fbpx
Wikipedia

DEx12 expressway

The DEx12 expressway (Romanian: Drumul expres DEx12), also known as the Pitești–Craiova Expressway (Romanian: Drumul expres Pitești–Craiova), is a partially built expressway in the south-western part of Romania, previously labelled as A12, when it was considered as a future motorway.[1] It will connect the cities of Pitești (branching off the A1 motorway), Slatina and Craiova (where it is planned to merge with the also planned A6 motorway), being 121 km long, with an estimated total cost of 1.66 billion euro.[2]

DEx12 expressway
Drumul expres DX12
Route information
Maintained by Compania Națională de Autostrăzi și Drumuri Naționale din România
Length37.3 km (23.2 mi)
84 km (52 mi) under construction
121 km (75 mi) planned
Existed2022–present
Major junctions
From A 1 near Pitești
To A 6 near Craiova (planned)
Location
CountryRomania
CountiesArgeș, Olt, Dolj
Highway system
A 11 A 13

As of 28 July 2022, only the Slatina - Balș segment is in service, totaling 37 km (23 mi).

Expressway 12 near Piatra Olt
Temporary terminus of Expressway 12 east of Slatina

History Edit

While planned as a motorway, the construction was tendered as a concession contract in March 2013,[3] that should have been awarded until December 2013.[2] It was also yet to be decided whether it would be built as a motorway or an expressway.[4]

In April 2017, it was suggested for the first time that this road will be an express road and not a motorway.[5] Despite receiving criticism in the media for this switch,[6] the road was tendered in November 2017.[7]

It is split into four sections. The contracts for the sections 1 and 2 were awarded in October 2018 to the Italian company Tirrena Scavi and the Romanian company Spedition UMB, respectively,[8] while those for the sections 3 and 4 had been signed in September 2020 with the Romanian joint-venture SA&PE Construct-Spedition UMB-Tehnostrade, without waiting for the decisions of the Bucharest Court of Appeal, the bids being challenged by several other participants.[9] Initially, the first tenders for the sections 3 and 4, launched during 2017,[10] had been canceled in August 2018 due to other participants challenging them,[11] being launched again during 2019.[12]

Works on section 3 were allowed to begin in May 2021,[13] but the contract for section 4 was terminated by the Bucharest Court of Appeal, who obliged the CNAIR to review the bids of the Chinese company China Railway, of the Turkish company Nurol, and of the Italian company Rizzani, all who challenged the winning bid for the said section.[14] In August 2021, the contract for section 4 was signed again with the same Romanian joint-venture with which the first contract was signed.[15]

Among companies asking for the expressway works to begin as soon as possible was the automaker Ford, who has a car plant in Craiova. Due to this, the expressway is sometimes referred to as the Autostrada Ford (Ford motorway).[16] In May 2021, the CNAIR submitted a request for the financing of a feasibility study and technical project for what could be a new connecting road between National Road 6 near the Ford Craiova plant and the DEx12 expressway.[17]

In March 2022, construction works for section 4 began.[18] However, on the 21st December, the contract for section 1, with Tirrena Scavi, was cancelled. The progress for the execution of the section currently sits at 58.26%. [19]

Openings timeline Edit

Exit list Edit

Exits and buildings (eastbound)
Balș (OT) – Slatina West (OT) 37 km
  km 0 Craiova North     Under Construction
  km 1 Craiova / Ghercesti DJ643F   Under Construction
  km 14 Parking     Under Construction
  km 21 Balș West     In Service
  km 27 Balș East DJ644   In Service
  km 29 Parking     In Service
  km 35 Slatina West / Găneasa     In Service
  km 41 Parking     In Service
  km 50 Slatina South DJ546   In Service
  km 55 Parking     In Service
  km 57 Slatina East     In Service


See also Edit

References Edit

  1. ^ "Archived copy" (PDF). (PDF) from the original on 2014-10-06. Retrieved 2014-12-09.{{cite web}}: CS1 maint: archived copy as title (link)
  2. ^ a b "Şova: Tronsoanele de autostradă Comarnic-Braşov, Craiova-Piteşti şi centura de sud a Capitalei, gata până la alegerile din 2016". Mediafax. 12 May 2013. from the original on 7 June 2013. Retrieved 4 June 2013.
  3. ^ . CNADNR. 11 March 2013. Archived from the original on 24 December 2013.
  4. ^ "Craiova – Pitești, drum expres sau autostradă?". Gazeta de Sud. 31 March 2013. from the original on 2014-04-09. Retrieved 2013-06-04.
  5. ^ (romaniajournal.ro) Pitesti-Craiova will be express road, not highway – Transport Minister says: http://www.romaniajournal.ro/pitesti-craiova-will-be-express-road-not-highway-transport-minister-says/[permanent dead link]
  6. ^ "Deputat USR: În loc de autostrada Craiova – Piteşti, "vor să construiască un drum de nivelul anilor '50–'60"". 14 April 2017. from the original on 2019-01-01. Retrieved 2018-12-31.
  7. ^ "Au fost deschise ofertele la licitaţia pentru drumul expres Craiova-Piteşti -". 23 November 2017. from the original on 20 September 2020. Retrieved 31 December 2018.
  8. ^ "HARTĂ INTERACTIVĂ Au fost desemnați constructorii pentru jumătate din Drumul expres Pitești – Craiova: 385 de milioane de euro pentru circa 60 de km. Vezi cine sunt câștigătorii și pe unde va trece viitoarea șosea – Infrastructura – HotNews.ro". October 2018. from the original on 2019-01-01. Retrieved 2018-12-31.
  9. ^ "Drumul Expres DX12 Craiova – Pitești: Ultimele două tronsoane, contractate cu UMB / Decizia CNAIR care grăbește implementarea proiectului". HotNews.ro (in Romanian). 16 September 2020. from the original on 2021-08-03. Retrieved 2021-08-03.
  10. ^ "HARTĂ INTERACTIVĂ Drumul expres Craiova - Pitești: UMB câștigă contractul și pentru execuția Tronsonului 4. Constructorul român, pe trei din patru loturi".
  11. ^ "Drumul Expres DX12 Craiova - Pitești: Ultimele două tronsoane, contractate cu UMB / Decizia CNAIR care grăbește implementarea proiectului".
  12. ^ "HARTĂ INTERACTIVĂ Drumul expres Craiova - Pitești: Interes mare din partea constructorilor din Turcia și din China pentru tronsoanele 3 și 4 / 400 de mil. Euro pentru 64 de km".
  13. ^ "VIDEO Imagini din dronă, în premieră, cu începutul lucrărilor la lotul 3 al drumului expres Craiova-Pitești". HotNews.ro (in Romanian). 4 May 2021. from the original on 2021-08-03. Retrieved 2021-08-03.
  14. ^ ""Autostrada Ford". Instanța obligă CNAIR să reevalueze ofertele pentru tronsonul 4, după ce a semnat deja contract cu Umbrărescu". Economica.net (in Romanian). 17 November 2020. from the original on 2021-08-03. Retrieved 2021-08-03.
  15. ^ "Drumul Expres DX12 Craiova – Pitești: A fost semnat contractul pe ultimul tronson cu românii de la UMB, același constructor care anul acesta ar urma sa finalizeze circa 40 de km din proiect". HotNews.ro. 17 August 2021. from the original on 26 August 2021. Retrieved 26 February 2022.
  16. ^ "VIDEO Drumul expres Craiova-Pitești / Decizie inedită a CNAIR: semnează cu firmele lui Dorinel Umbrărescu contractele pentru construcția tronsoanelor 3 și 4, deși sunt contestații pe rol la Curtea de Apel". G4Media (in Romanian). 16 September 2020. from the original on 2021-08-03. Retrieved 2021-08-03.
  17. ^ "CNAIR construieşte un drum de legătură între Uzina Ford Craiova şi Drumul Expres Craiova – Piteşti. Cum va fi finanţat". Adevărul (in Romanian). from the original on 2021-08-03. Retrieved 2021-08-03.
  18. ^ Marta, Elena (2022-03-22). "Pro Infrastructură: Lucrări incipiente pe Tronsonul 4 al DEx12 Craiova-Pitești" (in Romanian). Retrieved 2022-03-24.
  19. ^ "E oficial: CNAIR reziliază contractele cu Tirrena Scavi". Economica.net (in Romanian). 2022-12-21. Retrieved 2022-12-30.
  20. ^ "VIDEO Primul tronson de drum expres din România se deschide azi: Cum arată DEx12 de lângă Balș cu câteva ore înainte de inaugurare". www.hotnews.ro (in Romanian). Retrieved 2022-04-21.
  21. ^ "S-a deschis Centura Slatina, pe Drumul Expres Craiova - Pitești. Cum se circulă pe cei 21 de km de drum de mare viteză". www.digi24.ro (in Romanian). Retrieved 2022-07-28.

External links Edit

  • Map of the planned motorway route
  • CNADNR – Craiova – Pitești 2013-03-13 at the Wayback Machine

dex12, expressway, romanian, drumul, expres, dex12, also, known, pitești, craiova, expressway, romanian, drumul, expres, pitești, craiova, partially, built, expressway, south, western, part, romania, previously, labelled, when, considered, future, motorway, wi. The DEx12 expressway Romanian Drumul expres DEx12 also known as the Pitești Craiova Expressway Romanian Drumul expres Pitești Craiova is a partially built expressway in the south western part of Romania previously labelled as A12 when it was considered as a future motorway 1 It will connect the cities of Pitești branching off the A1 motorway Slatina and Craiova where it is planned to merge with the also planned A6 motorway being 121 km long with an estimated total cost of 1 66 billion euro 2 DEx12 expresswayDrumul expres DX12Route informationMaintained by Compania Națională de Autostrăzi și Drumuri Naționale din RomaniaLength37 3 km 23 2 mi 84 km 52 mi under construction121 km 75 mi plannedExisted2022 presentMajor junctionsFromA 1 near PiteștiToA 6 near Craiova planned LocationCountryRomaniaCountiesArgeș Olt DoljHighway systemRoads in RomaniaHighways A 11 A 13As of 28 July 2022 only the Slatina Balș segment is in service totaling 37 km 23 mi Expressway 12 near Piatra OltTemporary terminus of Expressway 12 east of Slatina Contents 1 History 2 Openings timeline 3 Exit list 4 See also 5 References 6 External linksHistory EditWhile planned as a motorway the construction was tendered as a concession contract in March 2013 3 that should have been awarded until December 2013 2 It was also yet to be decided whether it would be built as a motorway or an expressway 4 In April 2017 it was suggested for the first time that this road will be an express road and not a motorway 5 Despite receiving criticism in the media for this switch 6 the road was tendered in November 2017 7 It is split into four sections The contracts for the sections 1 and 2 were awarded in October 2018 to the Italian company Tirrena Scavi and the Romanian company Spedition UMB respectively 8 while those for the sections 3 and 4 had been signed in September 2020 with the Romanian joint venture SA amp PE Construct Spedition UMB Tehnostrade without waiting for the decisions of the Bucharest Court of Appeal the bids being challenged by several other participants 9 Initially the first tenders for the sections 3 and 4 launched during 2017 10 had been canceled in August 2018 due to other participants challenging them 11 being launched again during 2019 12 Works on section 3 were allowed to begin in May 2021 13 but the contract for section 4 was terminated by the Bucharest Court of Appeal who obliged the CNAIR to review the bids of the Chinese company China Railway of the Turkish company Nurol and of the Italian company Rizzani all who challenged the winning bid for the said section 14 In August 2021 the contract for section 4 was signed again with the same Romanian joint venture with which the first contract was signed 15 Among companies asking for the expressway works to begin as soon as possible was the automaker Ford who has a car plant in Craiova Due to this the expressway is sometimes referred to as the Autostrada Ford Ford motorway 16 In May 2021 the CNAIR submitted a request for the financing of a feasibility study and technical project for what could be a new connecting road between National Road 6 near the Ford Craiova plant and the DEx12 expressway 17 In March 2022 construction works for section 4 began 18 However on the 21st December the contract for section 1 with Tirrena Scavi was cancelled The progress for the execution of the section currently sits at 58 26 19 Openings timeline Edit21 April 2022 Slatina Balș 16 0 km 20 28 July 2022 the Slatina bypass 21 3 km 21 Exit list EditExits and buildings eastbound Balș OT Slatina West OT 37 km km 0 Craiova North Under Construction km 1 Craiova Ghercesti DJ643F Under Construction km 14 Parking Under Construction km 21 Balș West In Service km 27 Balș East DJ644 In Service km 29 Parking In Service km 35 Slatina West Găneasa In Service km 41 Parking In Service km 50 Slatina South DJ546 In Service km 55 Parking In Service km 57 Slatina East In ServiceSee also EditRoads in Romania Transport in RomaniaReferences Edit Archived copy PDF Archived PDF from the original on 2014 10 06 Retrieved 2014 12 09 a href Template Cite web html title Template Cite web cite web a CS1 maint archived copy as title link a b Sova Tronsoanele de autostradă Comarnic Brasov Craiova Pitesti si centura de sud a Capitalei gata pană la alegerile din 2016 Mediafax 12 May 2013 Archived from the original on 7 June 2013 Retrieved 4 June 2013 Contract de concesiune de lucrari publice privind proiectarea constructia finantarea operarea si intretinerea Drumului Expres Autostrada Craiova Pitesti km 0 000 km 121 185 CNADNR 11 March 2013 Archived from the original on 24 December 2013 Craiova Pitești drum expres sau autostradă Gazeta de Sud 31 March 2013 Archived from the original on 2014 04 09 Retrieved 2013 06 04 romaniajournal ro Pitesti Craiova will be express road not highway Transport Minister says http www romaniajournal ro pitesti craiova will be express road not highway transport minister says permanent dead link Deputat USR In loc de autostrada Craiova Pitesti vor să construiască un drum de nivelul anilor 50 60 14 April 2017 Archived from the original on 2019 01 01 Retrieved 2018 12 31 Au fost deschise ofertele la licitaţia pentru drumul expres Craiova Pitesti 23 November 2017 Archived from the original on 20 September 2020 Retrieved 31 December 2018 HARTĂ INTERACTIVĂ Au fost desemnați constructorii pentru jumătate din Drumul expres Pitești Craiova 385 de milioane de euro pentru circa 60 de km Vezi cine sunt caștigătorii și pe unde va trece viitoarea șosea Infrastructura HotNews ro October 2018 Archived from the original on 2019 01 01 Retrieved 2018 12 31 Drumul Expres DX12 Craiova Pitești Ultimele două tronsoane contractate cu UMB Decizia CNAIR care grăbește implementarea proiectului HotNews ro in Romanian 16 September 2020 Archived from the original on 2021 08 03 Retrieved 2021 08 03 HARTĂ INTERACTIVĂ Drumul expres Craiova Pitești UMB caștigă contractul și pentru execuția Tronsonului 4 Constructorul roman pe trei din patru loturi Drumul Expres DX12 Craiova Pitești Ultimele două tronsoane contractate cu UMB Decizia CNAIR care grăbește implementarea proiectului HARTĂ INTERACTIVĂ Drumul expres Craiova Pitești Interes mare din partea constructorilor din Turcia și din China pentru tronsoanele 3 și 4 400 de mil Euro pentru 64 de km VIDEO Imagini din dronă in premieră cu inceputul lucrărilor la lotul 3 al drumului expres Craiova Pitești HotNews ro in Romanian 4 May 2021 Archived from the original on 2021 08 03 Retrieved 2021 08 03 Autostrada Ford Instanța obligă CNAIR să reevalueze ofertele pentru tronsonul 4 după ce a semnat deja contract cu Umbrărescu Economica net in Romanian 17 November 2020 Archived from the original on 2021 08 03 Retrieved 2021 08 03 Drumul Expres DX12 Craiova Pitești A fost semnat contractul pe ultimul tronson cu romanii de la UMB același constructor care anul acesta ar urma sa finalizeze circa 40 de km din proiect HotNews ro 17 August 2021 Archived from the original on 26 August 2021 Retrieved 26 February 2022 VIDEO Drumul expres Craiova Pitești Decizie inedită a CNAIR semnează cu firmele lui Dorinel Umbrărescu contractele pentru construcția tronsoanelor 3 și 4 deși sunt contestații pe rol la Curtea de Apel G4Media in Romanian 16 September 2020 Archived from the original on 2021 08 03 Retrieved 2021 08 03 CNAIR construieste un drum de legătură intre Uzina Ford Craiova si Drumul Expres Craiova Pitesti Cum va fi finanţat Adevărul in Romanian Archived from the original on 2021 08 03 Retrieved 2021 08 03 Marta Elena 2022 03 22 Pro Infrastructură Lucrări incipiente pe Tronsonul 4 al DEx12 Craiova Pitești in Romanian Retrieved 2022 03 24 E oficial CNAIR reziliază contractele cu Tirrena Scavi Economica net in Romanian 2022 12 21 Retrieved 2022 12 30 VIDEO Primul tronson de drum expres din Romania se deschide azi Cum arată DEx12 de langă Balș cu cateva ore inainte de inaugurare www hotnews ro in Romanian Retrieved 2022 04 21 S a deschis Centura Slatina pe Drumul Expres Craiova Pitești Cum se circulă pe cei 21 de km de drum de mare viteză www digi24 ro in Romanian Retrieved 2022 07 28 External links EditMap of the planned motorway route CNADNR Craiova Pitești Archived 2013 03 13 at the Wayback Machine Retrieved from https en wikipedia org w index php title DEx12 expressway amp oldid 1141075191, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.