fbpx
Wikipedia

Brazilian submarine Tupi (S-30)

S Tupi (S-30) is the lead boat of the Tupi-class submarine of the Brazilian Navy.[2][3]

S Tupi
History
Brazil
NameTupi
NamesakeTupi
BuilderHowaldtswerke-Deutsche Werft
Laid down8 March 1985
Launched28 April 1987
Commissioned6 May 1989
IdentificationPennant number: S-30
StatusActive
General characteristics
Class and typeTupi-class submarine
Displacement
  • 1,170 t (1,150 long tons) surfaced
  • 1,460 t (1,440 long tons) submerged
Length61.2 m (200 ft 9 in)
Beam6.25 m (20 ft 6 in)
Draft5.5 m (18 ft 1 in)
Propulsion
Speed
  • 11 kn (20 kilometres per hour; 13 miles per hour) surfaced
  • 22 kn (41 km/h; 25 mph) submerged
Range
  • 11,000 nmi (20,000 km; 13,000 mi) at 19 km/h (10 kn) surfaced
  • 8,000 nmi (15,000 km; 9,200 mi) at 19 km/h (10 kn) snorkeling
  • 400 nmi (740 km; 460 mi) at 7 km/h (4 kn) submerged
Endurance50 days[1]
Test depth500 m (1,600 ft)
Complement30
Armament

Construction and career edit

The boat was built at Howaldtswerke-Deutsche Werft in Germany and was launched on 28 April 1987 and commissioned on 6 May 1989.

Gallery edit

References edit

  1. ^ "Type 209 Diesel-Electric Attack Submarine (1971)". Military Factory. 2016-04-14. from the original on 2016-09-18. Retrieved 2016-08-29.
  2. ^ Gardiner, Robert; Chumbley, Stephen; Budzbon, Przemysław (1995). Conway's All the World's Fighting Ships 1947–1995. Annapolis, Maryland: Naval Institute Press. ISBN 1-55750-132-7.
  3. ^ . www.webcitation.org. Archived from the original on 2021-08-11. Retrieved 2021-08-10.

External links edit

  Media related to S30 Tupi (submarine, 1989) at Wikimedia Commons


brazilian, submarine, tupi, tupi, lead, boat, tupi, class, submarine, brazilian, navy, tupihistorybrazilnametupinamesaketupibuilderhowaldtswerke, deutsche, werftlaid, down8, march, 1985launched28, april, 1987commissioned6, 1989identificationpennant, number, 30. S Tupi S 30 is the lead boat of the Tupi class submarine of the Brazilian Navy 2 3 S TupiHistoryBrazilNameTupiNamesakeTupiBuilderHowaldtswerke Deutsche WerftLaid down8 March 1985Launched28 April 1987Commissioned6 May 1989IdentificationPennant number S 30StatusActiveGeneral characteristicsClass and typeTupi class submarineDisplacement1 170 t 1 150 long tons surfaced 1 460 t 1 440 long tons submergedLength61 2 m 200 ft 9 in Beam6 25 m 20 ft 6 in Draft5 5 m 18 ft 1 in Propulsion4 diesel electric engines 1 shaft 4 500 kW 6 100 shp Speed11 kn 20 kilometres per hour 13 miles per hour surfaced 22 kn 41 km h 25 mph submergedRange11 000 nmi 20 000 km 13 000 mi at 19 km h 10 kn surfaced 8 000 nmi 15 000 km 9 200 mi at 19 km h 10 kn snorkeling 400 nmi 740 km 460 mi at 7 km h 4 kn submergedEndurance50 days 1 Test depth500 m 1 600 ft Complement30Armament8 21 in 533 mm torpedo tubes 14 torpedoes optional UGM 84 Harpoon integration Contents 1 Construction and career 2 Gallery 3 References 4 External linksConstruction and career editThe boat was built at Howaldtswerke Deutsche Werft in Germany and was launched on 28 April 1987 and commissioned on 6 May 1989 Gallery edit nbsp S Tupi during her sea trial in 1988 nbsp S Tupi on 11 December 2020References edit Type 209 Diesel Electric Attack Submarine 1971 Military Factory 2016 04 14 Archived from the original on 2016 09 18 Retrieved 2016 08 29 Gardiner Robert Chumbley Stephen Budzbon Przemyslaw 1995 Conway s All the World s Fighting Ships 1947 1995 Annapolis Maryland Naval Institute Press ISBN 1 55750 132 7 S Tupi S 30 Classe Tupi IKL 209 www webcitation org Archived from the original on 2021 08 11 Retrieved 2021 08 10 External links edit nbsp Media related to S30 Tupi submarine 1989 at Wikimedia Commons Retrieved from https en wikipedia org w index php title Brazilian submarine Tupi S 30 amp oldid 1186471745, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.