125 a b c Budzbon Radziemski amp Twardowski p 82 Philbin pp 127 128 a b Philbin p 128 a b c Budzbon p 328 Sieche p 229 Ward p 143 References editBudzbon Przemyslaw 1992 Soviet Union In Gardiner Robert Chesneau Roger eds Conway s All the World s Fighting Ships 1922 1946 London Conway Maritime Press pp 318 346 ISBN 978 0 85177 146 5 Budzbon Przemyslaw Radziemski Jan amp Twardowski Marek 2022 Warships of the Soviet Fleets 1939 1945 Vol I Major Combatants Annapolis Maryland Naval Institute Press ISBN 978 1 68247 877 6 Groner Erich 1990 German Warships 1815 1945 Vol I Major Surface Vessels Annapolis Naval Institute Press ISBN 978 0 87021 790 6 Koop Gerhard amp Schmolke Klaus Peter 1992 Die Schweren Kreuzer der Admiral Hipper Klasse The Heavy Cruisers of the Admiral Hipper Class in German Bonn Bernard amp Graefe Verlag ISBN 978 3 7637 5896 8 McLaughlin Stephen 2006 Project 82 The Stalingrad Class In Jordan John ed Warship 2006 London Conway pp 102 123 ISBN 978 1 84486 030 2 Philbin Tobias R 1994 The Lure of Neptune German Soviet Naval Collaboration and Ambitions 1919 1941 Columbia University of South Carolina Press ISBN 978 0 87249 992 8 Rohwer Jurgen amp Monakov Mikhail S 2001 Stalin s Ocean Going Fleet Soviet Naval Strategy and Shipbuilding Programmes 1935 1953 London Frank Cass ISBN 978 0 7146 4895 8 Sieche Erwin 1992 Germany In Gardiner Robert Chesneau Roger eds Conway s All the World s Fighting Ships 1922 1946 London Conway Maritime Press pp 218 254 ISBN 978 0 85177 146 5 Ward John 2004 Hitler s Stuka Squadrons St Paul MBI ISBN 978 0 7603 1991 8 Williamson Gordon 2003 German Heavy Cruisers 1939 1945 Oxford Osprey Publishing ISBN 978 1 84176 502 0 Further reading editHill Alexander 2024 Soviet Cruisers 1917 1945 From the October Revolution to World War II New Vanguard Vol 326 Oxford UK Osprey Publishing ISBN 9781472859334 Whitley M J 1987 German Cruisers of World War Two Annapolis Naval Institute Press ISBN 978 0 87021 217 8 Retrieved from https en wikipedia org w index php title German cruiser Lutzow 1939 amp oldid 1211411290, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.