Dove Holes Tunnel

Dove Holes Tunnel is a tunnel built by the Midland Railway between Peak Forest Signal Box and Chapel-en-le-Frith in Derbyshire in 1860–64, now carrying the Great Rocks Line.

Train leaving Dove Holes Tunnel
Location of the tunnel within the Peak District

In the mid-nineteenth century, the Manchester, Buxton, Matlock and Midlands Junction Railway was jointly leased by the LNWR and Midland Railway, and ran as far as Rowsley. The Midland wished to extend to Manchester to give it a service to London but the LNWR, having its own London line, declined. It then supported the Stockport, Disley and Whaley Bridge Railway in building a line from Whaley Bridge to Buxton, one which the Midland considered unsuitable as a main line, due to its steep gradients over Cow Low.

In the end, however, the Midland came to an agreement with the Manchester, Sheffield and Lincolnshire Railway that was formalised as the Sheffield and Midland Railway Companies' Committee. The Midland would extend its line to New Mills to meet a line the MS&LR was building from its main line out of Manchester.

The Midland constructed a junction on its Buxton line at Peak Forest Signal Box which ran under Dove Holes in a tunnel 2,984 yards (2,729 m) long, some 183 feet (56 m) beneath the LNWR line. The entrance was at the summit of the line, nearly 1,000 feet (300 m) above sea level, and descended nearly a hundred feet at a gradient of 1 in 90.[1]

Construction edit

Begun in 1860, it took five years to build. The navvies lived where they could, in huts or crevices in the rock. Six pumping stations were needed to keep the workings clear of water, an underground river being encountered at one stage. This was diverted but burst through again. On being diverted a second time, a local curiosity, the Barmoor Clough "Ebbing and Flowing Well", partially dried up.

Being on the edge of the Derbyshire White Peak the tunnel was partly though gritstone and partly through limestone, which gave considerable problems. In 1872 it partially collapsed and again in 1940.

Problems edit

Beside the frequent expresses, it was heavily used by goods trains. As has been mentioned, there was a considerable uphill gradient in the southbound direction. Moreover, several trains may have been held in the loop before it, to allow an express to pass. By the time two or three had gone through, all accelerating hard, one could cut the smoke with a knife. The crew of a following goods train at around 10 mph (16 km/h), would have to crouch down with handkerchiefs over their faces. Meanwhile, they had to hold the speed steady enough not to cause wheelslip, and not to snatch the train, causing a coupling to break, which would strand them in the fume-laden darkness.

Apart from damp rails, it was extremely hot in summer, while, in winter, long icicles would form from the roof. The first engine through in the morning would break them off (the crews staying well inside the cab), but when diesels came into use there were a number of broken windscreens. After one driver suffered serious injury the Buxton snowplough was fitted with ice clearing equipment. The heavy traffic took its toll on the tunnel lining. On one occasion a locomotive emerged with a pile of bricks on top of its firebox.[2]

Present day edit

Since the line to Rowsley closed in 1967 the tunnel has remained in use for stone freight trains serving the Buxton lime industry as the Great Rocks Line.

In 2004 the Derbyshire County Council carried out a feasibility study into reopening the line from Rowsley, in which its recommendations were split between running directly to New Mills, reinstating the tunnel as a passenger line, or running into Buxton and using the ex-LNWR line, which would mean reversing the train.[3]

At the end of 2011, major work was undertaken to correct the structural clearances that had been disrupted over the years. The track renewed, the drainage cleared and the gauge works were undertaken.[4]

References edit

  1. ^ Radford, B., (1988) Midland Though The Peak Unicorn Books
  2. ^ Bentley, C., (1997) British Railways Operating History: Volume One, The Peak District, Carnarvon: XPress Publishing.
  3. ^ Derbyshire County Council (2004) Derby to Manchester Railway Matlock to Buxton / Chinley Link Study. Main Report, Volume 1A: Version: Final.
  4. ^ Taylor, Grahame (1 February 2012). "Draining Dove Holes". The Rail Engineer. Retrieved 10 August 2012.

External links edit

  • "Science and Society" Construction of Dove Holes Tunnel, Derbyshire, 1860–1865.
  • Map sources for Dove Holes Tunnel

53°18′28″N 1°53′47″W / 53.30790°N 1.89641°W / 53.30790; -1.89641

dove, holes, tunnel, tunnel, built, midland, railway, between, peak, forest, signal, chapel, frith, derbyshire, 1860, carrying, great, rocks, line, train, leaving, location, tunnel, within, peak, district, nineteenth, century, manchester, buxton, matlock, midl. Dove Holes Tunnel is a tunnel built by the Midland Railway between Peak Forest Signal Box and Chapel en le Frith in Derbyshire in 1860 64 now carrying the Great Rocks Line Train leaving Dove Holes Tunnel Location of the tunnel within the Peak District In the mid nineteenth century the Manchester Buxton Matlock and Midlands Junction Railway was jointly leased by the LNWR and Midland Railway and ran as far as Rowsley The Midland wished to extend to Manchester to give it a service to London but the LNWR having its own London line declined It then supported the Stockport Disley and Whaley Bridge Railway in building a line from Whaley Bridge to Buxton one which the Midland considered unsuitable as a main line due to its steep gradients over Cow Low In the end however the Midland came to an agreement with the Manchester Sheffield and Lincolnshire Railway that was formalised as the Sheffield and Midland Railway Companies Committee The Midland would extend its line to New Mills to meet a line the MS amp LR was building from its main line out of Manchester The Midland constructed a junction on its Buxton line at Peak Forest Signal Box which ran under Dove Holes in a tunnel 2 984 yards 2 729 m long some 183 feet 56 m beneath the LNWR line The entrance was at the summit of the line nearly 1 000 feet 300 m above sea level and descended nearly a hundred feet at a gradient of 1 in 90 1 Contents 1 Construction 2 Problems 3 Present day 4 References 5 External linksConstruction editThis section does not cite any sources Please help improve this section by adding citations to reliable sources Unsourced material may be challenged and removed June 2021 Learn how and when to remove this message Begun in 1860 it took five years to build The navvies lived where they could in huts or crevices in the rock Six pumping stations were needed to keep the workings clear of water an underground river being encountered at one stage This was diverted but burst through again On being diverted a second time a local curiosity the Barmoor Clough Ebbing and Flowing Well partially dried up Being on the edge of the Derbyshire White Peak the tunnel was partly though gritstone and partly through limestone which gave considerable problems In 1872 it partially collapsed and again in 1940 Problems editBeside the frequent expresses it was heavily used by goods trains As has been mentioned there was a considerable uphill gradient in the southbound direction Moreover several trains may have been held in the loop before it to allow an express to pass By the time two or three had gone through all accelerating hard one could cut the smoke with a knife The crew of a following goods train at around 10 mph 16 km h would have to crouch down with handkerchiefs over their faces Meanwhile they had to hold the speed steady enough not to cause wheelslip and not to snatch the train causing a coupling to break which would strand them in the fume laden darkness Apart from damp rails it was extremely hot in summer while in winter long icicles would form from the roof The first engine through in the morning would break them off the crews staying well inside the cab but when diesels came into use there were a number of broken windscreens After one driver suffered serious injury the Buxton snowplough was fitted with ice clearing equipment The heavy traffic took its toll on the tunnel lining On one occasion a locomotive emerged with a pile of bricks on top of its firebox 2 Present day editSince the line to Rowsley closed in 1967 the tunnel has remained in use for stone freight trains serving the Buxton lime industry as the Great Rocks Line In 2004 the Derbyshire County Council carried out a feasibility study into reopening the line from Rowsley in which its recommendations were split between running directly to New Mills reinstating the tunnel as a passenger line or running into Buxton and using the ex LNWR line which would mean reversing the train 3 At the end of 2011 major work was undertaken to correct the structural clearances that had been disrupted over the years The track renewed the drainage cleared and the gauge works were undertaken 4 References edit Radford B 1988 Midland Though The Peak Unicorn Books Bentley C 1997 British Railways Operating History Volume One The Peak District Carnarvon XPress Publishing Derbyshire County Council 2004 Derby to Manchester Railway Matlock to Buxton Chinley Link Study Main Report Volume 1A Version Final Taylor Grahame 1 February 2012 Draining Dove Holes The Rail Engineer Retrieved 10 August 2012 This article includes a list of general references but it lacks sufficient corresponding inline citations Please help to improve this article by introducing more precise citations August 2009 Learn how and when to remove this message External links edit Science and Society Construction of Dove Holes Tunnel Derbyshire 1860 1865 Map sources for Dove Holes Tunnel 53 18 28 N 1 53 47 W 53 30790 N 1 89641 W 53 30790 1 89641 Retrieved from https en wikipedia org w index php title Dove Holes Tunnel amp oldid 1084324600, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.