The Dachau–Altomünster railway, also called the Bummerl, Bockerl or Ludwig Thoma Railway, is a railway in the German state of Bavaria. It is part of the Munich S-Bahn network and is integrated within the Münchner Verkehrs- und Tarifverbund (Munich Transport and Tariff Association, MVV) as line S2. The branch line connects the town of Dachau on the Munich–Treuchtlingen railway with Altomünster. Markt Indersdorf is an important stop. Until its electrification in 2014, it was the only non-electrified line of the Munich S-Bahn and was designated as line A.

Dachau–Altomünster
Overview
Line number5502
LocaleBavaria
Service
Route number999.2 999.30 (until 2014)
Technical
Line length29.9 km (18.6 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification15 kV/16.7 Hz AC overhead catenary
Route map

km
0.0
Dachau Bahnhof
from paper mill
1.4
Dachau Stadt
4.1
Breitenau
6.0
Bachern
(since 2014)
6.4
Bachern
(until 2014)
8.3
from Oberbachern substation
9.1
Schwabhausen (b Dachau)
496 m
12.2
Niederroth
16.3
Markt Indersdorf
470 m
19.1
Arnbach
22.5
Erdweg
475 m
25.7
Kleinberghofen
28.6
Stumpfenbach
29.9
Altomünster
494 m
Source: German railway atlas[1]

History edit

 
S-Bahn line A with class 628 train to Altomünster
 
Schwabhausen (b Dachau) station building 2013

At the beginning of the year 1900 it was decided to build a railway line from the Munich–Ingolstadt line (now part of the Nuremberg–Munich high-speed line) for the development of the hinterland of Dachau. There were two option for the route: connecting Altomünster via Schwabhausen and Erdweg from Dachau station or connecting Markt Indersdorf from Hebertshausen.

The respective municipalities could not agree on one or other the routes and so came to a compromise. This compromise is reflected in the present route. First it runs west to Schwabhausen, then continues north to Indersdorf and turns back to the southwest to run up the Glonn valley to Erdweg. From there, the line heads back to the northwest to Altomünster. This means that the line takes 29.9 kilometres between Dachau and Altomünster, which are about 20 kilometres apart in a direct line.

The first section from Dachau to Indersdorf was opened on 8 July 1912 and the whole line to Altomünster was commissioned as the "Dachauer Lokalbahn" on 18 December 1913.

At the time of the Bavarian Soviet Republic, the local railway was an important economic factor for the revolutionary government. The money printed in the paper mill in Dachau could be transported directly to Munich without substantial detours.

Since the establishment of the MVV, the whole line has been integrated in the MVV's system of fares. It was formerly served by local trains, operated with push–pull trains trains made up of yl and Silberling carriage, hauled by locomotives of class 211 and later 212. In 1995, the still non-electrified railway was included as line A of the Munich S-Bahn.

In the 2000s, planning began for the electrification of the suburban railway line. The estimated cost in 2005 was €32 million.[2] The planning agreement for electrification was signed at the end of June 2006.[3] Originally, the construction was to begin in 2012, with completion scheduled for 2013,[4] but the work was repeatedly postponed.[5] Final planning approval was issued in January 2013. In mid-November 2013, the contract for the electrification of the line was estimated to be worth €8 million. As part of the European tender five bids were received.[6] The final cost estimate was €47 million.[7]

From April 28 to 13 December 2014, the line was completely closed for the construction work. The S-Bahn line was continuously electrified and a passing loop was installed between Bachem and Schwabhausen. A crossing loop was installed at Erdweg station and the existing crossing loop at Markt Indersdorf station was removed.[8] This made services at 30-minute intervals possible.[9] There were delays in the construction and the railway could not be opened for operations as planned on 17 November, but services resumed at the timetable change on 14 December 2014.

Operations edit

 
Class 628 DMU of line A near Schwabhausen

Until April 2014, services on line A ran hourly from Dachau to Altomünster. In the peak hour a service ran through to Munich Central Station (Hauptbahnhof). The line was operated with class 628 diesel multiple units. On 27 April 2014, DB suspended operations for the electrification of the line. The rail service between Dachau and Altomuenster was replaced by buses until December 2014.

On 14 December 2014, the electrical services of line S2 commenced on the line. The service was increased from 38 to 57 pairs of trains. 39 pairs of trains run every hour directly from Altomünster to Munich, with some continuing to Markt Schwaben and Erding in the peak hour. These services combine in Dachau with the S2 services between Peterhausen and Markt Schwaben. These trains are operated with class 423 four-car electrical multiple units of the S-Bahn. The remaining pairs of trains run only between Altomünster and Dachau and contribute to a 30-minute interval service during the peak hour. The additional trains are operated with class 420 four-car electrical multiple units, restoring this class to the Munich S-Bahn network.

The formerly rather brisk freight transport for agricultural products (cereals, milk, cattle), coal, building materials, animal feed and fertilisers mostly ended before the reconstruction of the line in 1982.

References edit

  1. ^ Eisenbahnatlas Deutschland [German railway atlas] (in German). Schweers + Wall. 2009. pp. 107, 166. ISBN 978-3-89494-139-0.
  2. ^ "Bayern kämpft um Bundesmittel für Ausbauten im Schienennetz". Eisenbahn-Revue International (in German) (5): 242 f. 2005. ISSN 1421-2811.
  3. ^ "S-Bahn München wird ausgebaut". Eisenbahn-Revue International (in German) (8–9): 378. 2006. ISSN 1421-2811.
  4. ^ "Ausbau der Linie A verzögert sich". Süddeutsche Zeitung (in German). 22 December 2011. Retrieved 31 March 2013.
  5. ^ "Ausbau der Lokalbahnlinie Dachau-Altomünster verzögert sich weiter". Münchner Merkur (in German). 24 September 2010. Retrieved 21 December 2014.
  6. ^ "Deutschland-München: Fahrleitungsbauarbeiten: Works 2013/S 219-381966". Supplement to the Official Journal of the European Union. 12 November 2013. Retrieved 21 December 2014.
  7. ^ "Ausbau der Lokalbahn soll Ende 2012 abgeschlossen sein". Münchner Merkur (in German). 23 October 2009. Retrieved 21 December 2014.
  8. ^ "Ein Kraftakt". Süddeutschen Zeitung (in German). Retrieved 21 December 2014.
  9. ^ (in German). Münchner Verkehrs- und Tarifverbund. Archived from the original on 14 October 2013. Retrieved 31 March 2013.

dachau, altomünster, railway, this, article, needs, additional, citations, verification, please, help, improve, this, article, adding, citations, reliable, sources, unsourced, material, challenged, removed, find, sources, news, newspapers, books, scholar, jsto. This article needs additional citations for verification Please help improve this article by adding citations to reliable sources Unsourced material may be challenged and removed Find sources Dachau Altomunster railway news newspapers books scholar JSTOR October 2023 Learn how and when to remove this template message The Dachau Altomunster railway also called the Bummerl Bockerl or Ludwig Thoma Railway is a railway in the German state of Bavaria It is part of the Munich S Bahn network and is integrated within the Munchner Verkehrs und Tarifverbund Munich Transport and Tariff Association MVV as line S2 The branch line connects the town of Dachau on the Munich Treuchtlingen railway with Altomunster Markt Indersdorf is an important stop Until its electrification in 2014 it was the only non electrified line of the Munich S Bahn and was designated as line A Dachau AltomunsterOverviewLine number5502LocaleBavariaServiceRoute number999 2 999 30 until 2014 TechnicalLine length29 9 km 18 6 mi Track gauge1 435 mm 4 ft 8 1 2 in standard gaugeElectrification15 kV 16 7 Hz AC overhead catenaryRoute mapLegendkm elevfrom Munich0 0 Dachau BahnhofAmperto Ingolstadtfrom paper mill1 4 Dachau Stadt4 1 Breitenau6 0 Bachern since 2014 6 4 Bachern until 2014 8 3 from Oberbachern substation9 1 Schwabhausen b Dachau 496 m12 2 Niederroth16 3 Markt Indersdorf 470 m19 1 Arnbach22 5 Erdweg 475 mGlonn25 7 Kleinberghofen28 6 Stumpfenbach29 9 Altomunster 494 mSource German railway atlas 1 History edit nbsp S Bahn line A with class 628 train to Altomunster nbsp Schwabhausen b Dachau station building 2013At the beginning of the year 1900 it was decided to build a railway line from the Munich Ingolstadt line now part of the Nuremberg Munich high speed line for the development of the hinterland of Dachau There were two option for the route connecting Altomunster via Schwabhausen and Erdweg from Dachau station or connecting Markt Indersdorf from Hebertshausen The respective municipalities could not agree on one or other the routes and so came to a compromise This compromise is reflected in the present route First it runs west to Schwabhausen then continues north to Indersdorf and turns back to the southwest to run up the Glonn valley to Erdweg From there the line heads back to the northwest to Altomunster This means that the line takes 29 9 kilometres between Dachau and Altomunster which are about 20 kilometres apart in a direct line The first section from Dachau to Indersdorf was opened on 8 July 1912 and the whole line to Altomunster was commissioned as the Dachauer Lokalbahn on 18 December 1913 At the time of the Bavarian Soviet Republic the local railway was an important economic factor for the revolutionary government The money printed in the paper mill in Dachau could be transported directly to Munich without substantial detours Since the establishment of the MVV the whole line has been integrated in the MVV s system of fares It was formerly served by local trains operated with push pull trains trains made up of yl and Silberling carriage hauled by locomotives of class 211 and later 212 In 1995 the still non electrified railway was included as line A of the Munich S Bahn In the 2000s planning began for the electrification of the suburban railway line The estimated cost in 2005 was 32 million 2 The planning agreement for electrification was signed at the end of June 2006 3 Originally the construction was to begin in 2012 with completion scheduled for 2013 4 but the work was repeatedly postponed 5 Final planning approval was issued in January 2013 In mid November 2013 the contract for the electrification of the line was estimated to be worth 8 million As part of the European tender five bids were received 6 The final cost estimate was 47 million 7 From April 28 to 13 December 2014 the line was completely closed for the construction work The S Bahn line was continuously electrified and a passing loop was installed between Bachem and Schwabhausen A crossing loop was installed at Erdweg station and the existing crossing loop at Markt Indersdorf station was removed 8 This made services at 30 minute intervals possible 9 There were delays in the construction and the railway could not be opened for operations as planned on 17 November but services resumed at the timetable change on 14 December 2014 Operations edit nbsp Class 628 DMU of line A near SchwabhausenUntil April 2014 services on line A ran hourly from Dachau to Altomunster In the peak hour a service ran through to Munich Central Station Hauptbahnhof The line was operated with class 628 diesel multiple units On 27 April 2014 DB suspended operations for the electrification of the line The rail service between Dachau and Altomuenster was replaced by buses until December 2014 On 14 December 2014 the electrical services of line S2 commenced on the line The service was increased from 38 to 57 pairs of trains 39 pairs of trains run every hour directly from Altomunster to Munich with some continuing to Markt Schwaben and Erding in the peak hour These services combine in Dachau with the S2 services between Peterhausen and Markt Schwaben These trains are operated with class 423 four car electrical multiple units of the S Bahn The remaining pairs of trains run only between Altomunster and Dachau and contribute to a 30 minute interval service during the peak hour The additional trains are operated with class 420 four car electrical multiple units restoring this class to the Munich S Bahn network The formerly rather brisk freight transport for agricultural products cereals milk cattle coal building materials animal feed and fertilisers mostly ended before the reconstruction of the line in 1982 References edit Eisenbahnatlas Deutschland German railway atlas in German Schweers Wall 2009 pp 107 166 ISBN 978 3 89494 139 0 Bayern kampft um Bundesmittel fur Ausbauten im Schienennetz Eisenbahn Revue International in German 5 242 f 2005 ISSN 1421 2811 S Bahn Munchen wird ausgebaut Eisenbahn Revue International in German 8 9 378 2006 ISSN 1421 2811 Ausbau der Linie A verzogert sich Suddeutsche Zeitung in German 22 December 2011 Retrieved 31 March 2013 Ausbau der Lokalbahnlinie Dachau Altomunster verzogert sich weiter Munchner Merkur in German 24 September 2010 Retrieved 21 December 2014 Deutschland Munchen Fahrleitungsbauarbeiten Works 2013 S 219 381966 Supplement to the Official Journal of the European Union 12 November 2013 Retrieved 21 December 2014 Ausbau der Lokalbahn soll Ende 2012 abgeschlossen sein Munchner Merkur in German 23 October 2009 Retrieved 21 December 2014 Ein Kraftakt Suddeutschen Zeitung in German Retrieved 21 December 2014 Die S Bahn das Ruckgrat des OPNV in der Region Ausbau Linie A in German Munchner Verkehrs und Tarifverbund Archived from the original on 14 October 2013 Retrieved 31 March 2013 Retrieved from https en wikipedia org w index php title Dachau Altomunster railway amp oldid 1181624071, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.