Chard Canal

The Chard Canal was a 13.5 miles (21.7 km) tub boat canal in Somerset, England, that ran from the Bridgwater and Taunton Canal at Creech St. Michael, over four aqueducts, through three tunnels and four inclined planes to Chard. It was completed in 1842, was never commercially viable, and closed in 1868. The major engineering features are still clearly visible in the landscape.

Chard Canal
The Chard Canal near Lillesdon, Somerset
Specifications
Locks1
(4 inclined planes)
StatusDerelict
History
Original ownerAshton Canal Co
Principal engineerJames Green
Other engineer(s)Sydney Hall
Date of act1834
Date completed1842
Date closed1868
Geography
Start pointChard
End pointBridgwater
Connects toBridgwater and Taunton Canal
Chard Canal
Bridgwater and Taunton Canal
Railway aqueduct
River Tone aqueduct
Ruishton aqueduct
Lower Farm bridge, Thornfalcon
Thornfalcon Plane
Lillesdon Tunnel
A378 Wrantage Aqueduct
Wrantage Plane
Crimson Hill Tunnel (1800 yd)
Ilminster Wharf
Ilminster Plane
Ilminster Tunnel (300 yd)
Bere Mills Lock
Chard Plane
Chard Resr feeder
Chard Basin

Precursors

Prior to the construction of the canal, there had been several plans over the previous 50 years to build a ship canal from the Bristol Channel to the English Channel, in order to avoid the route around Cornwall and Devon. The first which would have connected Chard to the canal network was a scheme surveyed in 1769 by Robert Whitworth, to link the River Parrett to Seaton in Devon. Whitworth was asked to reassess this route in the early 1790s, and again thought it was feasible. The plan was revived in 1793, while another route was suggested in 1794 by Josiah Easton, again passing through Chard.[1]

The 1793 Chard Canal plan was revived in 1809, by now renamed as the English and Bristol Channels Canal, and the engineer John Rennie was asked to survey it in 1810. He advocated a small ship canal, suitable for vessels up to 120 tons. The cost of a barge canal had been estimated at £70,000, but Rennie's estimate for a ship canal was £1.33M.[2]

One further attempt to build a ship canal took place in 1825, when a canal capable of taking vessels of 200 tons, with a draught of 15 feet (4.6 m) was proposed. 30 locks would have been required, on a canal from Stolford on the Bristol Channel to Beer on the English Channel, passing through Creech St Michael, Ilminster and Chard, at an estimated cost of £1.7M. Thomas Telford produced the survey, an Act of Parliament was obtained on 6 July 1825, and although subscriptions of over £1.5M were promised, no further action occurred, with the Company disappearing after 1828.[3]

History

With the Bridgwater and Taunton Canal having opened in 1827, there was further initiative to link Chard to it, and James Green carried out a survey in 1831. The route was 13.5 miles (21.7 km) long, but with Chard some 231 feet (70 m) higher than the canal at Creech St Michael, his plan involved two boat lifts, two inclined planes and two tunnels, and was costed at £57,000. An Act of Parliament was obtained in June 1834, authorising the raising of £57,000, with an additional £20,000 if required, but local enthusiasm for the scheme was muted, and most of the capital was provided by just five men, all of whom were involved in the Bridgwater and Taunton Canal.

Work began at Wrantage in June 1835, but the Act did not allow parts of the canal to be built until tunnelling was well-advanced, and so work on the upper sections did not start until Autumn 1837.[4] Green was replaced as engineer by Sydney Hall from the start of construction, and in view of the problems Green was experiencing on the Grand Western Canal with commissioning his boat lifts, Hall decided to replace the lifts with inclined planes instead.[5][6]

Further changes to the original plans were made above Ilminster inclined plane, where another tunnel was constructed, enabling the line of the canal to be built at a lower level. A lock was added at Bere Mills, to raise the line by 7 feet (2.1 m) and the length of the Chard incline was increased. Construction costs were much higher than anticipated, and another Act of Parliament was obtained in March 1840, allowing the Company to raise another £80,000 in shares, and to obtain a mortgage for £26,000, while a third Act in 1841 allowed construction to continue beyond the original seven year limit. The canal opened to Ilminster on 15 May 1841, and to Dowlish Ford wharfs on 3 February 1842.

There were delays caused by the rope on the Wrantage plane breaking, resulting in damage to the caissons, and further delays caused by the Bristol and Exeter Railway constructing their line under the canal at Creech, but the work was finally completed on 24 May 1842. There were immediate benefits to the community, as coal prices fell, but the total cost of construction had been about £140,000, and as income was only a third of what had been projected, the canal company was never able to meet even the interest payments on its debts.[7]

Operation

The canal was designed for tub-boats which were 26 by 6.5 feet (7.9 by 2.0 m). The inclines at Thornfalcon, Wrantage and Ilminster were double-acting inclines, consisting of two parallel tracks, each containing a six-wheeled caisson, in which the boats floated. A chain linked the two caissons together, passing round a horizontal drum situated at the top of the incline. Power for the movement of the boats was provided by over-filling the top caisson, the extra weight causing that caisson to descend and the other to rise. Because the majority of traffic passed up the canal, and a boat displaces its own weight in water (Archimedes' principle), considerably more water passed down the incline than up it. However, the system was still more economical than using locks, and a large new Chard Reservoir supplied the necessary water.

The incline at Chard Common was quite different, consisting of a single track, with the tub-boats being carried on a cradle with four wheels. Power was supplied by a Whitelaw and Stirrat water turbine, with a 25-foot (7.6 m) head, which used 725 cubic feet (20.5 m3) of water per minute.[8] Boats were raised 86 feet (26 m) in a wheeled cradle up a slope of 1:10.[9] The cradle was attached to the turbine by a substantial wire rope, after breakages of the original rope. The Ilminster tunnel was 14 feet (4.3 m) wide, allowing boats travelling in opposite directions to pass, but the tunnels at Lillesdon and Crimson Hill were only wide enough for one boat.[8] However the Crimson Hill Tunnel has a double width "passing area" about halfway through its course to allow passing of the boats from either direction.

The main cargoes were coal and stone. Traffic for the first three years rose from 25,835 tons to 33,284 tons, about two thirds of which was coal or culm (anthracite). Competition started immediately, with the railway arriving at Taunton in 1842, and the Westport Canal being completed in 1840. Attempts were made to convert the canal to a railway, and an Act of Parliament obtained in 1847 changed the name of the Company to the Chard Railway Company, but successive plans were thwarted by the inability of the Company to repay its debts.

The canal went into receivership in 1853, after which there were discussions with the Bristol and Exeter Railway and the London and South Western Railway, with a view to building a branch to Chard. A new Chard Railway Company was constituted in 1860, and another Company was formed in 1861, to construct a branch from Taunton to Chard. The London and South Western Railway took over the Chard Railway, and the Bristol and Exeter built the branch from Taunton to Chard.

In order to prevent competition from the L&SWR, the Bristol and Exeter Railway bought the Grand Western Canal, the Bridgwater and Taunton Canal and the Chard Canal, so that the L&SWR could not. They paid £5,945 for the Chard Canal, with the takeover and closing of the canal being authorised by an Act of Parliament obtained in 1867. The receivers were discharged in February 1868, and it seems likely that the canal was closed then.[10]

Remains

 
The canal aqueduct at Wrantage now supports farm buildings

The Chard reservoir, which was the main supply for the canal, was sold to Lord Poulett. In 1990, South Somerset District Council bought it, and it is now a designated nature reserve. Surrounded by woodland, it provides habitat for over 150 species of birds.[11] The remains of the inclines have survived over 140 years of neglect, as have the three tunnels. Near Lower Farm, a bridge on the Thornfalcon to Creech road is now a grade II listed structure,[12] and the three-arched aqueduct which carried the canal over the River Tone is largely intact, although it no longer has its parapets.[13]

During World War II part of the Taunton Stop Line invasion defence project ran along the canal.

Co-ordinates

Map all coordinates using: OpenStreetMap 
Download coordinates as: KML

See also

Bibliography

  • Dunning, Robert (1983). A History of Somerset. Chichester: Phillimore & Co. ISBN 978-0-85033-461-6.
  • Hadfield, Charles (1967). The Canals of South West England. David and Charles. ISBN 978-0-7153-4176-6.
  • Otter, R.A. (1994). Civil Engineering Heritage: Southern England. London: Thomas Telford Ltd. ISBN 978-0-7277-1971-3.
  • Russell, Ronald (1971). Lost canals of England and Wales. David and Charles. ISBN 978-0-7153-5417-9.

References

  1. ^ Hadfield 1967, pp. 37–38
  2. ^ Hadfield 1967, pp. 38–39
  3. ^ Hadfield 1967, pp. 41–45
  4. ^ Hadfield 1967, pp. 66–68
  5. ^ Russell 1971, p. 68
  6. ^ Dunning 1983
  7. ^ Hadfield 1967, pp. 68–72
  8. ^ a b Hadfield 1967, p. 71
  9. ^ Otter 1994, p. 104
  10. ^ Hadfield 1967, pp. 72–75
  11. ^ . Chard Town Council. Archived from the original on 7 March 2012. Retrieved 10 August 2011.
  12. ^ Historic England. "Canal Bridge, Thornfalcon (1342043)". National Heritage List for England. Retrieved 10 August 2011.
  13. ^ Russell 1971, p. 70

External links

  Media related to Chard Canal at Wikimedia Commons

  • Index to photographs Somerset County Council's Historic Environment Record
  • "Photos of the remains of the inclines". from the original on 27 April 2019.

chard, canal, miles, boat, canal, somerset, england, that, from, bridgwater, taunton, canal, creech, michael, over, four, aqueducts, through, three, tunnels, four, inclined, planes, chard, completed, 1842, never, commercially, viable, closed, 1868, major, engi. The Chard Canal was a 13 5 miles 21 7 km tub boat canal in Somerset England that ran from the Bridgwater and Taunton Canal at Creech St Michael over four aqueducts through three tunnels and four inclined planes to Chard It was completed in 1842 was never commercially viable and closed in 1868 The major engineering features are still clearly visible in the landscape Chard CanalThe Chard Canal near Lillesdon SomersetSpecificationsLocks1 4 inclined planes StatusDerelictHistoryOriginal ownerAshton Canal CoPrincipal engineerJames GreenOther engineer s Sydney HallDate of act1834Date completed1842Date closed1868GeographyStart pointChardEnd pointBridgwaterConnects toBridgwater and Taunton CanalvteChard CanalLegendBridgwater and Taunton CanalRailway aqueductRiver Tone aqueductRuishton aqueductLower Farm bridge ThornfalconThornfalcon PlaneLillesdon TunnelA378 Wrantage AqueductWrantage PlaneCrimson Hill Tunnel 1800 yd Ilminster WharfIlminster PlaneIlminster Tunnel 300 yd Bere Mills LockChard PlaneChard Resr feederChard Basin Contents 1 Precursors 2 History 3 Operation 4 Remains 5 Co ordinates 6 See also 7 Bibliography 7 1 References 8 External linksPrecursors EditPrior to the construction of the canal there had been several plans over the previous 50 years to build a ship canal from the Bristol Channel to the English Channel in order to avoid the route around Cornwall and Devon The first which would have connected Chard to the canal network was a scheme surveyed in 1769 by Robert Whitworth to link the River Parrett to Seaton in Devon Whitworth was asked to reassess this route in the early 1790s and again thought it was feasible The plan was revived in 1793 while another route was suggested in 1794 by Josiah Easton again passing through Chard 1 The 1793 Chard Canal plan was revived in 1809 by now renamed as the English and Bristol Channels Canal and the engineer John Rennie was asked to survey it in 1810 He advocated a small ship canal suitable for vessels up to 120 tons The cost of a barge canal had been estimated at 70 000 but Rennie s estimate for a ship canal was 1 33M 2 One further attempt to build a ship canal took place in 1825 when a canal capable of taking vessels of 200 tons with a draught of 15 feet 4 6 m was proposed 30 locks would have been required on a canal from Stolford on the Bristol Channel to Beer on the English Channel passing through Creech St Michael Ilminster and Chard at an estimated cost of 1 7M Thomas Telford produced the survey an Act of Parliament was obtained on 6 July 1825 and although subscriptions of over 1 5M were promised no further action occurred with the Company disappearing after 1828 3 History EditWith the Bridgwater and Taunton Canal having opened in 1827 there was further initiative to link Chard to it and James Green carried out a survey in 1831 The route was 13 5 miles 21 7 km long but with Chard some 231 feet 70 m higher than the canal at Creech St Michael his plan involved two boat lifts two inclined planes and two tunnels and was costed at 57 000 An Act of Parliament was obtained in June 1834 authorising the raising of 57 000 with an additional 20 000 if required but local enthusiasm for the scheme was muted and most of the capital was provided by just five men all of whom were involved in the Bridgwater and Taunton Canal Work began at Wrantage in June 1835 but the Act did not allow parts of the canal to be built until tunnelling was well advanced and so work on the upper sections did not start until Autumn 1837 4 Green was replaced as engineer by Sydney Hall from the start of construction and in view of the problems Green was experiencing on the Grand Western Canal with commissioning his boat lifts Hall decided to replace the lifts with inclined planes instead 5 6 Further changes to the original plans were made above Ilminster inclined plane where another tunnel was constructed enabling the line of the canal to be built at a lower level A lock was added at Bere Mills to raise the line by 7 feet 2 1 m and the length of the Chard incline was increased Construction costs were much higher than anticipated and another Act of Parliament was obtained in March 1840 allowing the Company to raise another 80 000 in shares and to obtain a mortgage for 26 000 while a third Act in 1841 allowed construction to continue beyond the original seven year limit The canal opened to Ilminster on 15 May 1841 and to Dowlish Ford wharfs on 3 February 1842 There were delays caused by the rope on the Wrantage plane breaking resulting in damage to the caissons and further delays caused by the Bristol and Exeter Railway constructing their line under the canal at Creech but the work was finally completed on 24 May 1842 There were immediate benefits to the community as coal prices fell but the total cost of construction had been about 140 000 and as income was only a third of what had been projected the canal company was never able to meet even the interest payments on its debts 7 Operation EditThe canal was designed for tub boats which were 26 by 6 5 feet 7 9 by 2 0 m The inclines at Thornfalcon Wrantage and Ilminster were double acting inclines consisting of two parallel tracks each containing a six wheeled caisson in which the boats floated A chain linked the two caissons together passing round a horizontal drum situated at the top of the incline Power for the movement of the boats was provided by over filling the top caisson the extra weight causing that caisson to descend and the other to rise Because the majority of traffic passed up the canal and a boat displaces its own weight in water Archimedes principle considerably more water passed down the incline than up it However the system was still more economical than using locks and a large new Chard Reservoir supplied the necessary water The incline at Chard Common was quite different consisting of a single track with the tub boats being carried on a cradle with four wheels Power was supplied by a Whitelaw and Stirrat water turbine with a 25 foot 7 6 m head which used 725 cubic feet 20 5 m3 of water per minute 8 Boats were raised 86 feet 26 m in a wheeled cradle up a slope of 1 10 9 The cradle was attached to the turbine by a substantial wire rope after breakages of the original rope The Ilminster tunnel was 14 feet 4 3 m wide allowing boats travelling in opposite directions to pass but the tunnels at Lillesdon and Crimson Hill were only wide enough for one boat 8 However the Crimson Hill Tunnel has a double width passing area about halfway through its course to allow passing of the boats from either direction The main cargoes were coal and stone Traffic for the first three years rose from 25 835 tons to 33 284 tons about two thirds of which was coal or culm anthracite Competition started immediately with the railway arriving at Taunton in 1842 and the Westport Canal being completed in 1840 Attempts were made to convert the canal to a railway and an Act of Parliament obtained in 1847 changed the name of the Company to the Chard Railway Company but successive plans were thwarted by the inability of the Company to repay its debts The canal went into receivership in 1853 after which there were discussions with the Bristol and Exeter Railway and the London and South Western Railway with a view to building a branch to Chard A new Chard Railway Company was constituted in 1860 and another Company was formed in 1861 to construct a branch from Taunton to Chard The London and South Western Railway took over the Chard Railway and the Bristol and Exeter built the branch from Taunton to Chard In order to prevent competition from the L amp SWR the Bristol and Exeter Railway bought the Grand Western Canal the Bridgwater and Taunton Canal and the Chard Canal so that the L amp SWR could not They paid 5 945 for the Chard Canal with the takeover and closing of the canal being authorised by an Act of Parliament obtained in 1867 The receivers were discharged in February 1868 and it seems likely that the canal was closed then 10 Remains Edit The canal aqueduct at Wrantage now supports farm buildings The Chard reservoir which was the main supply for the canal was sold to Lord Poulett In 1990 South Somerset District Council bought it and it is now a designated nature reserve Surrounded by woodland it provides habitat for over 150 species of birds 11 The remains of the inclines have survived over 140 years of neglect as have the three tunnels Near Lower Farm a bridge on the Thornfalcon to Creech road is now a grade II listed structure 12 and the three arched aqueduct which carried the canal over the River Tone is largely intact although it no longer has its parapets 13 During World War II part of the Taunton Stop Line invasion defence project ran along the canal Co ordinates EditMap all coordinates using OpenStreetMap Download coordinates as KMLPoint Coordinates Links to map resources OS Grid Ref NotesTaunton Junction 51 01 30 N 3 02 31 W 51 025 N 3 042 W 51 025 3 042 Taunton Junction ST269256 Junction with Bridgwater and Taunton CanalRuishton Aqueduct 51 01 12 N 3 02 24 W 51 020 N 3 040 W 51 020 3 040 Ruishton Aqueduct ST271250Thornfalcon Plane 51 00 43 N 3 01 34 W 51 012 N 3 026 W 51 012 3 026 Thornfalcon Plane ST280241 28 ft 8 5m counterbalanced caissonsLillesdon Tunnel 51 00 22 N 3 00 14 W 51 006 N 3 004 W 51 006 3 004 Lillesdon Tunnel ST296234 314 yd 287m Wrantage Aqueduct 50 59 53 N 2 59 13 W 50 998 N 2 987 W 50 998 2 987 Wrantage Aqueduct ST308225Wrantage Plane 50 59 38 N 2 59 02 W 50 994 N 2 984 W 50 994 2 984 Wrantage Plane ST310220 27 5 ft 8 4m counterbalanced caissonsCrimson Hill Tunnel N 50 59 42 N 2 58 30 W 50 995 N 2 975 W 50 995 2 975 Crimson Hill Tunnel N ST316221 1800 yd 1 6km Crimson Hill Tunnel S 50 58 55 N 2 57 50 W 50 982 N 2 964 W 50 982 2 964 Crimson Hill Tunnel S ST324207 1800 yd 1 6km Ilminster Plane 50 55 26 N 2 55 01 W 50 924 N 2 917 W 50 924 2 917 Ilminster Plane ST356142 82 5 ft 25 2m counterbalanced caissonsIlminster Tunnel 50 55 16 N 2 54 50 W 50 921 N 2 914 W 50 921 2 914 Ilminster Tunnel ST358138 300 yd 275m Bere Mills Lock 50 54 22 N 2 55 23 W 50 906 N 2 923 W 50 906 2 923 Bere Mills Lock ST351122 7 ft 2 1m riseChard Common Plane 50 53 10 N 2 56 13 W 50 886 N 2 937 W 50 886 2 937 Chard Common Plane ST340100 86 ft 26 2m single track carriageChard Basin 50 52 44 N 2 57 14 W 50 879 N 2 954 W 50 879 2 954 Chard Basin ST329092See also Edit United Kingdom portal Transport portalCanals of the United Kingdom History of the British canal systemBibliography EditDunning Robert 1983 A History of Somerset Chichester Phillimore amp Co ISBN 978 0 85033 461 6 Hadfield Charles 1967 The Canals of South West England David and Charles ISBN 978 0 7153 4176 6 Otter R A 1994 Civil Engineering Heritage Southern England London Thomas Telford Ltd ISBN 978 0 7277 1971 3 Russell Ronald 1971 Lost canals of England and Wales David and Charles ISBN 978 0 7153 5417 9 References Edit Hadfield 1967 pp 37 38 Hadfield 1967 pp 38 39 Hadfield 1967 pp 41 45 Hadfield 1967 pp 66 68 Russell 1971 p 68 Dunning 1983 Hadfield 1967 pp 68 72 a b Hadfield 1967 p 71 Otter 1994 p 104 Hadfield 1967 pp 72 75 Chard Reservoir Chard Town Council Archived from the original on 7 March 2012 Retrieved 10 August 2011 Historic England Canal Bridge Thornfalcon 1342043 National Heritage List for England Retrieved 10 August 2011 Russell 1971 p 70External links Edit Media related to Chard Canal at Wikimedia Commons Index to photographs Somerset County Council s Historic Environment Record Photos of the remains of the inclines Archived from the original on 27 April 2019 Retrieved from https en wikipedia org w index php title Chard Canal amp oldid 996997509, wikipedia, wiki, book, books, library,