fbpx
Wikipedia

Dan Ryan branch

The Dan Ryan branch is a 9.4 mi (15.1 km) long section of the Chicago "L" system located on the South Side of Chicago, Illinois. It is operated by the Chicago Transit Authority, as part of its Red Line service and is normally through-routed downtown towards the North Side via the State Street subway. As of February 2013, the branch serves (on average) 45,355 passengers per weekday.[1] As part of the CTA's busiest rapid transit line, it is operated 24 hours a day, 365 days a year. The branch serves the Chinatown, Armour Square, Fuller Park, Englewood, Greater Grand Crossing, Chatham and Roseland neighborhoods.

Dan Ryan branch
A southbound Red Line train on its way to 95th
Overview
StatusIn Service
LocaleChicago, Illinois, United States
Termini
Stations9
Service
TypeRapid transit
SystemChicago "L"
ServicesRed
Operator(s)Chicago Transit Authority
Rolling stock5000-series
Daily ridership39,639
(average weekday 2019)
History
OpenedSeptember 28, 1969
Technical
Line length9.4 mi (15.1 km)
CharacterExpressway median, Elevated
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationThird rail, 600 V DC
Route map

History edit

After World War II, the CTA built three new branches of the "L" through the medians of freeways. The first was the Congress Branch, which opened on June 22, 1958. On July 30, 1958, proposals for a line in the median of the Dan Ryan Expressway and a line in the median of the Kennedy Expressway were among a series of projects proposed by the CTA.[2] The Dan Ryan branch was built between 1967 and 1969 for a total cost of $38 million. When the branch opened on September 28, 1969, it was connected to the Lake Street Elevated via the Loop and the South Side Main Line. The branch was successful from the start, exceeding forecasts by 10%, and carrying an average of 99,000 passengers per day by the end of 1970. The opening of the Dan Ryan branch resulted in a decrease in ridership on the South Side Elevated and its two branches to Englewood and Jackson Park. On January 4, 1978, several large cracks were discovered under the elevated portion of the Dan Ryan branch near Clark and 18th Streets. Service was suspended on this portion of the branch from January 4 to January 17, while repairs were being made.

On February 21, 1993, when the L routes were to be color-coded, the Dan Ryan branch became part of the present day Red Line. The CTA had decided that the Dan Ryan Branch's routing was inefficient due to the fact that the Dan Ryan branch and North Side Main Line had a comparatively higher number of riders than the Lake Branch and South Side Elevated. On February 21, 1993, the Dan Ryan branch was connected to the State Street subway and the North Side Main Line with service to Howard, while the Lake Branch would be paired with the South Side Elevated and its Englewood and Jackson Park branches via The Loop to form the Green Line. The Dan Ryan branch connected to the State Street subway via the subway's new extension to 16th and Wentworth, which was built from 1985 to 1990.

The Dan Ryan branch initially used concrete railroad ties, but these were replaced by wooden ties after the concrete ties began to age more rapidly than expected. On April 17, 2004, the CTA began a $192.5 million rehabilitation of the Dan Ryan branch, which included installing a new signal system, replacing and upgrading substations, renovating platform canopies, and installing new elevators at the 47th and 69th stations.[3]

Red Line South reconstruction project edit

On November 3, 2011, local funding and $646 million in state funding was announced by Mayor Rahm Emanuel, Governor Pat Quinn, CTA President Forrest Claypool, several state lawmakers, and nearly a dozen aldermen, for a reconstruction project on the branch. Two options concerning the duration of construction were considered: a five-month duration with no service the entire time, or four years of weekend only work. The choice was for the five-month period and no services.[4]

On May 19, 2013, the Dan Ryan branch closed as part of the Red Line South Reconstruction Project which costed $425 million.[4] With the branch being 44 years old, track conditions had been causing Red Line riders to experience longer travel times, overcrowded trains and a less reliable service. As part of the project, the Garfield, 63rd, and 87th stations were renovated and equipped with an elevator, making all Dan Ryan branch stations fully accessible for passengers with disabilities. During reconstruction, Red Line trains were rerouted on the South Side Elevated to Ashland/63rd. The newly reconstructed Dan Ryan branch and the nine stations reopened on October 20, 2013.[5]

Extension edit

Proposals are currently underway to extend the Red Line south from 95th Street. The CTA developed nine different proposed routes, one of which includes routing the Red Line down the median of the Bishop Ford Freeway and another in the median of Interstate 57. During an alternatives analysis meeting on April 11, 2007, CTA narrowed further study down to five possible routes, two for bus rapid transit and three for heavy rail (rapid) transit. The two bus routes would travel south from the 95th/Dan Ryan terminal either down Halsted Street or Michigan Avenue, while the heavy rail routes left for consideration were the Halsted and Michigan corridors (either underground or elevated) as well as the Union Pacific Railroad corridor (elevated or trench), which would traverse southeastward toward the South Shore Line. In October 2008, the CTA commissioned a $150,000-study of an extension due south to 130th/Stony Island in the community area of Riverdale.[6]

Alternatives edit

In December 2008, at the Screen 2 presentation of the federally mandated Alternatives Analysis Study, the possible corridors and modes of transit were furthered narrowed down to either Halsted Street (Bus Rapid Transit or elevated Heavy Rail Transit) and the Union Pacific Railroad corridor (elevated Heavy Rail Transit).[7]

In December 2009, the CTA identified the Locally Preferred Alternative as the Union Pacific corridor.[8] A map and description of the route are found here: Multiple Environmental Impact Studies will be carried out, and will determine exact alignments and design.[8][9]

The alignment consists of a new elevated rail line between 95th/Dan Ryan and a new terminal station at 130th Street, paralleling the Union Pacific Railroad and the South Shore Line, through the Far South Side neighborhoods of Roseland, Washington Heights, West Pullman, and Riverdale. In addition to the terminal station at 130th, three new stations would be built at 103rd, 111th, and Michigan, and a new yard and shop would be built at 120th street. Basic engineering, along with an environmental impact statement, are currently underway.[10]

Station listing edit

Station Location
Cermak–Chinatown   138 W. Cermak Road
Sox–35th     142 W. 35th Street
47th   220 W. 47th Street
Garfield   220 W. Garfield Boulevard
63rd   220 W. 63rd Street
69th   15 W. 69th Street
79th   15 W. 79th Street
87th   15 W. 87th Street
95th/Dan Ryan   15 W. 95th Street
103rd   405 W. 103rd Street
111th   357 W. 111th Street
Michigan   11549 S. Michigan Avenue
130th   TBD

Image gallery edit

References edit

  1. ^ (PDF). Chicago Transit Authority. Archived from the original (PDF) on February 4, 2018. Retrieved April 8, 2013.
  2. ^ Chicago Transit Authority (July 30, 1958). "Chicago Transit Authority Proposed $315,000,000, Twenty-Year Transit Expansion and Improvement Program". Chicago-L.org. Retrieved August 21, 2013.
  3. ^ Graham, Garfield. "Red Line: Dan Ryan branch". Chicago-L.org. Retrieved January 11, 2013.
  4. ^ a b . Chicago Transit Authority. Archived from the original on June 17, 2012. Retrieved June 15, 2012.
  5. ^ . Chicago Transit Authority. Archived from the original on October 14, 2013. Retrieved October 8, 2013.
  6. ^ Regional Transit Authority (2008-10-03). (PDF) (Press release). Archived from the original (PDF) on May 23, 2011. Retrieved 2008-10-09.
  7. ^ (PDF). Archived from the original (PDF) on August 27, 2017. Retrieved 6 January 2009.
  8. ^ a b . Red Line Extension Project. Chicago Transit Authority. Archived from the original on January 7, 2010. Retrieved December 17, 2009.
  9. ^ . Red Line Extension Project. Chicago Transit Authority. Archived from the original on January 8, 2010. Retrieved December 17, 2009.
  10. ^ "Red Line Extension Project". Chicago Transit Authority. Retrieved February 25, 2010.

External links edit

  • Red Line: Dan Ryan Branch

ryan, branch, long, section, chicago, system, located, south, side, chicago, illinois, operated, chicago, transit, authority, part, line, service, normally, through, routed, downtown, towards, north, side, state, street, subway, february, 2013, branch, serves,. The Dan Ryan branch is a 9 4 mi 15 1 km long section of the Chicago L system located on the South Side of Chicago Illinois It is operated by the Chicago Transit Authority as part of its Red Line service and is normally through routed downtown towards the North Side via the State Street subway As of February 2013 the branch serves on average 45 355 passengers per weekday 1 As part of the CTA s busiest rapid transit line it is operated 24 hours a day 365 days a year The branch serves the Chinatown Armour Square Fuller Park Englewood Greater Grand Crossing Chatham and Roseland neighborhoods Dan Ryan branchA southbound Red Line train on its way to 95thOverviewStatusIn ServiceLocaleChicago Illinois United StatesTerminiCermak Chinatown95th Dan RyanStations9ServiceTypeRapid transitSystemChicago L ServicesRedOperator s Chicago Transit AuthorityRolling stock5000 seriesDaily ridership39 639 average weekday 2019 HistoryOpenedSeptember 28 1969TechnicalLine length9 4 mi 15 1 km CharacterExpressway median ElevatedTrack gauge4 ft 8 1 2 in 1 435 mm standard gaugeElectrificationThird rail 600 V DCRoute mapLegend Rock Island Districtto LaSalle Street State Street Subway South Side Main Line 17th Junction Midway branchto Midway Federal JunctionCermak Junction Cermak Chinatown Exit 53C I 55 I 90 I 94 Sox 35th Chicago Junction Railway 47th Garfield 59th Junction Jackson Park branchto Cottage Grove 63rd Englewood branchto Ashland 63rd Rock Island Districtto Joliet I 90 69th 79th 87th 95th Dan Ryan I 57 98th Yard vte Contents 1 History 1 1 Red Line South reconstruction project 2 Extension 2 1 Alternatives 3 Station listing 4 Image gallery 5 References 6 External linksHistory editAfter World War II the CTA built three new branches of the L through the medians of freeways The first was the Congress Branch which opened on June 22 1958 On July 30 1958 proposals for a line in the median of the Dan Ryan Expressway and a line in the median of the Kennedy Expressway were among a series of projects proposed by the CTA 2 The Dan Ryan branch was built between 1967 and 1969 for a total cost of 38 million When the branch opened on September 28 1969 it was connected to the Lake Street Elevated via the Loop and the South Side Main Line The branch was successful from the start exceeding forecasts by 10 and carrying an average of 99 000 passengers per day by the end of 1970 The opening of the Dan Ryan branch resulted in a decrease in ridership on the South Side Elevated and its two branches to Englewood and Jackson Park On January 4 1978 several large cracks were discovered under the elevated portion of the Dan Ryan branch near Clark and 18th Streets Service was suspended on this portion of the branch from January 4 to January 17 while repairs were being made On February 21 1993 when the L routes were to be color coded the Dan Ryan branch became part of the present day Red Line The CTA had decided that the Dan Ryan Branch s routing was inefficient due to the fact that the Dan Ryan branch and North Side Main Line had a comparatively higher number of riders than the Lake Branch and South Side Elevated On February 21 1993 the Dan Ryan branch was connected to the State Street subway and the North Side Main Line with service to Howard while the Lake Branch would be paired with the South Side Elevated and its Englewood and Jackson Park branches via The Loop to form the Green Line The Dan Ryan branch connected to the State Street subway via the subway s new extension to 16th and Wentworth which was built from 1985 to 1990 The Dan Ryan branch initially used concrete railroad ties but these were replaced by wooden ties after the concrete ties began to age more rapidly than expected On April 17 2004 the CTA began a 192 5 million rehabilitation of the Dan Ryan branch which included installing a new signal system replacing and upgrading substations renovating platform canopies and installing new elevators at the 47th and 69th stations 3 Red Line South reconstruction project edit On November 3 2011 local funding and 646 million in state funding was announced by Mayor Rahm Emanuel Governor Pat Quinn CTA President Forrest Claypool several state lawmakers and nearly a dozen aldermen for a reconstruction project on the branch Two options concerning the duration of construction were considered a five month duration with no service the entire time or four years of weekend only work The choice was for the five month period and no services 4 On May 19 2013 the Dan Ryan branch closed as part of the Red Line South Reconstruction Project which costed 425 million 4 With the branch being 44 years old track conditions had been causing Red Line riders to experience longer travel times overcrowded trains and a less reliable service As part of the project the Garfield 63rd and 87th stations were renovated and equipped with an elevator making all Dan Ryan branch stations fully accessible for passengers with disabilities During reconstruction Red Line trains were rerouted on the South Side Elevated to Ashland 63rd The newly reconstructed Dan Ryan branch and the nine stations reopened on October 20 2013 5 Extension editvteDan Ryan extension Legend nbsp I 94 nbsp nbsp Dan Ryanbranch UPRR nbsp nbsp nbsp nbsp 95th Dan Ryan nbsp I 57 nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp 98th Yard nbsp nbsp 103rd nbsp nbsp nbsp nbsp 111th nbsp nbsp nbsp nbsp nbsp Michigan nbsp nbsp nbsp 130th Between I 57 and Michigan alignment could be eithereast or west of UPRR Only east alignment shown Proposals are currently underway to extend the Red Line south from 95th Street The CTA developed nine different proposed routes one of which includes routing the Red Line down the median of the Bishop Ford Freeway and another in the median of Interstate 57 During an alternatives analysis meeting on April 11 2007 CTA narrowed further study down to five possible routes two for bus rapid transit and three for heavy rail rapid transit The two bus routes would travel south from the 95th Dan Ryan terminal either down Halsted Street or Michigan Avenue while the heavy rail routes left for consideration were the Halsted and Michigan corridors either underground or elevated as well as the Union Pacific Railroad corridor elevated or trench which would traverse southeastward toward the South Shore Line In October 2008 the CTA commissioned a 150 000 study of an extension due south to 130th Stony Island in the community area of Riverdale 6 Alternatives edit In December 2008 at the Screen 2 presentation of the federally mandated Alternatives Analysis Study the possible corridors and modes of transit were furthered narrowed down to either Halsted Street Bus Rapid Transit or elevated Heavy Rail Transit and the Union Pacific Railroad corridor elevated Heavy Rail Transit 7 In December 2009 the CTA identified the Locally Preferred Alternative as the Union Pacific corridor 8 A map and description of the route are found here 1 Multiple Environmental Impact Studies will be carried out and will determine exact alignments and design 8 9 The alignment consists of a new elevated rail line between 95th Dan Ryan and a new terminal station at 130th Street paralleling the Union Pacific Railroad and the South Shore Line through the Far South Side neighborhoods of Roseland Washington Heights West Pullman and Riverdale In addition to the terminal station at 130th three new stations would be built at 103rd 111th and Michigan and a new yard and shop would be built at 120th street Basic engineering along with an environmental impact statement are currently underway 10 Station listing editStation Location Cermak Chinatown nbsp 138 W Cermak Road Sox 35th nbsp nbsp 142 W 35th Street 47th nbsp 220 W 47th Street Garfield nbsp 220 W Garfield Boulevard 63rd nbsp 220 W 63rd Street 69th nbsp 15 W 69th Street 79th nbsp 15 W 79th Street 87th nbsp 15 W 87th Street 95th Dan Ryan nbsp 15 W 95th Street 103rd nbsp 405 W 103rd Street 111th nbsp 357 W 111th Street Michigan nbsp 11549 S Michigan Avenue 130th nbsp TBDImage gallery edit nbsp The Dan Ryan Branch undergoing construction November 1968 nbsp The Sox 35th station at night August 2011 nbsp The 95th Dan Ryan station is the southern terminus of the Red LineReferences edit Ridership Report February 2013 PDF Chicago Transit Authority Archived from the original PDF on February 4 2018 Retrieved April 8 2013 Chicago Transit Authority July 30 1958 Chicago Transit Authority Proposed 315 000 000 Twenty Year Transit Expansion and Improvement Program Chicago L org Retrieved August 21 2013 Graham Garfield Red Line Dan Ryan branch Chicago L org Retrieved January 11 2013 a b Red Line South Track Renewal Project Chicago Transit Authority Archived from the original on June 17 2012 Retrieved June 15 2012 Red Line South Project Countdown until Completion Day Chicago Transit Authority Archived from the original on October 14 2013 Retrieved October 8 2013 Regional Transit Authority 2008 10 03 RTA Funded Study Looks at the Impact of the Proposed Red Line Extension PDF Press release Archived from the original PDF on May 23 2011 Retrieved 2008 10 09 Red Line Extension Alternatives Analysis Study PDF Archived from the original PDF on August 27 2017 Retrieved 6 January 2009 a b About the Project Alternatives Red Line Extension Project Chicago Transit Authority Archived from the original on January 7 2010 Retrieved December 17 2009 Project Schedule Red Line Extension Project Chicago Transit Authority Archived from the original on January 8 2010 Retrieved December 17 2009 Red Line Extension Project Chicago Transit Authority Retrieved February 25 2010 External links editRed Line Dan Ryan Branch Retrieved from https en wikipedia org w index php title Dan Ryan branch amp oldid 1221072227, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.