fbpx
Wikipedia

Expressway S12 (Poland)

Expressway S12 or express road S12 (in Polish droga ekspresowa S12) is a Polish highway planned to run from a junction with the A1 highway near Piotrków Trybunalski to a border crossing with Ukraine at Dorohusk, passing by Radom, Lublin and Chełm. The completed road should be about 328 km (204 mi) long. As of 2023 the portion open to traffic runs from Puławy through Lublin to Piaski.

Expressway S12
Droga ekspresowa S12
Route information
Part of E373
Length86.2 km (53.6 mi)
plus 2 km single carriageway, 328 km (204 mi) planned
Major junctions
West end A1 near Piotrków Trybunalski
Major intersections S7 near Radom (planned)

S17 merge near Puławy
S19 near Lublin
S19 near Lublin (planned)

separation of S17 near Piaski (planned)
East end M 07 at the Ukrainian border
Location
CountryPoland
RegionsŁódź Voivodeship, Masovian Voivodeship, Lublin Voivodeship
Major citiesRadom, Lublin
Highway system
S 11 S 14

Sections of the Expressway edit

  • Puławy-Lublin-Piaski section, part of it co-signed with expressway S17, includes the road bypass around Lublin
    • first stage of Puławy bypass (12.7 km (7.9 mi)) with the John Paul II bridge (51°26′13″N 21°56′35″E / 51.437°N 21.943°E / 51.437; 21.943). Opened in 2008.
    • second stage of Puławy bypass to Kurów West, 11.8 km long,[1] opened to traffic on August 22, 2018.[2]
    • Kurów West - Lublin Felin - 55 km long, opened in stages May 2013, September 2014 and October 2014. This section is co-signed with S17.
    • Lublin Felin – Piaski West - 13.8 km built by upgrading existing dual carriageway road, opened as expressway in July 2013. Co-signed with S17.
    • Piaski West - Piaski East (bypass of Piaski) - 4.2 km bypass built in 2004. Co-signed with S17.

Future edit

A document outlining the future development of transport infrastructure issued by the Polish government in December 2022 projects that the road would be fully completed in 2030, however the majority of the section from Lublin to Ukrainian border will be opened in years 2024 – 2027.[3][4]

See also edit

References edit

  1. ^ . Archived from the original on 2013-12-30. Retrieved 2013-12-29.
  2. ^ . Archived from the original on 2019-07-08. Retrieved 2018-08-23.
  3. ^ https://www.gov.pl/web/infrastruktura/rzadowy-program-budowy-drog-krajowych-do-2030-r-z-perspektywa-do-2033-r
  4. ^ https://www.gov.pl/web/gddkia/mapa-stanu-budowy-drog3

expressway, poland, expressway, express, road, polish, droga, ekspresowa, polish, highway, planned, from, junction, with, highway, near, piotrków, trybunalski, border, crossing, with, ukraine, dorohusk, passing, radom, lublin, chełm, completed, road, should, a. Expressway S12 or express road S12 in Polish droga ekspresowa S12 is a Polish highway planned to run from a junction with the A1 highway near Piotrkow Trybunalski to a border crossing with Ukraine at Dorohusk passing by Radom Lublin and Chelm The completed road should be about 328 km 204 mi long As of 2023 the portion open to traffic runs from Pulawy through Lublin to Piaski Expressway S12Droga ekspresowa S12Route informationPart of E373Length86 2 km 53 6 mi plus 2 km single carriageway 328 km 204 mi plannedMajor junctionsWest endA1 near Piotrkow TrybunalskiMajor intersectionsS7 near Radom planned S17 merge near Pulawy S19 near Lublin S19 near Lublin planned separation of S17 near Piaski planned East endM 07 at the Ukrainian borderLocationCountryPolandRegionsLodz Voivodeship Masovian Voivodeship Lublin VoivodeshipMajor citiesRadom LublinHighway systemNational roads in Poland Voivodeship roads S 11 S 14 Contents 1 Sections of the Expressway 2 Future 3 See also 4 ReferencesSections of the Expressway editPulawy Lublin Piaski section part of it co signed with expressway S17 includes the road bypass around Lublin first stage of Pulawy bypass 12 7 km 7 9 mi with the John Paul II bridge 51 26 13 N 21 56 35 E 51 437 N 21 943 E 51 437 21 943 Opened in 2008 second stage of Pulawy bypass to Kurow West 11 8 km long 1 opened to traffic on August 22 2018 2 Kurow West Lublin Felin 55 km long opened in stages May 2013 September 2014 and October 2014 This section is co signed with S17 Lublin Felin Piaski West 13 8 km built by upgrading existing dual carriageway road opened as expressway in July 2013 Co signed with S17 Piaski West Piaski East bypass of Piaski 4 2 km bypass built in 2004 Co signed with S17 Future editA document outlining the future development of transport infrastructure issued by the Polish government in December 2022 projects that the road would be fully completed in 2030 however the majority of the section from Lublin to Ukrainian border will be opened in years 2024 2027 3 4 See also editHighways in PolandReferences edit Wielu chetnych do budowy II etapu obwodnicy Pulaw Archived from the original on 2013 12 30 Retrieved 2013 12 29 Otwarcie drugiego etapu obwodnicy Pulaw Archived from the original on 2019 07 08 Retrieved 2018 08 23 https www gov pl web infrastruktura rzadowy program budowy drog krajowych do 2030 r z perspektywa do 2033 r https www gov pl web gddkia mapa stanu budowy drog3 Retrieved from https en wikipedia org w index php title Expressway S12 Poland amp oldid 1215257403, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.