Cibitung–Cilincing Toll Road

Cibitung-Cilincing Toll Road is a 34-kilometre-long (21 mi) toll road which extends from Cibitung, West Java, to Cilincing, Jakarta in Indonesia. This is one of the toll roads which are part of the Jakarta Outer Ring Road 2.[1] This toll road is expected to reduce the burden of freight and vehicle transportation on the Jakarta–Cikampek Toll Road that crosses the Cawang area.[2][3]

Cibitung-Cilincing Toll Road
Route information
Maintained by PT Cibitung Tanjung Priok Port Tollways (CTP)
Length34 km (21 mi)
Existed2021–present
Major junctions
Southeast endCibitung
Major intersections
Northwest endCilincing
Location
CountryIndonesia
Provinces
Major cities
Highway system

History edit

The toll road consists of four sections. Construction of this toll road has been delayed by eight years due to land acquisition problems. The toll road was expected to be operational by 2019.[4][5] The first section of the toll road has been operating since 31 July 2021,[6] followed by the inaugurations of sections 2 and 3 on 20 September 2022.[7]

Sections edit

Section

Route

Length

Inauguration Date

Section 1 Cibitung–Telaga Asih 2.96 km (1.84 mi) 31 July 2021
Section 2 Telaga Asih–Tambelang 9.41 km (5.85 mi) 20 September 2022
Section 3 Tambelang–Mekarjaya 13.09 km (8.13 mi)
Section 4 Mekarjaya–Cilincing 8.56 km (5.32 mi) 1 April 2023

Exits edit

 
Marunda Toll Gate
ProvinceLocationkmmiExitNameDestinationsNotes
West JavaWest Cikarang, Bekasi Regency0.00.0  Cimanggis–Cibitung Toll Road (Under construction)
0.00.00Cibitung Interchange
2.21.42Telaga Asih Toll Gate
  • Cibitung
  • Telaga Asih
North Tambun, Bekasi Regency12.27.612Gabus Toll Gate
  • North Tambun
  • Tambelang
Small vehicles only
Tarumajaya, Bekasi Regency27.016.827Tarumajaya Toll Gate
  • Tarumajaya
  • Babelan
  • Marunda
28.617.8Marunda Toll Gate
DKI JakartaCilincing, North Jakarta342134Semper Interchange
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also edit

References edit

  1. ^ "Waskita Pastikan Tol Cibitung-Cilincing Beroperasi Tahun Depan". Kompas. Retrieved October 2, 2018.
  2. ^ "Economy in brief: Cibitung-Cilincing toll-road project to start 2016". The Jakarta Post. Retrieved October 2, 2018.
  3. ^ "Pelindo II to Buy 45% of Cibitung-Cilincing Toll Road". Jakarta Globe. Retrieved October 2, 2018.
  4. ^ "Waskita Karya Kempit 55% Saham Jalan Tol Cibitung-Cilincing". CNN Indonesia. Retrieved October 2, 2018.
  5. ^ "Agar Arus Logistik Lancar, Truk Butuh jalan Tol Baru". Industri.Bisnis.Com. Retrieved October 2, 2018.
  6. ^ "BEROPERASI & BELUM BERTARIF, SEKSI 1 TOL CIBITUNG - CILINCING RUAS CIBITUNG - TELAGA ASIH". bpjt.pu.go.id (in Indonesian). Badan Pengatur Jalan Tol. 31 July 2022. Retrieved 13 October 2022.
  7. ^ "Tingkatkan Mobilitas Logistik, Presiden Jokowi Resmikan Jalan Tol Cibitung-Cilincing dan Tol Serpong-Balaraja Seksi 1" [Improving Logistics Mobility, President Jokowi Inaugurates Cibitung-Cilincing Toll Road and Serpong-Balaraja Toll Road Section 1]. bpjt.pu.go.id (in Indonesian). Badan Pengatur Jalan Tol. 21 September 2022. Retrieved 28 September 2022.

External links edit

  • Cibitung Tanjung Priok Port Tollways website

cibitung, cilincing, toll, road, cibitung, cilincing, toll, road, kilometre, long, toll, road, which, extends, from, cibitung, west, java, cilincing, jakarta, indonesia, this, toll, roads, which, part, jakarta, outer, ring, road, this, toll, road, expected, re. Cibitung Cilincing Toll Road is a 34 kilometre long 21 mi toll road which extends from Cibitung West Java to Cilincing Jakarta in Indonesia This is one of the toll roads which are part of the Jakarta Outer Ring Road 2 1 This toll road is expected to reduce the burden of freight and vehicle transportation on the Jakarta Cikampek Toll Road that crosses the Cawang area 2 3 Cibitung Cilincing Toll RoadRoute informationMaintained by PT Cibitung Tanjung Priok Port Tollways CTP Length34 km 21 mi Existed2021 presentMajor junctionsSoutheast endCibitungMajor intersectionsJakarta Cikampek Toll RoadCimanggis Cibitung Toll RoadTanjung Priok Access Toll RoadNorthwest endCilincingLocationCountryIndonesiaProvincesWest JavaDKI JakartaMajor citiesBekasi RegencyNorth JakartaHighway systemTransport in Indonesia Contents 1 History 2 Sections 3 Exits 4 See also 5 References 6 External linksHistory editThe toll road consists of four sections Construction of this toll road has been delayed by eight years due to land acquisition problems The toll road was expected to be operational by 2019 4 5 The first section of the toll road has been operating since 31 July 2021 6 followed by the inaugurations of sections 2 and 3 on 20 September 2022 7 Sections editSection Route Length Inauguration Date Section 1 Cibitung Telaga Asih 2 96 km 1 84 mi 31 July 2021 Section 2 Telaga Asih Tambelang 9 41 km 5 85 mi 20 September 2022 Section 3 Tambelang Mekarjaya 13 09 km 8 13 mi Section 4 Mekarjaya Cilincing 8 56 km 5 32 mi 1 April 2023Exits edit nbsp Marunda Toll Gate ProvinceLocationkmmiExitNameDestinationsNotes West JavaWest Cikarang Bekasi Regency0 00 0 nbsp Cimanggis Cibitung Toll Road Under construction 0 00 00Cibitung Interchange nbsp Jakarta Cikampek Toll RoadEastboundCikarangCikampekBandungWestboundTambunBekasiJakarta 2 21 42Telaga Asih Toll GateCibitungTelaga Asih North Tambun Bekasi Regency12 27 612Gabus Toll GateNorth TambunTambelangSmall vehicles only Tarumajaya Bekasi Regency27 016 827Tarumajaya Toll GateTarumajayaBabelanMarunda 28 617 8Marunda Toll Gate DKI JakartaCilincing North Jakarta342134Semper Interchange nbsp Jakarta Outer Ring RoadNorthboundSemper nbsp Tanjung Priok Access Toll Road nbsp Port of Tanjung Priok nbsp Soekarno Hatta International AirportSouthboundCakungBintara nbsp Jagorawi Toll Road 1 000 mi 1 609 km 1 000 km 0 621 mi Electronic toll collection Route transition UnopenedSee also edit nbsp Jakarta portal nbsp Indonesia portal Trans Java toll roadReferences edit Waskita Pastikan Tol Cibitung Cilincing Beroperasi Tahun Depan Kompas Retrieved October 2 2018 Economy in brief Cibitung Cilincing toll road project to start 2016 The Jakarta Post Retrieved October 2 2018 Pelindo II to Buy 45 of Cibitung Cilincing Toll Road Jakarta Globe Retrieved October 2 2018 Waskita Karya Kempit 55 Saham Jalan Tol Cibitung Cilincing CNN Indonesia Retrieved October 2 2018 Agar Arus Logistik Lancar Truk Butuh jalan Tol Baru Industri Bisnis Com Retrieved October 2 2018 BEROPERASI amp BELUM BERTARIF SEKSI 1 TOL CIBITUNG CILINCING RUAS CIBITUNG TELAGA ASIH bpjt pu go id in Indonesian Badan Pengatur Jalan Tol 31 July 2022 Retrieved 13 October 2022 Tingkatkan Mobilitas Logistik Presiden Jokowi Resmikan Jalan Tol Cibitung Cilincing dan Tol Serpong Balaraja Seksi 1 Improving Logistics Mobility President Jokowi Inaugurates Cibitung Cilincing Toll Road and Serpong Balaraja Toll Road Section 1 bpjt pu go id in Indonesian Badan Pengatur Jalan Tol 21 September 2022 Retrieved 28 September 2022 External links editCibitung Tanjung Priok Port Tollways website nbsp This Indonesian road or road transport related article is a stub You can help Wikipedia by expanding it vte Retrieved from https en wikipedia org w index php title Cibitung Cilincing Toll Road amp oldid 1223483783, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.