Gateway Program (Vancouver)

The Gateway Program is a C$3.0 billion [1] regional transportation project for Metro Vancouver and surrounding areas that is being managed by the British Columbia Ministry of Transportation. The ministry introduced the Gateway Program on January 31, 2006, as a means to address growing congestion and reduce travel times.[1] The bulk of the construction took place from 2006 to 2014 and saw the completion of the Golden Ears Bridge, the Pitt River Bridge, the Port Mann Bridge, improvements on the Sea-to-Sky highway, and finally the construction of the South Fraser Perimeter Road. The Greater Gateway Program is expected to finish by 2030.

A map of the Gateway Program's projects.

Fraser Highway edit

The route will be widened to four lanes through the Green Timbers Urban Forest Park. The widening is also to accommodate the Surrey-Langley Skytrain project.

Highway 1 (Port Mann Bridge) edit

The Port Mann / Highway 1 (PMH1) Project includes the widening of Highway 1, a new Port Mann Bridge, and upgrades to interchanges on British Columbia Highway 1 in order to address congestion through this corridor.

When the bridge was built, there was also massive remodeling of the Cape Horn interchange.

The Port Mann Bridge was replaced with a new 10-lane tolled bridge. On September 1, 2017, the toll was removed.

The project will also feature rapid bus lanes. This will include transit priority access to Highway 1, park-and-ride facilities, new transit loops in Surrey and Langley, and 20 new buses.[2]

The bridge will include separated pedestrian and cycling lanes and is also designed to accommodate the eventual addition of light rail transit underneath the bridge.

The project includes widening Highway 1 between McGill Street in Vancouver and 216 Street in Langley. The pre-design concept included one additional lane in each direction between the Port Mann Bridge and McGill Street. The bridge itself features five new lanes, two reserved for high-occupancy vehicles and commercial vehicles. On the Surrey side, four additional lanes will be built from the bridge to 200 Street, allowing for an HOV and general lane in each direction. Finally, there will be one additional lane in each direction on the section from 200 to 216 Streets.[3]

There was a plan in the early 2010s to build a new road to extend United Boulevard westward from Coquitlam, over the railway tracks to meet Brunette Avenue just south of the Braid / Brunette intersection to improve traffic flow. Local opposition to this idea had the plan shut down.

Interchanges from Vancouver to Langley will also be upgraded to increase interchange capacity and improve safety.[1]

The majority of these changes will occur within the existing right of way of Highway 1. The PMH1 project was completed in September 2015.[1][4][5]

In 2017 there were some plans for a Brunette Avenue interchange, which would be close to the Cape Horn Interchange, a few km west. Since 2017 the idea has fallen apart and mostly has been abandoned. There are currently no talks to create a Brunette Avenue interchange over the Trans Canada in Coquitlam.

Golden Ears Way (Golden Ears Bridge) edit

Golden Ears Way was created simultaneously with the bridge from 2006 to 2009. There previously was no bridge, and the only land link to Pitt Meadows was the old Pitt River Bridge in the Northwest side of the city. The new bridge allows for quick access to the south of the city from Langley.

South Fraser Perimeter Road edit

The South Fraser Perimeter Road (SFPR), a four-lane, 80 km/h (50 mph) highway along the south side of the Fraser River, extends from Highway 17 in southwest Delta to 176 Street in Surrey, with connections to Highways 1, 91, and 99 and to TransLink's new Golden Ears Bridge connector. The SFPR provides a new east–west transportation corridor that connects to the Roberts Bank Superport. The stated goal is to reduce the volume of regional truck traffic on local roads and reduce idling on local roads.

The Burns Bog Conservation Society has expressed concerns that the South Fraser Perimeter Road will endanger Burns Bog.[6] Attempts to mitigate these impacts have been made through refinements that occurred as a result of public consultation and the Environmental Assessment process. In response to the mitigation measures proposed, the Environmental Stewardship Branch of Environment Canada wrote that "the changes are not sufficient to alleviate its concerns related to the impacts of the Project on Pacific Water Shrew (PWS), hydrology, aerial deposition, and ecological integrity of Burns Bog".[7]

The Gateway Program says that it is committed to protecting and supporting the restoration of Burns Bog. The SFPR project will be working with the Burns Bog Scientific Advisory Panel to develop systems that will improve the existing drainage and hydrology of the bog. Although the SFPR alignment does not pass through the Burns Bog Ecological Conservancy Area,[8] there is concern that it will affect the surrounding hydrology and have an adverse effect on the Conservancy Area.[9]

It is estimated that over 90 hectares (222 acres) of farmland will also be lost to the project.[10] Concerns have also been expressed about pollution near residential neighborhoods and schools.[11]

The Wilderness Committee and other groups have criticized the SFPR, and the Gateway Program in general, for increasing greenhouse gas emissions.[12] In the spring of 2011, a protest camp organized by StopThePave.org and the Council of Canadians occupied a SFPR construction site for almost two weeks.[13]

The SFPR was completed and opened to traffic on December 21, 2013[14] and cost C$1.26 billion.[15]

North Fraser Perimeter Road (Pattullo Bridge) edit

The North Fraser Perimeter Road (NFPR) was promoted as a way to provide a continuous route on the north side of the Fraser River from New Westminster to Maple Ridge. TransLink is responsible for the section between the Queensborough Bridge and the border of Coquitlam. In 2009, the Queensborough Bridge had its approach around Marine Way / Stewardson Way modified.

The Gateway portion of this route was to originate from the Bailey bridge across the Brunette River. The one-lane wooden bridge was to be replaced with a new four-lane crossing. The route follows United Boulevard and turns onto the Mary Hill Bypass. East of the new bridge, Lougheed Highway continues east through Pitt Meadows and Maple Ridge. The intersection at Harris Road will be converted to a full interchange.

While there were initially some plans for the North Fraser route to be built to expressway standards, local opposition from New Westminster caused those plans to be rescinded. The plan was for a fast route from the Queensborough bridge along the water through New Westminster and finally into Coquitlam by the Trans Canada Highway. After this surface route plan was rejected, a new plan suggested tunnel connections through New Westminster.

This was called the Stormont-McBride Connector, it was planned to go Highway 1’s Gaglardi Way interchange and the northern foot of McBride Boulevard at 10th Avenue. The plan was to have a high speed connection from the north end of the Pattullo Bridge to Highway 1 going through New Westminster, with much of the route as an underground tunnel. This plan was rejected as well, in 2020 by Burnaby city council out of concerns that it would cause induced demand in the region.

Instead, the scope of the North Fraser arterial project was reduced massively, and focused mainly on intersection improvements along New Westminster because of objections for environmental and traffic reasons. New Westminster is hoping to become a more pedestrian oriented city in the future. The new Pattullo Bridge is currently being built as a replacement and may open in 2025.

Lougheed Highway (Pitt River Bridge) edit

The new Pitt River Bridge is a seven-lane cable-stayed bridge that carries the Lougheed Highway over the Pitt River; it was built between the two swing bridges that previously performed this duty. A new interchange has replaced the at-grade intersection of the Lougheed Highway and the Mary Hill Bypass.

The old swing bridges previously accommodated four lanes of traffic, two on each bridge, with a counterflow system for peak hours. The new bridge carries three lanes of general-purpose traffic in each direction, as well as one eastbound lane for slower-moving trucks accessing the Canadian Pacific intermodal yard at Kennedy Road.

The new bridge also includes separate pedestrian and cycling walkways. The new bridge is designed to accommodate the addition of light rapid transit.

The project is being funded by the federal and provincial governments. As part of its recent Asia–Pacific Gateway and Corridor Initiative, the Government of Canada committed $90 million to the construction of the new bridge and interchange; the province provided $108 million.

The new bridge and interchange were substantially completed by the end of 2009 to coincide with the opening of the Golden Ears Bridge.[1]

The government is considering creating a modernized intersection between Lougheed Highway and Harris road. Talks are undergoing for public opinion to be considered. These plans were released in 2023, and comes after previous plans for an interchange and a potential North Lougheed connector were rejected by Pitt Meadows in 2014 due to high costs.

There is also widening planned, the province will widen from 266th Street to 287th Street in Maple Ridge from an undivided two-lane highway to four lanes.

Sea to Sky Highway edit

In 2009, the government modernized intersections such as the Horseshoe Bay Interchange to prepare for the 2010 Olympics.

Criticism edit

 
David Suzuki speaks at the Global Day of Action on Climate Change in Vancouver.

Burnaby city council, Vancouver city council, and directors of the GVRD (now Metro Vancouver) have passed resolutions opposing the Highway 1 portion of the project.[16][17]

Groups opposing the program include the Livable Region Coalition, a group based south of the Fraser called the Gateway 40 Network, a group of urban planners,[18] the Society Promoting Environmental Conservation (SPEC), the Burns Bog Conservation Society, Sunbury Neighbourhood Association, South Fraser Action Networks, Bridgeview Community Action Group, Gateway Sucks, the Council of Canadians, and the Western Canada Wilderness Committee. These groups argue that increasing the highway's capacity will only increase traffic over the span and encourage suburban sprawl. The Livable Region Coalition urged the former Minister of Transportation, Kevin Falcon, to consider more viable solutions to reducing congestion, including more rapid transit and improved bus routes.[19]

The David Suzuki Foundation claims the project violates the goals of the Livable Region Strategic Plan and does not consider alternative forms of transportation.[20]

The provincial government studies, conducted as part of the environmental assessment process, project an increase of 176,000 tonnes per year in greenhouse gas emissions.[21] An analysis by SPEC found that these studies included emissions in Whatcom County, Washington, when calculating the baseline and left them out when calculating the impact of Gateway. When this is factored in, the studies predict a 31% increase in road emissions.[22]

Groups supporting the project include Get Moving BC and the BC Truckers Association.[citation needed]

See also edit

References edit

  1. ^ a b c d e (PDF). Ministry of Transportation of British Columbia. January 31, 2006. Archived from the original (PDF) on April 11, 2008. Retrieved 2007-02-11.
  2. ^ http://www.translink.bc.ca/files/buzzer/2007/Buzzer__Oct19.pdf[bare URL PDF]
  3. ^ (PDF). Government of British Columbia. December 8, 2006. Archived from the original (PDF) on June 11, 2011. Retrieved May 5, 2008.
  4. ^ "Construction of Port Mann Bridge officially over | CBC News".
  5. ^ https://canada.constructconnect.com/joc/news/infrastructure/2015/09/port-mann-bridge-project-wraps-up-1010286w
  6. ^ . Burns Bog Conservation Society. Archived from the original on 2008-07-25.
  7. ^ (PDF). Archived from the original (PDF) on 2013-12-17. Retrieved 2013-12-23.{{cite web}}: CS1 maint: archived copy as title (link)
  8. ^ (PDF). Archived from the original (PDF) on June 11, 2011. Retrieved May 12, 2008.
  9. ^ Burns Bog Conservation Society » Resources » Sustainable Development Strategy 2008-07-25 at the Wayback Machine
  10. ^ "Fraser Valley Conservation Coalition Submission to Environmental Assessment Office". Sunbury Neighbourhood Association.
  11. ^ South Fraser Perimeter Road. Sunburyneighbourhood.ca. Retrieved on 2014-04-12.
  12. ^ Wilderness Committee. . Archived from the original on 29 September 2011. Retrieved 1 September 2011.
  13. ^ Dawn, Paley (May 5, 2011). "Camp Closed, But Resistance Continues". Vancouver Media Co-op. Retrieved 1 September 2011.
  14. ^ . Province of British Columbia. Archived from the original on December 23, 2013. Retrieved December 22, 2013.
  15. ^ "South Fraser Perimeter Road completed, officially opens today". Canada Newswire. December 21, 2013. Retrieved December 22, 2013.
  16. ^ (PDF). City of Burnaby. Archived from the original (PDF) on September 28, 2007. Retrieved 2007-02-11.
  17. ^ "Standing Committee Minutes" (PDF). City of Vancouver. Retrieved 2007-02-11.
  18. ^ Ward, Doug (June 20, 2006). . The Vancouver Sun. Archived from the original on April 16, 2008. Retrieved 2007-02-11.
  19. ^ (PDF). The Livable Region Coalition. October 2004. Archived from the original (PDF) on 2007-06-28. Retrieved 2007-02-11.
  20. ^ (PDF). David Suzuki Foundation. Archived from the original (PDF) on 2007-01-18. Retrieved 2007-02-11.
  21. ^ "EPIC" (PDF).
  22. ^ (PDF). Archived from the original (PDF) on 2008-05-13. Retrieved 2008-05-12.

External links edit

  • Official Gateway Program website Ministry of Transportation
  • The Livable Region Coalition
  • Road to Ruin: Resisting the Gateway Freeway Expansion - a documentary about community resistance to the Gateway Program

gateway, program, vancouver, this, article, about, highway, project, metro, vancouver, canada, northeast, corridor, rail, project, united, states, gateway, project, this, article, uses, bare, urls, which, uninformative, vulnerable, link, please, consider, conv. This article is about the highway project in Metro Vancouver Canada For the Northeast Corridor rail project in the United States see Gateway Project This article uses bare URLs which are uninformative and vulnerable to link rot Please consider converting them to full citations to ensure the article remains verifiable and maintains a consistent citation style Several templates and tools are available to assist in formatting such as reFill documentation and Citation bot documentation September 2022 Learn how and when to remove this template message The Gateway Program is a C 3 0 billion 1 regional transportation project for Metro Vancouver and surrounding areas that is being managed by the British Columbia Ministry of Transportation The ministry introduced the Gateway Program on January 31 2006 as a means to address growing congestion and reduce travel times 1 The bulk of the construction took place from 2006 to 2014 and saw the completion of the Golden Ears Bridge the Pitt River Bridge the Port Mann Bridge improvements on the Sea to Sky highway and finally the construction of the South Fraser Perimeter Road The Greater Gateway Program is expected to finish by 2030 A map of the Gateway Program s projects Contents 1 Fraser Highway 2 Highway 1 Port Mann Bridge 3 Golden Ears Way Golden Ears Bridge 4 South Fraser Perimeter Road 5 North Fraser Perimeter Road Pattullo Bridge 6 Lougheed Highway Pitt River Bridge 7 Sea to Sky Highway 8 Criticism 9 See also 10 References 11 External linksFraser Highway editThe route will be widened to four lanes through the Green Timbers Urban Forest Park The widening is also to accommodate the Surrey Langley Skytrain project Highway 1 Port Mann Bridge editThe Port Mann Highway 1 PMH1 Project includes the widening of Highway 1 a new Port Mann Bridge and upgrades to interchanges on British Columbia Highway 1 in order to address congestion through this corridor When the bridge was built there was also massive remodeling of the Cape Horn interchange The Port Mann Bridge was replaced with a new 10 lane tolled bridge On September 1 2017 the toll was removed The project will also feature rapid bus lanes This will include transit priority access to Highway 1 park and ride facilities new transit loops in Surrey and Langley and 20 new buses 2 The bridge will include separated pedestrian and cycling lanes and is also designed to accommodate the eventual addition of light rail transit underneath the bridge The project includes widening Highway 1 between McGill Street in Vancouver and 216 Street in Langley The pre design concept included one additional lane in each direction between the Port Mann Bridge and McGill Street The bridge itself features five new lanes two reserved for high occupancy vehicles and commercial vehicles On the Surrey side four additional lanes will be built from the bridge to 200 Street allowing for an HOV and general lane in each direction Finally there will be one additional lane in each direction on the section from 200 to 216 Streets 3 There was a plan in the early 2010s to build a new road to extend United Boulevard westward from Coquitlam over the railway tracks to meet Brunette Avenue just south of the Braid Brunette intersection to improve traffic flow Local opposition to this idea had the plan shut down Interchanges from Vancouver to Langley will also be upgraded to increase interchange capacity and improve safety 1 The majority of these changes will occur within the existing right of way of Highway 1 The PMH1 project was completed in September 2015 1 4 5 In 2017 there were some plans for a Brunette Avenue interchange which would be close to the Cape Horn Interchange a few km west Since 2017 the idea has fallen apart and mostly has been abandoned There are currently no talks to create a Brunette Avenue interchange over the Trans Canada in Coquitlam Golden Ears Way Golden Ears Bridge editFurther information Golden Ears Way Golden Ears Way was created simultaneously with the bridge from 2006 to 2009 There previously was no bridge and the only land link to Pitt Meadows was the old Pitt River Bridge in the Northwest side of the city The new bridge allows for quick access to the south of the city from Langley South Fraser Perimeter Road editThe South Fraser Perimeter Road SFPR a four lane 80 km h 50 mph highway along the south side of the Fraser River extends from Highway 17 in southwest Delta to 176 Street in Surrey with connections to Highways 1 91 and 99 and to TransLink s new Golden Ears Bridge connector The SFPR provides a new east west transportation corridor that connects to the Roberts Bank Superport The stated goal is to reduce the volume of regional truck traffic on local roads and reduce idling on local roads The Burns Bog Conservation Society has expressed concerns that the South Fraser Perimeter Road will endanger Burns Bog 6 Attempts to mitigate these impacts have been made through refinements that occurred as a result of public consultation and the Environmental Assessment process In response to the mitigation measures proposed the Environmental Stewardship Branch of Environment Canada wrote that the changes are not sufficient to alleviate its concerns related to the impacts of the Project on Pacific Water Shrew PWS hydrology aerial deposition and ecological integrity of Burns Bog 7 The Gateway Program says that it is committed to protecting and supporting the restoration of Burns Bog The SFPR project will be working with the Burns Bog Scientific Advisory Panel to develop systems that will improve the existing drainage and hydrology of the bog Although the SFPR alignment does not pass through the Burns Bog Ecological Conservancy Area 8 there is concern that it will affect the surrounding hydrology and have an adverse effect on the Conservancy Area 9 It is estimated that over 90 hectares 222 acres of farmland will also be lost to the project 10 Concerns have also been expressed about pollution near residential neighborhoods and schools 11 The Wilderness Committee and other groups have criticized the SFPR and the Gateway Program in general for increasing greenhouse gas emissions 12 In the spring of 2011 a protest camp organized by StopThePave org and the Council of Canadians occupied a SFPR construction site for almost two weeks 13 The SFPR was completed and opened to traffic on December 21 2013 14 and cost C 1 26 billion 15 North Fraser Perimeter Road Pattullo Bridge editThe North Fraser Perimeter Road NFPR was promoted as a way to provide a continuous route on the north side of the Fraser River from New Westminster to Maple Ridge TransLink is responsible for the section between the Queensborough Bridge and the border of Coquitlam In 2009 the Queensborough Bridge had its approach around Marine Way Stewardson Way modified The Gateway portion of this route was to originate from the Bailey bridge across the Brunette River The one lane wooden bridge was to be replaced with a new four lane crossing The route follows United Boulevard and turns onto the Mary Hill Bypass East of the new bridge Lougheed Highway continues east through Pitt Meadows and Maple Ridge The intersection at Harris Road will be converted to a full interchange While there were initially some plans for the North Fraser route to be built to expressway standards local opposition from New Westminster caused those plans to be rescinded The plan was for a fast route from the Queensborough bridge along the water through New Westminster and finally into Coquitlam by the Trans Canada Highway After this surface route plan was rejected a new plan suggested tunnel connections through New Westminster This was called the Stormont McBride Connector it was planned to go Highway 1 s Gaglardi Way interchange and the northern foot of McBride Boulevard at 10th Avenue The plan was to have a high speed connection from the north end of the Pattullo Bridge to Highway 1 going through New Westminster with much of the route as an underground tunnel This plan was rejected as well in 2020 by Burnaby city council out of concerns that it would cause induced demand in the region Instead the scope of the North Fraser arterial project was reduced massively and focused mainly on intersection improvements along New Westminster because of objections for environmental and traffic reasons New Westminster is hoping to become a more pedestrian oriented city in the future The new Pattullo Bridge is currently being built as a replacement and may open in 2025 Lougheed Highway Pitt River Bridge editThe new Pitt River Bridge is a seven lane cable stayed bridge that carries the Lougheed Highway over the Pitt River it was built between the two swing bridges that previously performed this duty A new interchange has replaced the at grade intersection of the Lougheed Highway and the Mary Hill Bypass The old swing bridges previously accommodated four lanes of traffic two on each bridge with a counterflow system for peak hours The new bridge carries three lanes of general purpose traffic in each direction as well as one eastbound lane for slower moving trucks accessing the Canadian Pacific intermodal yard at Kennedy Road The new bridge also includes separate pedestrian and cycling walkways The new bridge is designed to accommodate the addition of light rapid transit The project is being funded by the federal and provincial governments As part of its recent Asia Pacific Gateway and Corridor Initiative the Government of Canada committed 90 million to the construction of the new bridge and interchange the province provided 108 million The new bridge and interchange were substantially completed by the end of 2009 to coincide with the opening of the Golden Ears Bridge 1 The government is considering creating a modernized intersection between Lougheed Highway and Harris road Talks are undergoing for public opinion to be considered These plans were released in 2023 and comes after previous plans for an interchange and a potential North Lougheed connector were rejected by Pitt Meadows in 2014 due to high costs There is also widening planned the province will widen from 266th Street to 287th Street in Maple Ridge from an undivided two lane highway to four lanes Sea to Sky Highway editIn 2009 the government modernized intersections such as the Horseshoe Bay Interchange to prepare for the 2010 Olympics Criticism edit nbsp David Suzuki speaks at the Global Day of Action on Climate Change in Vancouver Burnaby city council Vancouver city council and directors of the GVRD now Metro Vancouver have passed resolutions opposing the Highway 1 portion of the project 16 17 Groups opposing the program include the Livable Region Coalition a group based south of the Fraser called the Gateway 40 Network a group of urban planners 18 the Society Promoting Environmental Conservation SPEC the Burns Bog Conservation Society Sunbury Neighbourhood Association South Fraser Action Networks Bridgeview Community Action Group Gateway Sucks the Council of Canadians and the Western Canada Wilderness Committee These groups argue that increasing the highway s capacity will only increase traffic over the span and encourage suburban sprawl The Livable Region Coalition urged the former Minister of Transportation Kevin Falcon to consider more viable solutions to reducing congestion including more rapid transit and improved bus routes 19 The David Suzuki Foundation claims the project violates the goals of the Livable Region Strategic Plan and does not consider alternative forms of transportation 20 The provincial government studies conducted as part of the environmental assessment process project an increase of 176 000 tonnes per year in greenhouse gas emissions 21 An analysis by SPEC found that these studies included emissions in Whatcom County Washington when calculating the baseline and left them out when calculating the impact of Gateway When this is factored in the studies predict a 31 increase in road emissions 22 Groups supporting the project include Get Moving BC and the BC Truckers Association citation needed See also editGolden Ears BridgeReferences edit nbsp Wikinews has related news Polar bears deliver environmental petition to Premier of British Columbia a b c d e Gateway Program Definition Report PDF Ministry of Transportation of British Columbia January 31 2006 Archived from the original PDF on April 11 2008 Retrieved 2007 02 11 http www translink bc ca files buzzer 2007 Buzzer Oct19 pdf bare URL PDF Pre Design Community Consultation on Access and Interchange Improvements Summary Report PDF Government of British Columbia December 8 2006 Archived from the original PDF on June 11 2011 Retrieved May 5 2008 Construction of Port Mann Bridge officially over CBC News https canada constructconnect com joc news infrastructure 2015 09 port mann bridge project wraps up 1010286w Submission to Environmental Assessment Office Burns Bog Conservation Society Archived from the original on 2008 07 25 Archived copy PDF Archived from the original PDF on 2013 12 17 Retrieved 2013 12 23 a href Template Cite web html title Template Cite web cite web a CS1 maint archived copy as title link June 18 1998 PDF Archived from the original PDF on June 11 2011 Retrieved May 12 2008 Burns Bog Conservation Society Resources Sustainable Development Strategy Archived 2008 07 25 at the Wayback Machine Fraser Valley Conservation Coalition Submission to Environmental Assessment Office Sunbury Neighbourhood Association South Fraser Perimeter Road Sunburyneighbourhood ca Retrieved on 2014 04 12 Wilderness Committee Gateway to Global Warming Archived from the original on 29 September 2011 Retrieved 1 September 2011 Dawn Paley May 5 2011 Camp Closed But Resistance Continues Vancouver Media Co op Retrieved 1 September 2011 South Fraser Perimeter Road B C s newest highway opens Province of British Columbia Archived from the original on December 23 2013 Retrieved December 22 2013 South Fraser Perimeter Road completed officially opens today Canada Newswire December 21 2013 Retrieved December 22 2013 Burnaby Public Consultation on Provincial Gateway Program PDF City of Burnaby Archived from the original PDF on September 28 2007 Retrieved 2007 02 11 Standing Committee Minutes PDF City of Vancouver Retrieved 2007 02 11 Ward Doug June 20 2006 Twinning Port Mann tough sell at city council The Vancouver Sun Archived from the original on April 16 2008 Retrieved 2007 02 11 Will Freeway Expansion Kill the Livable Region Questions about the B C Government s Port Mann and Highway 1 proposal for the Vancouver Region PDF The Livable Region Coalition October 2004 Archived from the original PDF on 2007 06 28 Retrieved 2007 02 11 Proposed twinning of the Port Mann Bridge and Highway 1 expansion PDF David Suzuki Foundation Archived from the original PDF on 2007 01 18 Retrieved 2007 02 11 EPIC PDF Livable Region PDF Archived from the original PDF on 2008 05 13 Retrieved 2008 05 12 External links editOfficial Gateway Program website Ministry of Transportation The Livable Region Coalition Road to Ruin Resisting the Gateway Freeway Expansion a documentary about community resistance to the Gateway Program Retrieved from https en wikipedia org w index php title Gateway Program Vancouver amp oldid 1171541568, wikipedia, wiki, book, books, library,