fbpx
Wikipedia

Acumulador de Carga Rápida

Acumulador de Carga Rápida (ACR) (transl. fast-charging battery) is a battery electric tram system marketed by Construcciones y Auxiliar de Ferrocarriles (CAF) of Spain. Trams equipped with ACR are fast-charged while at stops; elsewhere they require no overhead line, which is desirable for reasons of safety, reliability, cost, and aesthetics.[1][2] It also allows regenerative braking where direct current electrification systems cannot return (much) energy to the grid.[citation needed]

An ACR-equipped Urbos 3 tram running through central Seville without overhead line, 2015. The supercapacitor batteries are visible on the roof of each end car.

Operation edit

ACR-equipped trams are powered between stops by discharging a rooftop supercapacitor battery, weighing around 1 tonne (2,200 lb), which gives a range of around 2 miles (3.2 km). The battery is partially recharged between stops by regenerative braking; at stops, it is completely recharged in around thirty seconds by current drawn via pantograph from a short section of overhead line.

Marketing edit

CAF offers ACR as an option on its Urbos 3 tram; for retrofitting on trams built by CAF or other manufacturers; and for standard gauge and metre gauge tram systems.

ACR's most direct competitor is the ground-level power supply (APS) marketed by Alstom; CAF differentiates ACR against APS through its support of regenerative braking. CAF claims that ACR could be useful in rapid transit systems for the same reason.

Installations edit

Since Seville's MetroCentro tramway opened in 2007, sections of its overhead line around the Seville Cathedral had been dismantled annually to allow Holy Week processions to pass safely. ACR's first commercial installation was aboard Urbos trams supplied to MetroCentro in 2011, allowing the permanent removal of overhead lines around the cathedral.[3]

Line 1 of the Tranvía de Zaragoza has also used ACR since its second construction phase was completed in 2013. The use of ACR avoided the installation of overhead lines in the city's historic centre.[4][5]

ACR was included in the Newcastle Light Rail in Australia and Luxembourg's new tram system.[6][7]

See also edit

References edit

  1. ^ Andersen, Ulrik (2013-11-05). "Kamerasystem skal advare lokoførere mod svingende køreledninger på Storebælt". Ingeniøren (in Danish). Retrieved 2018-07-16.
  2. ^ Stewart, Matt (2012-05-21). "Matangi trains 'more susceptible' to frost". The Dominion Post. Wellington. Retrieved 2018-07-16.
  3. ^ Ameneiro, A. S. (2011-04-05). "Adiós a las catenarias en la Catedral". Diario de Sevilla (in Spanish). Seville. Retrieved 2018-07-16.
  4. ^ "Zaragoza tram Line 1 enters service". Railway Gazette International. London. 2011-04-26. Retrieved 2018-07-16.
  5. ^ Crespo Roig, María (2011-01-20). "CAF apuesta por que Zaragoza tenga un metro sin catenarias que funcione con la energía que recargue en las paradas". aragondigital.es (in Spanish). Zaragoza. Retrieved 2018-07-16.
  6. ^ "Newcastle light rail to be Australia's first 'wire-free' system". 19 April 2017.
  7. ^ "Newcastle Light Rail, Australia | Aurecon".

acumulador, carga, rápida, transl, fast, charging, battery, battery, electric, tram, system, marketed, construcciones, auxiliar, ferrocarriles, spain, trams, equipped, with, fast, charged, while, stops, elsewhere, they, require, overhead, line, which, desirabl. Acumulador de Carga Rapida ACR transl fast charging battery is a battery electric tram system marketed by Construcciones y Auxiliar de Ferrocarriles CAF of Spain Trams equipped with ACR are fast charged while at stops elsewhere they require no overhead line which is desirable for reasons of safety reliability cost and aesthetics 1 2 It also allows regenerative braking where direct current electrification systems cannot return much energy to the grid citation needed An ACR equipped Urbos 3 tram running through central Seville without overhead line 2015 The supercapacitor batteries are visible on the roof of each end car Contents 1 Operation 2 Marketing 3 Installations 4 See also 5 ReferencesOperation editThis section needs additional citations for verification Please help improve this article by adding citations to reliable sources in this section Unsourced material may be challenged and removed July 2018 Learn how and when to remove this template message ACR equipped trams are powered between stops by discharging a rooftop supercapacitor battery weighing around 1 tonne 2 200 lb which gives a range of around 2 miles 3 2 km The battery is partially recharged between stops by regenerative braking at stops it is completely recharged in around thirty seconds by current drawn via pantograph from a short section of overhead line Marketing editThis section needs additional citations for verification Please help improve this article by adding citations to reliable sources in this section Unsourced material may be challenged and removed July 2018 Learn how and when to remove this template message CAF offers ACR as an option on its Urbos 3 tram for retrofitting on trams built by CAF or other manufacturers and for standard gauge and metre gauge tram systems ACR s most direct competitor is the ground level power supply APS marketed by Alstom CAF differentiates ACR against APS through its support of regenerative braking CAF claims that ACR could be useful in rapid transit systems for the same reason Installations editSince Seville s MetroCentro tramway opened in 2007 sections of its overhead line around the Seville Cathedral had been dismantled annually to allow Holy Week processions to pass safely ACR s first commercial installation was aboard Urbos trams supplied to MetroCentro in 2011 allowing the permanent removal of overhead lines around the cathedral 3 Line 1 of the Tranvia de Zaragoza has also used ACR since its second construction phase was completed in 2013 The use of ACR avoided the installation of overhead lines in the city s historic centre 4 5 ACR was included in the Newcastle Light Rail in Australia and Luxembourg s new tram system 6 7 See also editGround level power supplyReferences edit Andersen Ulrik 2013 11 05 Kamerasystem skal advare lokoforere mod svingende koreledninger pa Storebaelt Ingenioren in Danish Retrieved 2018 07 16 Stewart Matt 2012 05 21 Matangi trains more susceptible to frost The Dominion Post Wellington Retrieved 2018 07 16 Ameneiro A S 2011 04 05 Adios a las catenarias en la Catedral Diario de Sevilla in Spanish Seville Retrieved 2018 07 16 Zaragoza tram Line 1 enters service Railway Gazette International London 2011 04 26 Retrieved 2018 07 16 Crespo Roig Maria 2011 01 20 CAF apuesta por que Zaragoza tenga un metro sin catenarias que funcione con la energia que recargue en las paradas aragondigital es in Spanish Zaragoza Retrieved 2018 07 16 Newcastle light rail to be Australia s first wire free system 19 April 2017 Newcastle Light Rail Australia Aurecon Retrieved from https en wikipedia org w index php title Acumulador de Carga Rapida amp oldid 1216039043, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.