Bloomington GO Station

Bloomington GO Station is a train and bus station along the GO Transit network, located in the extreme northeast corner of Richmond Hill, Ontario. The station primarily serves the community of Oak Ridges and the town of Whitchurch–Stouffville. It is the northern terminus of the Richmond Hill line train service which connects to Union Station in Toronto.[2][3][4] The station opened to the public on June 28, 2021.[1]

Bloomington
Station entrance
General information
Location1796 York Regional Road 40,
Richmond Hill, Ontario
Coordinates43°58′33″N 79°23′50″W / 43.97583°N 79.39722°W / 43.97583; -79.39722Coordinates: 43°58′33″N 79°23′50″W / 43.97583°N 79.39722°W / 43.97583; -79.39722
Owned byMetrolinx
Platforms1 side platform
Tracks3
Construction
Parking998 spaces
Bicycle facilitiesBike shelters with platform access
Other information
Station codeGO Transit: BM
Fare zone98
History
OpenedJune 28, 2021 (2021-06-28)[1]
Services
Preceding station GO Transit Following station
Gormley Richmond Hill Terminus

Construction of the station began in March 2017,[3] a few months after the completion of the Gormley GO Station which opened in December 2016.[2] The station site cost an estimated $82.4 million to develop,[3] (final cost unconfirmed publicly) and the multi-level parking structure and integrated station building was built to satisfy LEED Gold certification.[5]

Station facilities

 
The parking garage includes a large open atrium
 
Station platform

The station is located on the south side of Bloomington Road (York Regional Road 40) on the east side of the Canadian National Railway line and west of Highway 404, and consists of a single platform, building, bus loop, kiss and ride, and 998 parking spaces, 760 of which are in a 3-level parking garage.[6][7][8] Land is reserved for a future carpool parking lot managed by the Ministry of Transportation of Ontario.[7]

Service

As of September 2021, Bloomington GO is served by five round trips per weekday; all Toronto-bound during the morning and returning northbound during the afternoon. Additional weekday service to Toronto is provided by the 61 GO bus.[9]

References

  1. ^ a b Ministry of Transportation of Ontario (June 16, 2021). "Ontario to Officially Open New Bloomington GO Station" (Press release). Government of Ontario. Retrieved June 17, 2021.
  2. ^ a b . GO Transit. Archived from the original on August 10, 2018.
  3. ^ a b c Zarzour, Kim (24 March 2017). "New GO station extends Richmond Hill line to Bloomington and Highway 404". Richmond Hill Liberal. Retrieved 2017-07-17.
  4. ^ Persico, Amanda (April 10, 2019). "New Bloomington GO station rising in Richmond Hill". YorkRegion.com. Retrieved May 6, 2019. Construction continues to 2020 on new train, bus station
  5. ^ "Construction begins for York Region GO station". Daily Commercial News. DCN News Service. 4 April 2017. Retrieved 29 December 2017.
  6. ^ (PDF). AECOM Canada Ltd. August 2009. Archived from the original (PDF) on 2010-04-01. Retrieved 2011-03-23.
  7. ^ a b "Richmond Hill GO line". Metrolinx. Retrieved 1 February 2017.
  8. ^ "Bloomington GO Station". Metrolinx. Retrieved December 28, 2020.
  9. ^ "Richmond Hill GO Train and Bus Schedule" (PDF). GO Transit. 4 September 2021. Retrieved 24 November 2021.

External links

  • Bloomington GO Station construction at Metrolinx
  • IBI Group (November 2016). (PDF). Metrolinx. Archived from the original (PDF) on October 1, 2017.
  • Inside the new Bloomington GO Station on YouTube, Metrolinx video published June 28, 2021
  • Toronto's Newest Train Station is NOW OPEN! Bloomington GO on YouTube published on 29 June 2021

bloomington, station, train, station, along, transit, network, located, extreme, northeast, corner, richmond, hill, ontario, station, primarily, serves, community, ridges, town, whitchurch, stouffville, northern, terminus, richmond, hill, line, train, service,. Bloomington GO Station is a train and bus station along the GO Transit network located in the extreme northeast corner of Richmond Hill Ontario The station primarily serves the community of Oak Ridges and the town of Whitchurch Stouffville It is the northern terminus of the Richmond Hill line train service which connects to Union Station in Toronto 2 3 4 The station opened to the public on June 28 2021 1 BloomingtonStation entranceGeneral informationLocation1796 York Regional Road 40 Richmond Hill OntarioCoordinates43 58 33 N 79 23 50 W 43 97583 N 79 39722 W 43 97583 79 39722 Coordinates 43 58 33 N 79 23 50 W 43 97583 N 79 39722 W 43 97583 79 39722Owned byMetrolinxPlatforms1 side platformTracks3ConstructionParking998 spacesBicycle facilitiesBike shelters with platform accessOther informationStation codeGO Transit BMFare zone98HistoryOpenedJune 28 2021 2021 06 28 1 ServicesPreceding station GO Transit Following stationGormleytowards Union Station Richmond Hill TerminusConstruction of the station began in March 2017 3 a few months after the completion of the Gormley GO Station which opened in December 2016 2 The station site cost an estimated 82 4 million to develop 3 final cost unconfirmed publicly and the multi level parking structure and integrated station building was built to satisfy LEED Gold certification 5 Contents 1 Station facilities 2 Service 3 References 4 External linksStation facilities Edit The parking garage includes a large open atrium Station platform The station is located on the south side of Bloomington Road York Regional Road 40 on the east side of the Canadian National Railway line and west of Highway 404 and consists of a single platform building bus loop kiss and ride and 998 parking spaces 760 of which are in a 3 level parking garage 6 7 8 Land is reserved for a future carpool parking lot managed by the Ministry of Transportation of Ontario 7 Service EditAs of September 2021 update Bloomington GO is served by five round trips per weekday all Toronto bound during the morning and returning northbound during the afternoon Additional weekday service to Toronto is provided by the 61 GO bus 9 References Edit a b Ministry of Transportation of Ontario June 16 2021 Ontario to Officially Open New Bloomington GO Station Press release Government of Ontario Retrieved June 17 2021 a b Bloomington Station GO Station Improvements GO Transit Archived from the original on August 10 2018 a b c Zarzour Kim 24 March 2017 New GO station extends Richmond Hill line to Bloomington and Highway 404 Richmond Hill Liberal Retrieved 2017 07 17 Persico Amanda April 10 2019 New Bloomington GO station rising in Richmond Hill YorkRegion com Retrieved May 6 2019 Construction continues to 2020 on new train bus station Construction begins for York Region GO station Daily Commercial News DCN News Service 4 April 2017 Retrieved 29 December 2017 Richmond Hill Layover Facility EA and Preliminary Design PDF AECOM Canada Ltd August 2009 Archived from the original PDF on 2010 04 01 Retrieved 2011 03 23 a b Richmond Hill GO line Metrolinx Retrieved 1 February 2017 Bloomington GO Station Metrolinx Retrieved December 28 2020 Richmond Hill GO Train and Bus Schedule PDF GO Transit 4 September 2021 Retrieved 24 November 2021 External links EditBloomington GO Station construction at Metrolinx IBI Group November 2016 Environmental Study Report Addendum Bloomington GO Station PDF Metrolinx Archived from the original PDF on October 1 2017 Inside the new Bloomington GO Station on YouTube Metrolinx video published June 28 2021 Toronto s Newest Train Station is NOW OPEN Bloomington GO on YouTube published on 29 June 2021 Retrieved from https en wikipedia org w index php title Bloomington GO Station amp oldid 1132156797, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.