The Bioceanic Corridor (Portuguese: Corredor Bioceânico; Spanish: Corredor Bioceánico) is a rail project between Brazil, Paraguay, Argentina, and Chile.[1][2] It is intended to join the port of Santos, Brazil, on the coast of the Atlantic Ocean, with the ports of Iquique and Antofagasta, Chile, on the coast of the Pacific Ocean.[3]

Project edit

In his trip to China in 2013, Bolivian president Evo Morales discussed with Chinese leader Xi Jinping the possibility of building a railway to link the Atlantic with the Pacific through Brazil and Peru. The Chinese president requested a study of feasibility by 2014.[4]

The Spanish narrow-gauge rail company FEVE was awarded a contract by the Bolivian government to prepare a technical feasibility study.[5] The first studies were prepared by Spanish, French, and Bolivian consultants and were to be delivered by June 2014.[6]

In August 2014, a mission from Bolivia sought financing from the Chinese government.[7][8]

The summit of the Union of South American Nations in December 2014 prioritised the project, along with seven other regional integration endeavors.[9]

The project contemplated four baseline studies: the basic engineering design, the market study, the strategic study, and the environmental study.[10] These were to be complete by 31 December 2014.[11]

Then-Bolivian minister of public works, services and housing, Vladimir Sánchez, stated that the first phase was to build the railroad; the second was to electrify it, and the third was to have a double-track railroad.[citation needed]

The project aims for 95% of trade from the south and north of Peru as well as integration with Brazil.[12]

Bi-Oceanic Corridor edit

 
The planned road between Brazil, Paraguay, Argentina, and Chile

In August 2017, a second expedition through parts of the route that have been completed took place, departing from Campo Grande and covering its entire length to the Chilean ports of Iquique and Antofagasta, the final stop. The route passed through four countries: Brazil, Paraguay, Argentina, and Chile. The first expedition traveled through Bolivia, to Chilean ports.[citation needed] The corridor was to be completed in 2022. Most of the work is to be carried out by Paraguay, which will need to pave more than 600 km of its highways, at the time still unpaved. The route is set to cover 2,400 km, between Campo Grande and Antofagasta.[13][14]

The project is intended to reduce travel time for exports from the midwest of Brazil to Asia and Oceania (China, Japan, India, Australia) by up to two weeks. With the route, part of Brazilian production, which currently leaves the country through the ports of Santos and Paranaguá, will be exported by Chilean ports at lower prices.[15]

In February 2022, Paraguay inaugurated 275 km of National Route 15 (about half of the route), connecting Carmelo Peralta (Alto Paraguay), on the border with Brazil, to Loma Plata (Boquerón), in the center of the country. [16]

See also edit

References edit

  1. ^ . La Razón. 20 October 2012. Archived from the original on 23 October 2014. Retrieved 27 October 2014.
  2. ^ . La Tercera. 21 October 2014. Archived from the original on 22 October 2014. Retrieved 27 October 2014.
  3. ^ . La República. 10 December 2013. Archived from the original on 5 November 2014. Retrieved 27 October 2014.
  4. ^ . La Paz: La Razón. 29 December 2013. Archived from the original on 1 January 2014. Retrieved 3 August 2015.
  5. ^ "Se iniciaron estudios para un corredor ferroviario bioceánico". El Día. 2 June 2014. Retrieved 27 October 2014.
  6. ^ "Corredor ferroviario que uniría a Brasil, Perú y Bolivia tendría un costo de US$10.000M". americaeconomia.com. 26 May 2012. Retrieved 27 October 2014.
  7. ^ "Gobierno boliviano gestiona corredor bioceánico que conectará Perú y Brasil". americaeconomia.com. 27 July 2012. Retrieved 27 October 2014.
  8. ^ . lostiempos.com. 6 August 2014. Archived from the original on 27 October 2014. Retrieved 27 October 2014.
  9. ^ . La Razón. 8 December 2014. Archived from the original on 19 December 2014. Retrieved 14 December 2014.
  10. ^ . La Razón. 25 May 2012. Archived from the original on 8 November 2014. Retrieved 27 October 2014.
  11. ^ . La Razón. 25 November 2014. Archived from the original on 17 December 2014. Retrieved 25 November 2014.
  12. ^ . La Razón. 22 October 2012. Archived from the original on 8 November 2014. Retrieved 27 October 2014.
  13. ^ Expedição percorre rota que encurta distâncias para exportações de MS
  14. ^ . Archived from the original on 17 January 2020. Retrieved 11 June 2020.
  15. ^ . Archived from the original on 23 February 2020. Retrieved 11 June 2020.
  16. ^ . Archived from the original on 6 August 2022. Retrieved 8 March 2022.

central, oceanic, railway, this, article, needs, updated, please, help, update, this, article, reflect, recent, events, newly, available, information, march, 2024, bioceanic, corridor, portuguese, corredor, bioceânico, spanish, corredor, bioceánico, rail, proj. This article needs to be updated Please help update this article to reflect recent events or newly available information March 2024 The Bioceanic Corridor Portuguese Corredor Bioceanico Spanish Corredor Bioceanico is a rail project between Brazil Paraguay Argentina and Chile 1 2 It is intended to join the port of Santos Brazil on the coast of the Atlantic Ocean with the ports of Iquique and Antofagasta Chile on the coast of the Pacific Ocean 3 Contents 1 Project 2 Bi Oceanic Corridor 3 See also 4 ReferencesProject editIn his trip to China in 2013 Bolivian president Evo Morales discussed with Chinese leader Xi Jinping the possibility of building a railway to link the Atlantic with the Pacific through Brazil and Peru The Chinese president requested a study of feasibility by 2014 4 The Spanish narrow gauge rail company FEVE was awarded a contract by the Bolivian government to prepare a technical feasibility study 5 The first studies were prepared by Spanish French and Bolivian consultants and were to be delivered by June 2014 6 In August 2014 a mission from Bolivia sought financing from the Chinese government 7 8 The summit of the Union of South American Nations in December 2014 prioritised the project along with seven other regional integration endeavors 9 The project contemplated four baseline studies the basic engineering design the market study the strategic study and the environmental study 10 These were to be complete by 31 December 2014 11 Then Bolivian minister of public works services and housing Vladimir Sanchez stated that the first phase was to build the railroad the second was to electrify it and the third was to have a double track railroad citation needed The project aims for 95 of trade from the south and north of Peru as well as integration with Brazil 12 Bi Oceanic Corridor edit nbsp The planned road between Brazil Paraguay Argentina and ChileIn August 2017 a second expedition through parts of the route that have been completed took place departing from Campo Grande and covering its entire length to the Chilean ports of Iquique and Antofagasta the final stop The route passed through four countries Brazil Paraguay Argentina and Chile The first expedition traveled through Bolivia to Chilean ports citation needed The corridor was to be completed in 2022 Most of the work is to be carried out by Paraguay which will need to pave more than 600 km of its highways at the time still unpaved The route is set to cover 2 400 km between Campo Grande and Antofagasta 13 14 The project is intended to reduce travel time for exports from the midwest of Brazil to Asia and Oceania China Japan India Australia by up to two weeks With the route part of Brazilian production which currently leaves the country through the ports of Santos and Paranagua will be exported by Chilean ports at lower prices 15 In February 2022 Paraguay inaugurated 275 km of National Route 15 about half of the route connecting Carmelo Peralta Alto Paraguay on the border with Brazil to Loma Plata Boqueron in the center of the country 16 See also editBrazil Peru railway Interoceanic Highway Rail transport in Bolivia Rail transport in BrazilReferences edit Evo ve jugada sucia de Peru en el proyecto del tren bioceanico La Razon 20 October 2012 Archived from the original on 23 October 2014 Retrieved 27 October 2014 Evo choca con Peru por ruta de Corredor Bioceanico La Tercera 21 October 2014 Archived from the original on 22 October 2014 Retrieved 27 October 2014 El ferrocarril que unira a Peru y Bolivia La Republica 10 December 2013 Archived from the original on 5 November 2014 Retrieved 27 October 2014 China pide estudio de construccion de tren interoceanico La Paz La Razon 29 December 2013 Archived from the original on 1 January 2014 Retrieved 3 August 2015 Se iniciaron estudios para un corredor ferroviario bioceanico El Dia 2 June 2014 Retrieved 27 October 2014 Corredor ferroviario que uniria a Brasil Peru y Bolivia tendria un costo de US 10 000M americaeconomia com 26 May 2012 Retrieved 27 October 2014 Gobierno boliviano gestiona corredor bioceanico que conectara Peru y Brasil americaeconomia com 27 July 2012 Retrieved 27 October 2014 Bolivia pedira ayuda a China para sacar adelante ruta ferroviaria bioceanica lostiempos com 6 August 2014 Archived from the original on 27 October 2014 Retrieved 27 October 2014 Unasur priorizara el corredor bioceanico que incluye a Bolivia La Razon 8 December 2014 Archived from the original on 19 December 2014 Retrieved 14 December 2014 Megaproyecto ferroviario apunta a exportar 95 de carga por Peru La Razon 25 May 2012 Archived from the original on 8 November 2014 Retrieved 27 October 2014 Bolivia concluira hasta fin de ano estudios para construir tren bioceanico Atlantico Pacifico La Razon 25 November 2014 Archived from the original on 17 December 2014 Retrieved 25 November 2014 Bolivia se entromete y busca gestionarse en China para que tenga una participacion en el proyecto de tren interoceanico Brasil Peru La Razon 22 October 2012 Archived from the original on 8 November 2014 Retrieved 27 October 2014 Expedicao percorre rota que encurta distancias para exportacoes de MS Cronograma da Rota Bioceanica segue com obras em ritmo acelerado no Paraguai Archived from the original on 17 January 2020 Retrieved 11 June 2020 Encontro do Corredor Bioceanico avanca em projetos turisticos culturais e comerciais Archived from the original on 23 February 2020 Retrieved 11 June 2020 Primer tramo del Corredor Bioceanico ya es una realidad que cambiara la historia del Chaco Archived from the original on 6 August 2022 Retrieved 8 March 2022 Retrieved from https en wikipedia org w index php title Central Bi Oceanic railway amp oldid 1214252045, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.