fbpx
Wikipedia

Arizona State Route 30

State Route 30 (SR 30), also known as the Tres Rios Freeway, is a planned freeway in the southwest part of the Phoenix metropolitan area. It is planned as a reliever for Interstate 10 five miles to the south and will run through the communities of Buckeye, Goodyear, Avondale, and Phoenix.[1]

State Route 30

Tres Rios Freeway
Proposed SR 30 corridor highlighted in red
Route information
Maintained by ADOT
Length29 mi[1] (47 km)
Major junctions
West end SR 85 in Buckeye
Major intersections
East end I-17 in Phoenix
Location
CountryUnited States
StateArizona
CountiesMaricopa
Highway system
  • Arizona State Highway System
SR 24 I-40

In earlier planning stages, the freeway was formerly labeled State Route 801 (SR 801).

SR 30 will be broken into three segments: The western segment from SR 85 to Loop 303, the central segment from Loop 303 to Loop 202, and the eastern segment from Loop 202 to I-17.

Route description

SR 30 is planned to begin at SR 85 along the Hazen Road alignment, about one mile south of downtown Buckeye. It will then travel northeast for 10 miles before intersecting Loop 303 between Broadway Road and Southern Avenue in Goodyear. SR 30 will then head east for five miles before turning southeast at the Agua Fria River and running along the Southern Avenue alignment for two and a half miles. While along the Southern Avenue alignment, frontage roads will accompany the road to provide access to local communities. SR 30 will then head back northeast for seven miles before intersecting Loop 202 just south of Broadway Road in Phoenix. SR 30 will then continue to travel northeast for four and a half miles before meeting its eastern terminus by intersecting the Interstate 17 at the Durango Curve in Phoenix. SR 30 will be 29 miles (47 km) in length when fully complete.[1][2]

History

In November 2004, Maricopa County voters approved an extension to an existing sales tax funding regional transportation improvements.[3] A significant portion of those funds will go toward improvements of Interstate 10, which experiences significant volumes of traffic in the southwest part of the Valley. However, rapid growth in the neighboring communities of Buckeye, Goodyear, and Avondale is expected to worsen the congestion on I-10, necessitating the construction of a reliever route.

The Arizona Department of Transportation first identified the need for a route along the current SR 30 corridor in June 2005.[4] The route was planned to run parallel to I-10 five miles to the south through the cities to provide relief. It would run through largely undeveloped land, reducing the impact on residential communities. Due to the extension of the sales tax in 2004, funds were available to help build SR 30.

In response to a budget shortfall brought on by the Great Recession, the Maricopa Association of Governments (MAG) voted to suspend funding to numerous projects in October 2009, including SR 30.[4] While not removing SR 30 from the long-term regional transportation plan, the removal of the funding would effectively postpone the construction of the route until at least 2026. The plan had originally indicated a construction timeline between 2021 and 2025.

In October 2016, it was announced that ADOT was exploring the possibility of building SR 30 as a toll road to accelerate its construction. It was met with mixed reviews from the public and ultimately not approved. The toll feasibility study took six months.[5]

On October 26, 2017, local mayors officially named SR 30 the Tres Rios Freeway after the nearby Gila, Agua Fria, and Salt rivers.[6]

In May 2019, the central segment alternative was approved. It was chosen carefully after four years of study comparing four different possible alternatives.[2]

Current Status

Funding for SR 30 is reliant on an extension of a regional transportation sales tax that currently ends in 2025. In March 2022, the Arizona Senate passed a bill to put that sales tax extension up for voting in spring 2023, however Governor Doug Ducey vetoed that bill in July 2022. Because of this, the tax extension will have to be placed on a future ballot. If the tax extension is approved, funding would be provided for all three segments. If the tax extension is not approved, that could put the construction of SR 30 in jeopardy.[7][8]

ADOT is currently in the process of acquiring right-of-way for the central segment. In their five-year plan released in March 2022, ADOT has budgeted funds for this purchase.[9]

Construction of the central segment will not be until at least 2026. There is no timeline for the western and eastern segments yet.[10]

When SR 30 is first constructed, there will be three lanes in each direction. The ultimate configuration allows for four lanes and one high-occupancy vehicle lane (HOV) in each direction.[10]

Exit list

Exit numbers have not yet been assigned. This exit list is based on preliminary studies and may not be the final design plan.[1][2] Mileposts are determined from the western terminus of the SR 30 project. The entire route is in Maricopa County.

Locationmi[1]kmDestinationsNotes
Buckeye0.000.00  SR 85Planned interchange and western terminus[1]
2.103.38Miller RoadPlanned interchange[1]
4.206.76Watson RoadPlanned interchange[1]
6.5010.46Baseline RoadPlanned interchange[1]
7.6012.23Perryville RoadPlanned interchange[1]
Goodyear9.8015.77 
 
Loop 303 north (Bob Stump Memorial Parkway)
Planned interchange[2]
11.1017.86Cotton LanePlanned interchange with westbound exit and eastbound entrance[2]
12.1019.47Sarival AvenuePlanned interchange with westbound exit and eastbound entrance[2]
13.1021.08Estrella ParkwayPlanned interchange[2]
14.1022.69Bullard AvenuePlanned interchange[2]
Avondale16.2026.07Dysart Road / El Mirage RoadPlanned interchange[2]
17.3027.84Avondale BoulevardPlanned interchange[2]
18.3029.45107th AvenuePlanned interchange[2]
Phoenix20.4032.8391st AvenuePlanned interchange[2]
21.4534.5283rd AvenuePlanned interchange[2]
23.3537.5867th AvenuePlanned interchange with eastbound exit and westbound entrance[2]
23.8038.30  Loop 202 (Ed Pastor Freeway)Planned interchange[2]
25.1040.3951st AvenuePlanned interchange[1]
27.2043.7735th AvenuePlanned interchange[1]
28.3045.54Lower Buckeye RoadPlanned interchange[1]
29.0046.67  I-17 (Black Canyon Freeway) – Flagstaff, TucsonPlanned interchange and eastern terminus[1]
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Unopened

See also

References

  1. ^ a b c d e f g h i j k l m n "MAJOR REGIONAL TRANSPORTATION PLAN AMENDMENT Arizona State Route 30" (PDF). Maricopa Association of Governments. May 10, 2017. Retrieved April 21, 2022.
  2. ^ a b c d e f g h i j k l m n o "State Route 30: Loop 303 to Loop 202 Study". Arizona Department of Transportation. April 28, 2020. Retrieved April 21, 2022.
  3. ^ "About MAG: Proposition 300 and 400". Maricopa Association of Governments. Retrieved February 26, 2022.
  4. ^ a b "State Route 30 (SR 30) Study – SR 303L to SR 202L Public Hearing" (PDF). Arizona Department of Transportation. May 11, 2019. Retrieved February 26, 2022.
  5. ^ "ADOT taking closer look at toll road options in Phoenix area". KPNX. October 4, 2016. Retrieved February 26, 2022.
  6. ^ "New proposed Valley freeway, State Route 30, named 'Tres Rios'". ABC 15 Phoenix. October 26, 2017. Retrieved April 21, 2022.
  7. ^ Christie, Bob (March 17, 2022). "Senate OKs sending transportation tax to Maricopa County voters". FOX 10 Phoenix. Retrieved November 30, 2022.
  8. ^ Estes, Christina (October 14, 2022). "Why business, political leaders want Arizona governor to reconsider transportation tax". KJZZ. Retrieved November 30, 2022.
  9. ^ "2023-2027 Five-Year Transportation Facilities Construction Program" (PDF). Arizona Department of Transportation. March 18, 2022. p. 184. Retrieved April 21, 2022.
  10. ^ a b "State Route (SR) 30: SR 303L to SR 202L Location/Design Concept Report" (PDF). Arizona Department of Transportation. April 2020. pp. 6, 80. Retrieved November 30, 2022.

External links

KML is not from Wikidata

    arizona, state, route, state, route, also, known, tres, rios, freeway, planned, freeway, southwest, part, phoenix, metropolitan, area, planned, reliever, interstate, five, miles, south, will, through, communities, buckeye, goodyear, avondale, phoenix, state, r. State Route 30 SR 30 also known as the Tres Rios Freeway is a planned freeway in the southwest part of the Phoenix metropolitan area It is planned as a reliever for Interstate 10 five miles to the south and will run through the communities of Buckeye Goodyear Avondale and Phoenix 1 State Route 30Tres Rios FreewayProposed SR 30 corridor highlighted in redRoute informationMaintained by ADOTLength29 mi 1 47 km Major junctionsWest endSR 85 in BuckeyeMajor intersectionsLoop 303 in Goodyear Loop 202 in PhoenixEast endI 17 in PhoenixLocationCountryUnited StatesStateArizonaCountiesMaricopaHighway systemArizona State Highway SystemInterstate US State Proposed Former SR 24 I 40 SR 789 SR 802In earlier planning stages the freeway was formerly labeled State Route 801 SR 801 SR 30 will be broken into three segments The western segment from SR 85 to Loop 303 the central segment from Loop 303 to Loop 202 and the eastern segment from Loop 202 to I 17 Contents 1 Route description 2 History 3 Current Status 4 Exit list 5 See also 6 References 7 External linksRoute description EditSR 30 is planned to begin at SR 85 along the Hazen Road alignment about one mile south of downtown Buckeye It will then travel northeast for 10 miles before intersecting Loop 303 between Broadway Road and Southern Avenue in Goodyear SR 30 will then head east for five miles before turning southeast at the Agua Fria River and running along the Southern Avenue alignment for two and a half miles While along the Southern Avenue alignment frontage roads will accompany the road to provide access to local communities SR 30 will then head back northeast for seven miles before intersecting Loop 202 just south of Broadway Road in Phoenix SR 30 will then continue to travel northeast for four and a half miles before meeting its eastern terminus by intersecting the Interstate 17 at the Durango Curve in Phoenix SR 30 will be 29 miles 47 km in length when fully complete 1 2 History EditIn November 2004 Maricopa County voters approved an extension to an existing sales tax funding regional transportation improvements 3 A significant portion of those funds will go toward improvements of Interstate 10 which experiences significant volumes of traffic in the southwest part of the Valley However rapid growth in the neighboring communities of Buckeye Goodyear and Avondale is expected to worsen the congestion on I 10 necessitating the construction of a reliever route The Arizona Department of Transportation first identified the need for a route along the current SR 30 corridor in June 2005 4 The route was planned to run parallel to I 10 five miles to the south through the cities to provide relief It would run through largely undeveloped land reducing the impact on residential communities Due to the extension of the sales tax in 2004 funds were available to help build SR 30 In response to a budget shortfall brought on by the Great Recession the Maricopa Association of Governments MAG voted to suspend funding to numerous projects in October 2009 including SR 30 4 While not removing SR 30 from the long term regional transportation plan the removal of the funding would effectively postpone the construction of the route until at least 2026 The plan had originally indicated a construction timeline between 2021 and 2025 In October 2016 it was announced that ADOT was exploring the possibility of building SR 30 as a toll road to accelerate its construction It was met with mixed reviews from the public and ultimately not approved The toll feasibility study took six months 5 On October 26 2017 local mayors officially named SR 30 the Tres Rios Freeway after the nearby Gila Agua Fria and Salt rivers 6 In May 2019 the central segment alternative was approved It was chosen carefully after four years of study comparing four different possible alternatives 2 Current Status EditFunding for SR 30 is reliant on an extension of a regional transportation sales tax that currently ends in 2025 In March 2022 the Arizona Senate passed a bill to put that sales tax extension up for voting in spring 2023 however Governor Doug Ducey vetoed that bill in July 2022 Because of this the tax extension will have to be placed on a future ballot If the tax extension is approved funding would be provided for all three segments If the tax extension is not approved that could put the construction of SR 30 in jeopardy 7 8 ADOT is currently in the process of acquiring right of way for the central segment In their five year plan released in March 2022 ADOT has budgeted funds for this purchase 9 Construction of the central segment will not be until at least 2026 There is no timeline for the western and eastern segments yet 10 When SR 30 is first constructed there will be three lanes in each direction The ultimate configuration allows for four lanes and one high occupancy vehicle lane HOV in each direction 10 Exit list EditExit numbers have not yet been assigned This exit list is based on preliminary studies and may not be the final design plan 1 2 Mileposts are determined from the western terminus of the SR 30 project The entire route is in Maricopa County Locationmi 1 kmDestinationsNotesBuckeye0 000 00 SR 85Planned interchange and western terminus 1 2 103 38Miller RoadPlanned interchange 1 4 206 76Watson RoadPlanned interchange 1 6 5010 46Baseline RoadPlanned interchange 1 7 6012 23Perryville RoadPlanned interchange 1 Goodyear9 8015 77 Loop 303 north Bob Stump Memorial Parkway Planned interchange 2 11 1017 86Cotton LanePlanned interchange with westbound exit and eastbound entrance 2 12 1019 47Sarival AvenuePlanned interchange with westbound exit and eastbound entrance 2 13 1021 08Estrella ParkwayPlanned interchange 2 14 1022 69Bullard AvenuePlanned interchange 2 Avondale16 2026 07Dysart Road El Mirage RoadPlanned interchange 2 17 3027 84Avondale BoulevardPlanned interchange 2 18 3029 45107th AvenuePlanned interchange 2 Phoenix20 4032 8391st AvenuePlanned interchange 2 21 4534 5283rd AvenuePlanned interchange 2 23 3537 5867th AvenuePlanned interchange with eastbound exit and westbound entrance 2 23 8038 30 Loop 202 Ed Pastor Freeway Planned interchange 2 25 1040 3951st AvenuePlanned interchange 1 27 2043 7735th AvenuePlanned interchange 1 28 3045 54Lower Buckeye RoadPlanned interchange 1 29 0046 67 I 17 Black Canyon Freeway Flagstaff TucsonPlanned interchange and eastern terminus 1 1 000 mi 1 609 km 1 000 km 0 621 mi UnopenedSee also EditRoads and freeways in metropolitan Phoenix Arizona State Route 24 Arizona State Route 202 Arizona State Route 303References Edit a b c d e f g h i j k l m n MAJOR REGIONAL TRANSPORTATION PLAN AMENDMENT Arizona State Route 30 PDF Maricopa Association of Governments May 10 2017 Retrieved April 21 2022 a b c d e f g h i j k l m n o State Route 30 Loop 303 to Loop 202 Study Arizona Department of Transportation April 28 2020 Retrieved April 21 2022 About MAG Proposition 300 and 400 Maricopa Association of Governments Retrieved February 26 2022 a b State Route 30 SR 30 Study SR 303L to SR 202L Public Hearing PDF Arizona Department of Transportation May 11 2019 Retrieved February 26 2022 ADOT taking closer look at toll road options in Phoenix area KPNX October 4 2016 Retrieved February 26 2022 New proposed Valley freeway State Route 30 named Tres Rios ABC 15 Phoenix October 26 2017 Retrieved April 21 2022 Christie Bob March 17 2022 Senate OKs sending transportation tax to Maricopa County voters FOX 10 Phoenix Retrieved November 30 2022 Estes Christina October 14 2022 Why business political leaders want Arizona governor to reconsider transportation tax KJZZ Retrieved November 30 2022 2023 2027 Five Year Transportation Facilities Construction Program PDF Arizona Department of Transportation March 18 2022 p 184 Retrieved April 21 2022 a b State Route SR 30 SR 303L to SR 202L Location Design Concept Report PDF Arizona Department of Transportation April 2020 pp 6 80 Retrieved November 30 2022 External links EditKML file edit help Template Attached KML Arizona State Route 30KML is not from Wikidata Arizona Department of Transportation page Retrieved from https en wikipedia org w index php title Arizona State Route 30 amp oldid 1124885277, wikipedia, wiki, book, books, library,

    article

    , read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.