The Campos Novos Dam (also known as Barragem de Campos Novos locally) is a hydroelectric dam in the Santa Catarina state in southern Brazil. In 2006, at 200 metres (660 ft) dam height, it was regarded[who?] as the third highest[citation needed] dam of this type (concrete-faced rock fill dam or CFRD) in the world, but, in June 2006, the water which it held back ran out following a break in the dam wall.

Campos Novos Dam
Location of Campos Novos Dam in Brazil
Official nameBarragem de Campos Novos
LocationCampos Novos, SC, Brazil
Coordinates27°36′15″S 51°19′35″W / 27.60417°S 51.32639°W / -27.60417; -51.32639
Construction beganAugust 2001
Opening dateJuly 2006
Construction costUS$671 million
Operator(s)Enercan
Dam and spillways
Type of damRock-fill dam
ImpoundsCanoas River
Height202 m (663 ft)
Length600 m (2,000 ft)
Power Station
Installed capacity880 MW (1,180,000 hp)

Built at a cost of $671 million USD, it is located on the Canoas River, Brazil. It is part of a hydro-electric complex intended to provide 880 MW (1,180,000 hp). A second dam is below this one, and together they can hold a little more than 2 cubic kilometers of water.

Ownership and construction Edit

Campos Novos' 35 years build and operate concession was awarded in 1998. It is owned by Campos Novos Energia S.A. ("Enercan"), a consortium made up of Brazilian power company CPFL Energia (formerly Companhia Paulista de Força e Luz) with 48.7%, Brazilian aluminum maker Companhia Brasileira de Aluminio (CBA) with 22.7%, metallurgy company Companhia Niquel Tocantins (CNT) with 20%, state-controlled companies Companhia Estadual de Energia Elétrica [pt] (CEEE) with 6.5% and Centrais Elétricas de Santa Catarina S.A. ("Celesc") with 2%.

The dam builder was a consortium led by Brazilian construction company Camargo Corrêa and engineering consultants Engevix [pt]. Funding is by the Inter-American Development Bank and state-owned Brazilian Development Bank.

Cracks Edit

A major break caused the water to begin to run out, after a tunnel collapsed on 20 June 2006. The exact reasons for the cracking were unknown in July 2006, however it has been revealed that patches were begun on another tunnel in October 2005 before the recent tunnel failure.[1][2]

Since the dam failure, a full inquiry for the reasons behind the cracks has been done, and a time-line of the dam's progression towards failure has been completed.[3] Following this discovery, hidden by the partners of the project, it appeared that these companies had maltreated the local populations. An investigation into the human rights violations was launched by United Nations Organisation.[2]

Camargo Corrêa re-plugged the tunnels in November 2006 and the reservoir was refilled by 1 March 2007. The last of the three generators went on-line on 30 April 2007.

Gallery Edit

See also Edit

References Edit

  1. ^ Enormous new dam fails in Brazil, New Scientist, 2006-07-08
  2. ^ a b Giant cracks appear in new Brazilian dam 2008-08-22 at the Wayback Machine, Environment News Service, 2006-06-29
  3. ^ Inquiry and Timeline 2011-06-14 at the Wayback Machine

External links Edit

  • Engineering News Record

campos, novos, this, article, require, cleanup, meet, wikipedia, quality, standards, cleanup, reason, been, specified, please, help, improve, this, article, february, 2012, learn, when, remove, this, template, message, also, known, barragem, campos, novos, loc. This article may require cleanup to meet Wikipedia s quality standards No cleanup reason has been specified Please help improve this article if you can February 2012 Learn how and when to remove this template message The Campos Novos Dam also known as Barragem de Campos Novos locally is a hydroelectric dam in the Santa Catarina state in southern Brazil In 2006 at 200 metres 660 ft dam height it was regarded who as the third highest citation needed dam of this type concrete faced rock fill dam or CFRD in the world but in June 2006 the water which it held back ran out following a break in the dam wall Campos Novos DamLocation of Campos Novos Dam in BrazilOfficial nameBarragem de Campos NovosLocationCampos Novos SC BrazilCoordinates27 36 15 S 51 19 35 W 27 60417 S 51 32639 W 27 60417 51 32639Construction beganAugust 2001Opening dateJuly 2006Construction costUS 671 millionOperator s EnercanDam and spillwaysType of damRock fill damImpoundsCanoas RiverHeight202 m 663 ft Length600 m 2 000 ft Power StationInstalled capacity880 MW 1 180 000 hp Built at a cost of 671 million USD it is located on the Canoas River Brazil It is part of a hydro electric complex intended to provide 880 MW 1 180 000 hp A second dam is below this one and together they can hold a little more than 2 cubic kilometers of water Contents 1 Ownership and construction 2 Cracks 3 Gallery 4 See also 5 References 6 External linksOwnership and construction EditCampos Novos 35 years build and operate concession was awarded in 1998 It is owned by Campos Novos Energia S A Enercan a consortium made up of Brazilian power company CPFL Energia formerly Companhia Paulista de Forca e Luz with 48 7 Brazilian aluminum maker Companhia Brasileira de Aluminio CBA with 22 7 metallurgy company Companhia Niquel Tocantins CNT with 20 state controlled companies Companhia Estadual de Energia Eletrica pt CEEE with 6 5 and Centrais Eletricas de Santa Catarina S A Celesc with 2 The dam builder was a consortium led by Brazilian construction company Camargo Correa and engineering consultants Engevix pt Funding is by the Inter American Development Bank and state owned Brazilian Development Bank Cracks EditA major break caused the water to begin to run out after a tunnel collapsed on 20 June 2006 The exact reasons for the cracking were unknown in July 2006 however it has been revealed that patches were begun on another tunnel in October 2005 before the recent tunnel failure 1 2 Since the dam failure a full inquiry for the reasons behind the cracks has been done and a time line of the dam s progression towards failure has been completed 3 Following this discovery hidden by the partners of the project it appeared that these companies had maltreated the local populations An investigation into the human rights violations was launched by United Nations Organisation 2 Camargo Correa re plugged the tunnels in November 2006 and the reservoir was refilled by 1 March 2007 The last of the three generators went on line on 30 April 2007 Gallery Edit nbsp Detour of the Canoas River April 2005 nbsp 3 pipes on the left to the turbines 4 water outlets on the right April 2005 nbsp inside the future storage lake 3 months before damming nbsp storage lake March 2008 nbsp lower side of the power station March 2008 nbsp March 2008See also Edit nbsp Brazil portal nbsp Water portal nbsp Renewable energy portal List of hydroelectric power stations List of power stations in Brazil List of world s tallest damsReferences Edit Enormous new dam fails in Brazil New Scientist 2006 07 08 a b Giant cracks appear in new Brazilian dam Archived 2008 08 22 at the Wayback Machine Environment News Service 2006 06 29 Inquiry and Timeline Archived 2011 06 14 at the Wayback MachineExternal links EditEngineering News Record International Rivers Retrieved from https en wikipedia org w index php title Campos Novos Dam amp oldid 1074411223, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.