The Rashava-Deralok Dam is a gravity dam currently being constructed on the Great Zab River, just upstream of the town of Deralok in Dohuk Governorate, Kurdistan region of Iraq. The dam will support a 37.6 MW run-of-the-river hydroelectric power station, with the primary purpose to address continued power shortfalls in the region, most precisely to supply the towns of Amadiya and Badinan.[1][2]

Rashava-Deralok Dam
Location of Rashava-Deralok Dam in Iraq
CountryIraq
LocationDeraluk, Dohuk Governorate, Kurdistan Region
Coordinates37°4′17″N 43°39′29″E / 37.07139°N 43.65806°E / 37.07139; 43.65806Coordinates: 37°4′17″N 43°39′29″E / 37.07139°N 43.65806°E / 37.07139; 43.65806
PurposePower, flood control
StatusUnder construction
Construction beganOctober 2016
Opening date2020 (est.)
Construction cost$168 million
Owner(s)Kurdistan Regional Government
Dam and spillways
Type of damGravity, diversion weir
ImpoundsGreat Zab
Height30 m (98 ft)
Height (foundation)29 m
Height (thalweg)26 m
Length119 m
Elevation at crest640 m
Width (crest)5.5 m
Dam volume200,000 m3
Deralok Hydropower Station
Commission date2020 (est.)
TypeRun-of-the-river
Hydraulic head17 m
Turbines2 x 18.8 MW Kaplan-type
Installed capacity37.6 MW

According to Kurdish Prime Minister Nechirvan Barzani, it is the first hydropower project launched by the Kurdistan Regional Government.[3]

Contractors

The contract to build the dam and power station was awarded to a Boland Payeh - Farab (two iranian construction companies) joint-venture. It is being financed and supervised by the Japan International Cooperation Agency. A signing ceremony was held in December 2013.[4] The total cost of the project is estimated at $168 million, including $129 million for the dam itself, the remaining consisting in the construction of a 132 kV transmission line and substation, completed in a first stage.[2]

Timeline

Kurdish Prime Minister inaugurated the project in November 2015, but construction of the dam actually began in October 2016.[3][1] The project is expected to be complete in 2020.[1]

References

  1. ^ a b c "Deralok dam and hydropower plant". www.ttbp.ir. from the original on 2020-03-01. Retrieved 2020-04-24.
  2. ^ a b "Iraq Project Series: Deralok Hydropower Plant Construction Project (Overview)". Youtube. JICA. 22 January 2020. Retrieved 24 April 2020.{{cite web}}: CS1 maint: url-status (link)
  3. ^ a b "www.rudaw.net/english/kurdistan/191120152". www.rudaw.net. Retrieved 2017-02-24.
  4. ^ "The Signing Ceremony for Deralok Hydropower Plant Construction Project, for which JICA provides Japanese ODA loan, was held. | JICA Iraq Office | About JICA | JICA". www.jica.go.jp. Retrieved 2020-04-24.

External links

deralok, rashava, gravity, currently, being, constructed, great, river, just, upstream, town, deralok, dohuk, governorate, kurdistan, region, iraq, will, support, river, hydroelectric, power, station, with, primary, purpose, address, continued, power, shortfal. The Rashava Deralok Dam is a gravity dam currently being constructed on the Great Zab River just upstream of the town of Deralok in Dohuk Governorate Kurdistan region of Iraq The dam will support a 37 6 MW run of the river hydroelectric power station with the primary purpose to address continued power shortfalls in the region most precisely to supply the towns of Amadiya and Badinan 1 2 Rashava Deralok DamLocation of Rashava Deralok Dam in IraqCountryIraqLocationDeraluk Dohuk Governorate Kurdistan RegionCoordinates37 4 17 N 43 39 29 E 37 07139 N 43 65806 E 37 07139 43 65806 Coordinates 37 4 17 N 43 39 29 E 37 07139 N 43 65806 E 37 07139 43 65806PurposePower flood controlStatusUnder constructionConstruction beganOctober 2016Opening date2020 est Construction cost 168 millionOwner s Kurdistan Regional GovernmentDam and spillwaysType of damGravity diversion weirImpoundsGreat ZabHeight30 m 98 ft Height foundation 29 mHeight thalweg 26 mLength119 mElevation at crest640 mWidth crest 5 5 mDam volume200 000 m3Deralok Hydropower StationCommission date2020 est TypeRun of the riverHydraulic head17 mTurbines2 x 18 8 MW Kaplan typeInstalled capacity37 6 MWAccording to Kurdish Prime Minister Nechirvan Barzani it is the first hydropower project launched by the Kurdistan Regional Government 3 Contents 1 Contractors 2 Timeline 3 References 4 External linksContractors EditThe contract to build the dam and power station was awarded to a Boland Payeh Farab two iranian construction companies joint venture It is being financed and supervised by the Japan International Cooperation Agency A signing ceremony was held in December 2013 4 The total cost of the project is estimated at 168 million including 129 million for the dam itself the remaining consisting in the construction of a 132 kV transmission line and substation completed in a first stage 2 Timeline EditKurdish Prime Minister inaugurated the project in November 2015 but construction of the dam actually began in October 2016 3 1 The project is expected to be complete in 2020 1 References Edit a b c Deralok dam and hydropower plant www ttbp ir Archived from the original on 2020 03 01 Retrieved 2020 04 24 a b Iraq Project Series Deralok Hydropower Plant Construction Project Overview Youtube JICA 22 January 2020 Retrieved 24 April 2020 a href Template Cite web html title Template Cite web cite web a CS1 maint url status link a b www rudaw net english kurdistan 191120152 www rudaw net Retrieved 2017 02 24 The Signing Ceremony for Deralok Hydropower Plant Construction Project for which JICA provides Japanese ODA loan was held JICA Iraq Office About JICA JICA www jica go jp Retrieved 2020 04 24 External links Edit Iraq portal Water portal Renewable energy portal Retrieved from https en wikipedia org w index php title Deralok Dam amp oldid 1071337398, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.