The Suburban Rail Loop (SRL) is a group of new rapid transit lines planned or under construction in Melbourne, Victoria, Australia. The project is divided into four distinct sections. The two main sections, SRL East and SRL North, would together form a single 60 km (37 mi) fully automated orbital metro line through the city's middle suburbs, with 13 stations between Cheltenham and Melbourne Airport connecting to eight existing Melbourne rail lines. SRL East is currently under construction and is planned to open in 2035.

Suburban Rail Loop
Map of Suburban Rail Loop
Overview
StatusUnder construction (SRL East)
OwnerVicTrack (Projected)
LocaleMelbourne, Victoria, Australia
Termini
Stations6 (SRL East)
7 (SRL North)
2 (SRL Airport)
TBD (SRL West)
Websitesuburbanrailloop.vic.gov.au
Service
TypeRapid transit
Depot(s)Heatherton Train Stabling Site
Rolling stock4-car driverless trains (SRL East & SRL North)
High Capacity Metro Trains (SRL Airport)
History
Commenced2022 (SRL East, SRL Airport)
Planned opening2035 (SRL East)
2043–53 (SRL North)
TBD (SRL Airport)
TBD (SRL West)
Estimated cost$31–58 billion
Technical
Line length15 km (9.3 mi) (SRL Airport)
26 km (16 mi) (SRL East)
34 km (21 mi) (SRL North)
90 km (56 mi) (total)
Number of tracks2
CharacterUnderground (SRL East and SRL North)
ElectrificationOverhead catenary
Operating speed100 km/h (62 mph)

The SRL Airport section, in the city's west, would be formed by the separate Melbourne Airport rail link project, which is being delivered separately by Rail Projects Victoria. This section will run into the central business district via the Metro Tunnel. The final section, SRL West, has not been defined in detail by the state government but would connect the city's outer western suburbs and may be formed by electrifying the existing Deer Park–West Werribee railway line and extending it to Werribee station.

Several orbital rail schemes have been proposed and some constructed throughout Melbourne's history, but the rail network has remained largely radial. The Victorian Labor government led by Premier Daniel Andrews announced the SRL as policy in 2018 in the lead up that year's state election. Initial planning for the SRL was carried out in secret prior to its announcement, and, when the plans were released, it received significant attention. The SRL plan was praised for its long-term vision and ambition, as well as being an innovative solution to the difficulties faced by Melbourne's transport network, but criticised for its political motives and large cost.

SRL East and North would take more than 25 years to construct and together are estimated by the project's business case to cost between $30.7 and $57.6 billion depending on project staging, of which capital costs would be between $24.1 and $45.1 billion.[1] SRL East and North will be built entirely underground along new rail alignments, while SRL Airport will be formed by the at-grade and elevated Melbourne Airport rail link and funded separately.

In 2021, the Victorian government announced that the SRL East, between Cheltenham and Box Hill, would commence construction first and be open by 2035.[2] On 2 June 2022, early works began on SRL East with major construction expected to commence in 2023, followed by tunnelling works in 2026.[3]

Background edit

 
The Suburban Rail Loop, shown with proposed extensions to the Melbourne rail network.

The Melbourne transport network was substantially developed in the late 19th century, when the newly available technology of the railway enabled population growth away from the city centre. The result was the development of a largely radial network, which, over the following century, reinforced a model of urban development focused on heavy daily commuter flows into and out of the CBD. Furthermore, a program of freeway construction in the wake of the 1969 Melbourne Transportation Plan reinforced the structure of the suburbs and introduced car dependence to new regions of development not served by the legacy rail network. As a consequence, Melbourne, unlike many cities of comparable size, did not develop any major centres of employment or dense population in its outlying regions over the course of the 20th century.[4]

A number of orbital lines were constructed at the peak of railway development, but most failed to attract the necessary traffic of passengers and goods to remain sustainable into the late 20th century. The Outer Circle, which ran from Oakleigh on the Dandenong line to Fairfield on the Hurstbridge line via the Glen Waverley and Lilydale lines, was constructed between 1888 and 1891 but closed by 1897, though it was partly reopened as the Alamein branch line.[5] The Inner Circle linking the modern-day Upfield and Mernda lines, was opened in 1888 but closed to passengers in 1941.[6] The Albion-Jacana line and Newport-Sunshine line in the city's west, though performing a similar purpose, were never intended to carry passenger traffic.

In the late 20th century, interest grew in enabling orbital journeys between Melbourne suburbs. Included in the 1969 Plan were a number of orbital freeways, some of which were constructed over the following decades. The M80 Ring Road through the outer western and northern suburbs was constructed in stages between 1989 and 1999, and, by the time of its completion, was claimed by its advocates to have been partly responsible for a massive economic boom in the western suburbs, centred on its points of intersection with existing radial routes.[7][a] EastLink, a similar orbital freeway through the eastern suburbs, opened in 2008,[9] but was less successful, failing to reduce traffic meaningfully on parallel arterials such as Springvale Road.[10] Detailed plans for the North East Link, connecting the Ring Road and EastLink to complete the orbital route, were released in 2018, with construction expected to start in 2020 for an anticipated completion date of 2027.[11]

Despite the investment in orbital road transport from 1990, little changed in the structure of the public transport network. No new suburban railway lines after 1930, and trams were increasingly delayed by traffic congestion on key routes.[12] From 2002, the SmartBus program introduced three orbital bus routes in an attempt to meet the city's burgeoning need for outer suburban public transport. In addition to serving new corridors previously without mass transit, the buses were operated at a relatively high frequency and along direct routes, in contrast to the existing network of infrequent and circuitous routes. As a result, the SmartBus routes became the most heavily used in Melbourne, and were widely praised as a model for recasting the future public transport network.[13]

History edit

Proposal edit

In August 2018, three months prior to the 2018 Victorian state election, then Premier Daniel Andrews promised that a re-elected Labor government would undertake "the biggest public transport building program in Australian history", in a speech to the Committee for Economic Development of Australia. The comments were interpreted as a hint that as-yet-unannounced projects would be revealed closer to the election, although Andrews provided no detail in his speech.[14]

On 27 August, Andrews revealed plans for the Suburban Rail Loop for the first time: a 90 km (56 mi) orbital line for Melbourne's rail network, connecting 11 of the city's existing rail lines and serving new regions of the middle and outer suburbs at an estimated cost of $50 billion.[15] The government committed $300 million to complete a business case and feasibility study should it be re-elected, noting that the project would take several terms of government to complete.[16]

In the days following the proposal, the government revealed that its plan had been under consideration within Development Victoria, a planning agency under the Department of Environment, Land, Water and Planning for 12 months. Controversially, neither Infrastructure Victoria nor Transport for Victoria, both established by the Andrews government, had been involved in the SRL's planning stages; furthermore, neither agency had identified the need for a similar project in their long-term plans for the transport network. Andrews defended the decision to develop the SRL independently of infrastructure authorities, arguing that while Infrastructure Victoria "have lots of good ideas, they don't have every good idea".[17]

The tender process for the Melbourne Airport rail link project was launched in mid-September, and the state government confirmed that it anticipated the airport link would form part of the SRL West, with construction beginning in 2022[18]

In mid-October, Labor federal Leader of the Opposition Bill Shorten announced support for the SRL, including a commitment for $300 million in initial federal funding should the Labor Party be elected.[19] The state government also indicated that it would be prepared to add additional stops to the loop to those included in the original announcement, particularly in the western suburbs.[20]

Days later, a leaked document from Transport for Victoria showed that the SRL had not been included in the transport authority's long-term plan for the rail network.[21]

Planning edit

$300 million was allocated to planning works for the SRL in the 2019 state budget.[22] Rail Projects Victoria announced registrations of interest for potential contractors were open in June,[23] and the first geotechnical investigations began in July in Box Hill.[24]

The state government announced the formation of a Suburban Rail Loop Authority in September, at the same time as confirming station precincts for SRL East.[25] In November 2019, the government announced that the loop would be an operationally independent, standalone line using different rail technology from the existing suburban rail network.[26][27] The system would use new, smaller metro rollingstock that is four to five carriages long, allowing shorter platforms.[27][26] The Premier announced an intention to use private investment to help fund the line, but did not indicate whether the line would be driverless.[27]

In 2020, the government committed a further $2.2 billion for initial and early works on the loop, with expressions of interest opened for contractors to deliver these works.[28] Jacinta Allan, who in her role as Minister for Transport Infrastructure had overseen the SRL since its inception, was given the additional role of Minister for the Suburban Rail Loop.

Release of Business and Investment Case edit

 
Interactive map showing Suburban Rail Loop East in grey and its interaction with the existing lines of the Melbourne metropolitan rail network. Individual stations are not shown.

The Business and Investment Case of SRL was released in August 2021, primarily focusing on SRL East and North.[29] SRL East will commence building in 2022 and is expected to finish by 2035. The rail line will be fully underground between Cheltenham and the Airport, while SRL West is subject to further investigation, planning and development.

The business case modelled two staging scenarios. The first scenario has SRL North opening in two sections, the first from Box Hill to Reservoir opening in 2043 and the second between Reservoir and the Airport opening in 2053. This scenario has estimated capital costs of $24.1 to $40.2 billion and total costs of $30.7 to $50.5 billion, with estimated benefits of $48.5 to $58.7 billion.[30] The second scenario is faster but higher cost and has the section from Box Hill to Reservoir opening by 2038 and the full SRL North corridor from Box Hill to the Airport opening by 2043. This scenario had capital costs of $27.1 to $45.1 billion, total costs of $35.1 to $57.6 billion and benefits of $54.7 to $65.8 billion.[30] The timing and cost would be further refined through the tender and planning process. This gave the project a cost-benefit ratio range between 1.0 and 1.7.

The government stated that it expected $30 to $34.5 billion would be spent on the project over the 14 years to the opening of the first stage in 2035, with significant works on SRL North taking place as part of that expenditure.[2]

An Environmental Effects Statement (EES) process for SRL East was initiated in late 2021 that provided more detail on the station locations, the precinct designs, the local effects of the project and the design of the train system.[31] Community and stakeholder consultation was launched as part of this process.

In October 2021, the Minister for Transport Infrastructure Jacinta Allan introduced legislation to the Victorian Parliament to establish the Suburban Rail Loop Authority as a statutory government body and grant it a number of transport and planning powers.[32]

2022 state election campaign edit

Then Opposition Leader Matthew Guy announced he would cancel the Suburban Rail Loop if the Liberal party won the 2022 state election, arguing that the project was a waste of money.[33][34] The SRL became a major and contentious issue during the campaign, with Guy pledging to reallocated the saved money to health infrastructure.[35] Described by some commentators as a politically risky move in Melbourne's eastern suburbs that would be connected by the line, Guy committed to honour the $2.2 billion early works contract but reappropriate the remaining $9.6 billion allocated to the SRL by the government.[36] During the campaign, there was significant debate in the media over the project's cost and value for money.[37][38] After the Labor government won a third term at the election with an increased majority, then Premier Daniel Andrews said the result was the second clear endorsement of the project by Victorian voters.[39][40]

SRL East construction edit

 
Map showing the Melbourne metropolitan rail network, with SRL East shown as a dotted line. Early construction began in 2022 on SRL East, the project's first stage and the city's first stand-alone orbital rail line.

Early works edit

In November 2021, the State Government committed $9.3 billion in funding towards SRL East on top of $2.5 billion previously allocated for planning and early works.[41][42] Engineering firm Laing O'Rourke was awarded the contract to deliver early works, which were set to begin in 2022.[41]

In March 2022, a tender process was opened for two major works packages to deliver the SRL East tunnels.[43] The first is a 16 km (9.9 mi) tunnel contract between Cheltenham and Glen Waverley, the second is from Glen Waverley to Box Hill. The government announced that up to ten tunnel boring machines would be used to dig SRL East.[43]

In May 2022, prior to the 2022 Australian federal election, Labor leader Anthony Albanese pledged $2.2 billion in federal funding for the SRL if his party was elected.[44] Following the party's success at the election, the new Albanese Government allocated the money in its October 2022-3 budget.[45]

In June 2022, construction work began on the project with early works and utility relocations commencing at the Clayton precinct.[3][46][47] Early works in 2023 included the relocation of the tram terminus of Route 109 on Whitehorse Road in order to allow the excavation of the Box Hill SRL station, the preparation of a tunnel boring machine (TBM) launch site at Burwood, and the moving of water, sewerage, electricity and gas services at each station site.[48]

Major construction edit

In August 2022, the Victorian Environment Minister Lily D'Ambrosio approved the Environment Effects Statement planning process, meaning the project could proceed to other necessary planning approvals and towards major construction.[49][50] The approval recommended a number of extra actions by the SRLA to minimise impacts to local residents, including replacing open space on the project, limiting construction noise, additional cycling and walking connections, and more support for local businesses.[51]

In August 2023 a preferred bidder was announced for the first package of 16 km (9.9 mi) of SRL East tunnels between Cheltenham and Glen Waverley.[52][53] The Suburban Connect consortium consisted of the Australian construction firm CPB Contractors, Italian civil engineering company Ghella and the Spanish construction company Acciona.[53] The arrival of TBMs and the commencement of tunnelling was expected in 2026.[52] A second contract for the remaining 10 km (6.2 mi) of tunnelling was expected to be awarded in 2024.[53] At the same time the state government released a discussion paper for community consultation on precinct plans for the six stations on SRL East.[54][55]

Project description edit

 
The growth suburb of Box Hill is planned to become an important interchange on the SRL, with shops on the right set to be acquired for construction of the loop.

The 2021 Environmental Effects Statement outlined the key design elements of the project, saying the SRL would provide a high-frequency metro service with fully automated, four-car trains.[31] The trains would be approximately 93 metres long, 3.2 metres wide and 4 metres high, capable of an operating line speed of 100 kilometres per hour, running on an alternating current system.[31] This design differs from Melbourne's existing heavy rail system, which uses longer, heavier rolling-stock on a direct current power system.

The project has two initial stages, SRL East and SRL North, which will consist of 13 stations and twin tunnels running 60 km (37 mi) from Cheltenham in the city's south-east to Melbourne Airport in the north-west. The design of a future western stage from the airport to Werribee was not detailed in the project's 2021 business case.[29] SRL East will be the first section to be built, with planning and construction to move immediately onto SRL North.[29] SRL East from Cheltenham to Box Hill is planned to be open by 2035, with SRL North to then open in two stages, the first from Box Hill to Reservoir, and the second from Reservoir to Melbourne Airport.[29]

Stations will be two level, with large concourses and escalators, with interchanges to connecting train and bus services.[31] Stations are also set to include bicycle parking, over-site developments and broader precinct redevelopments.[31] A train stabling and maintenance facility is planned to be built in Heatherton on a former landfill site to accommodate the train fleet for both SRL East and North.[56][29]

Under state legislation passed in 2021, the Suburban Rail Loop Authority was given planning powers over the area 1.6 km (0.99 mi) from each SRL station.[57][58][59] This grants the authority the power to bypass local councils and rezone or develop land in the station precincts, allowing for increased housing and job density, a move that prompted criticism from councils.[59]

Proposed route edit

Suburban Rail Loop
 
 
 
 
 
 
Werribee
 
Intermediate stations
 
 
 
Sunshine
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Melbourne Airport
 
 
 
Broadmeadows  
 
 
 
 
 
 
 
 
 
Fawkner
 
 
 
 
 
 
 
 
 
Reservoir
 
 
 
 
 
 
 
 
 
 
 
Bundoora
 
 
 
Heidelberg
 
 
 
 
 
 
 
 
Doncaster
 
 
 
 
Box Hill
 
 
 
 
 
 
 
 
 
 
Burwood
 
 
 
Glen Waverley
 
 
 
 
 
 
Monash
 
 
 
Clayton
 
 
 
 
 
 
 
 
 
Heatherton Train Stabling Site
 
 
Southland
 
 
 
 


The SRL consists of four sections. SRL East and SRL North will form one continuous metro line stretching 60 km (37 mi) from Cheltenham to Melbourne Airport. The two western sections, SRL Airport and SRL West, are separate lines formed by distinct projects that would require an interchange to access.

The SRL Strategic Assessment produced by Development Victoria in 2018 identified four distinct sections of the route, some of which are formed by other projects or existing rail corridors. The overall corridor selected was originally identified as a "middle" corridor, and was assessed against other routes closer to and further from the CBD before being prioritised for further investigation.[60]

SRL East edit

SRL East will run between Southland station on the Frankston line and Box Hill station on the Belgrave and Lilydale lines and will be entirely underground along a new alignment.[61] From south to north, SRL East would also include stations at Clayton on the Dandenong rail corridor; Monash University's Clayton campus; Glen Waverley station, the terminus of Glen Waverley line; and Burwood, near the main campus of Deakin University.[62] Government press releases identify Clayton as the location of a "super-hub", allowing interchange between SRL services, frequent Dandenong corridor services, and regional Gippsland line services.[63]

A train stabling and maintenance depot will be built between Southland and Clayton stations in the suburb of Heatherton at the current Kingston Road landfill site.[64] The rail line will briefly surface to enter the depot, which will initially house 13 trains but will be large enough to accommodate 30.[64]

SRL East began construction in 2022 and is planned to open by 2035.[2]

SRL North edit

SRL North between Box Hill station and Melbourne Airport would be constructed after SRL East, and include stops at Doncaster, a middle suburb long proposed for the terminus of a new rail line; Heidelberg station on the Hurstbridge line; Reservoir station on the Mernda line; Bundoora, home to the main campus of La Trobe University; Broadmeadows station on the Craigieburn line; and the airport itself. This section of the SRL would also be constructed entirely underground, and Broadmeadows would function as a "super-hub" for the Seymour and North East regional lines.[65]

The 2021 SRL business case proposed opening SRL North in two stages, the first running from Box Hill to Reservoir and the second between Reservoir and Melbourne Airport.[29]

SRL Airport (Melbourne Airport Rail) edit

The under-construction Melbourne Airport rail link between the airport and Sunshine station will form the SRL Airport section of the loop, with one intermediate station at Keilor East. Trains will not continue onto Werribee, however, but will run into the Melbourne CBD via the Metro Tunnel.[66] Interchange would be required at Melbourne Airport station and Sunshine station to connect with other sections of the SRL.

This section would be mostly constructed along the existing railway corridor at surface level, commencing construction at the same time as the SRL East section in 2022.[67] It is planned to open in 2029.[66]

SRL West edit

Apart from the termini at Sunshine and Werribee, the Strategic Assessment did not identify specific routes, intermediate stations or connections to other lines for SRL West, and suggested it would be the final section constructed.[62] The Western Rail Plan published by Transport for Victoria in October 2018 suggested that the role of SRL West could be undertaken by electrifying the Deer Park – West Werribee line to Wyndham Vale station as an extension of the radial suburban network, and extending the Werribee line to meet it at Wyndham Vale.[68] Later documents released by the government confirmed that Wyndham Vale would become an interchange station.[24]

Reception edit

Political edit

Federal Infrastructure Minister Alan Tudge said that the Suburban Rail Loop's "big vision is great" but said the federal government would withhold its support until further details and costings of the plan were provided.[69]

Following the plan's original announcement, federal Labor leader Bill Shorten said that he "liked the principle" of the SRL, but would not immediately commit to supporting it with federal funding.[15] He announced federal Labor's official support in mid-October 2018, committing $300 million in business case funding and saying the project responded to an "old map of Melbourne... [that] simply doesn't work any more". His infrastructure spokesman, Anthony Albanese, said that "this project here in Melbourne is the most transformative project for any capital city in Australia".[19] Shorten later called the project the "Holy Grail" of public transport projects.[70]

State opposition treasury spokesman Michael O'Brien said that the SRL was a "plan for the next election rather than a plan for the next generation", and called on the government to send its plans to Infrastructure Victoria for independent costings and analysis.[15]

The plan was embraced by influential former Liberal premier Jeff Kennett, who called for bipartisan support for the project immediately after it was announced, despite expressing doubts about the accuracy of the $50 billion costing.[69]

At the election of November 2018, the traditionally Liberal-held seats of Mount Waverley, Burwood and Box Hill – all falling along the path of the SRL proposal – were claimed by the Labor Party after large swings, leading to speculation among Labor MPs and electoral commentators that the SRL announcement had contributed significantly to the government being returned with an increased majority. The phenomenon was also replicated in a number of safe Labor seats which would benefit from the line.[71][72] The project was also a major issue at the 2022 state election, where similar results were seen in Melbourne's east.

Media edit

The Age, in its editorial the day following the announcement, wrote that "there are so many reasons to endorse this proposal that it’s easy to get carried away", but observed that "good government is ultimately about more than just vision. It’s about having the inventiveness, discipline and fiscal capacity to make that vision reality", and suggested that the true test for the SRL would be the government's ability to complete it.[73] Herald Sun political editor Matt Johnston was less supportive of what he called a "highly political" project, arguing that the comparisons to other major global cities ignored the fact that "Australia is fairly remote, has a relatively small population and has higher labour costs". However, Johnston also noted that "the route of the suburban rail loop... would go near to, or through, Liberal-held state seats such as Mount Waverley and Burwood [and] near to, or through, federal Liberal seats such as Chisholm and Deakin".[74]

Experts and lobby groups edit

The SRL was warmly received by the Public Transport Users Association, with spokesman Daniel Bowen describing it as "Big City thinking" in an opinion piece.[75] Prominent public transport advocate Graham Currie also supported the plan for its potential to induce new development in the outer suburbs, although he admitted being stunned by the government's secretive planning process.[76] The Royal Automobile Club of Victoria also offered in-principle support, saying that "it makes sense for the state to protect a rail corridor through what is now 'middle Melbourne'", although it also argued that the SRL should not overshadow other improvements to the network such as Melbourne Metro 2.[77]

The SRL plan was criticised by rail lobby group the Rail Futures Institute, who argued that its benefits could be produced by a substantially cheaper network of orbital light rail routes.[78] Marion Terill of the Grattan Institute was also critical, saying that travel demand did not warrant the investment required for the SRL.[76]

Public edit

Media outlets reported massive levels of public support after the initial announcement of the plan.[76][79] An impromptu competition organised by The Age to redesign the Melbourne rail network map to incorporate the SRL received entries from leading cartographers and attracted thousands of public votes in the days after the announcement.[80]

Criticism edit

Cost edit

Both the plausibility and practicality of the government's initial headline $50 billion construction cost for the project were the subject of significant commentary at the time of the SRL's original announcement.

Political opponents suggested that the government had wildly understated the cost of the project, with former premier Jeff Kennett calling the figure "irresponsibly and fraudulently inaccurate",[69] state opposition spokesmen suggesting the cost could be between $50 and $100 billion,[81] and federal infrastructure minister Alan Tudge later saying he believed $100–150 billion was a more likely range.[82] Independent experts agreed that the project was likely to ultimately cost more than the government's claim.[76] Prominent transport commentator Daniel Bowen, in a "back of the envelope" analysis, concluded that the government was "close to the mark" but expressed reservations about the accuracy of his estimate.[83] All these estimates suggest the tunnel will be more expensive than the $16 billion Gotthard Base Tunnel through the Alps in Europe[84]

Separately, transport planners criticised the promises made by state and federal Labor for a total of $600 million in planning funding. The Age published comments from an engineer arguing that a "competent" business case could be completed for only $5 million.[85] Some commentary also questioned the capacity of the state to fund the project without severe impacts on its fiscal policy, irrespective of its actual cost.[85]

In 2022, Victoria's Parliamentary Budget Office (PBO) released analysis finding that the total construction and operating costs of SRL East and North together between 2022 and 2085 in 2022 dollars would be $29.214 billion, significantly less than other public estimates.[86] In nominal terms, not adjusted for yearly inflation, the PBO estimated that SRL East would cost $36.5 billion by 2035, but that SRL East and North would together cost $81.7 billion to build when the final section opens in 2053, and $125 billion when including 30 years of asset expenditure after opening to 2085.[87][88] The PBO analysis was requested by the State Opposition, and the large headline figure prompted calls in the media for the project to be shelved.[89] Minister Jacinta Allan dismissed the report, saying the Opposition framed the PBO request in order to obtain a large number, including unadjusted asset renewal expenses over fifty years.[90] The PBO found that while the SRL would cost $29.214 billion in 2022 dollars, its benefits would be only between $17.757 billion and $21.133 billion, meaning a cost-benefit ratio of between 0.6 and 0.7 using a 7% discount rate.[86]

Patronage edit

The Strategic Analysis released by the government in 2018 projects total daily trips on the SRL of 400,000 by 2051, making the line the busiest in Melbourne. It suggests that morning peak would have a 60:40 ratio of clockwise to counter-clockwise travel, with the balance reversed in the afternoon peak; by comparison, Melbourne's radial lines operate at a 90:10 ratio.[91]

Independent analysis of the plan by SGS Economics in the weeks following its release broadly supported the Strategic Assessment, noting that if the SRL had been in operation in 2018, a 2 km (1.2 mi) catchment around each station would have captured "roughly: 270,600 jobs, 416,100 residents, 212,300 workers, and 112,600 higher education students". It argued that SRL East, consequently, would have served 30,000–50,000 daily trips if in operation in 2018, with the qualification that the level of service provided would need to make travel time competitive with car journeys. However, it concluded that the benefits and potential patronage of the North-East and two western sections were more nebulous, as their impact would depend on the efficiency with which the project was leveraged to create new development.[92]

Transparency edit

The initiation of the project's eastern alignment has faced allegations of being a form of pork barrel politics, as it strategically aligns with marginal electorates in the Victorian Legislative Assembly. Notably, stations along the Suburban Rail Loop (SRL) East, such as Burwood and Box Hill, are situated within electorates that the Victorian Labor Party secured in the 2018 Victorian state election.[93] Furthermore, reviews conducted by the Victorian Ombudsman and the Victorian Auditor-General's office in 2023 and 2022, respectively, revealed shortcomings in the project's scrutiny and economic justification. Concerns were raised about the lack of transparency in the project's development and the appointment of ministerial staffers within the Victoria State Government.[94][95]

Environmental monitoring edit

Environment Protection Authority Victoria is in charge of evaluating the compliance of the project with environmental legislations and is doing so throughout all phases of the project. EPA can advise on issues such as:

  • air pollution
  • contaminated land
  • greenhouse gas emissions
  • human health
  • land planning and use
  • noise and vibration
  • water and groundwater[96]

Notes edit

  1. ^ This claim has been disputed; well-known public transport advocate Paul Mees argued that the assertion was "at best premature".[8]

References edit

  1. ^ Build, Victoria’s Big (26 October 2021). "Business and Investment Case". Victoria’s Big Build. from the original on 22 June 2022. Retrieved 13 May 2022.
  2. ^ a b c Premier of Victoria (19 August 2021). "Next Steps For Suburban Rail Loop". from the original on 22 January 2022. Retrieved 13 May 2022.
  3. ^ a b "Works Start Today On Victoria's Suburban Rail Loop | Premier of Victoria". www.premier.vic.gov.au. from the original on 1 June 2022. Retrieved 2 June 2022.
  4. ^ Burke, Matthew (1 March 2016). "Problems and Prospects for Public Transport Planning in Australian Cities". Built Environment. 42 (1): 37–54. doi:10.2148/benv.42.1.37.
  5. ^ Brown, Simon Leo (15 December 2014). "Outer Circle Line film tells of railway 'debacle'". ABC News. from the original on 26 August 2018. Retrieved 2 October 2018.
  6. ^ Webb, Carolyn (30 August 2018). "Heed the ghosts of Melbourne's railway lines past, says historian". The Age. from the original on 6 September 2018. Retrieved 2 October 2018.
  7. ^ Hopkins, Phillip (11 October 1999). "A ring road runs through it". The Age. p. 4.
  8. ^ Mees, Paul (2001). The short term effects of Melbourne's Western Ring Road (PDF). Australasian Transport Research Forum. Hobart. (PDF) from the original on 25 March 2016. Retrieved 25 October 2018.
  9. ^ Sexton, Reid (29 June 2008). "Relief as drivers get early start on road of success". The Age. p. 4.
  10. ^ Gardiner, Ashley (19 August 2010). "So you hoped Eastlink would make life easier, well think again Springvale Rd traffic jams as bad as ever". Herald Sun. p. 10.
  11. ^ Towell, Noel (9 September 2018). "North-East Link: Superhighway through Melbourne's east". The Age. from the original on 26 October 2018. Retrieved 25 October 2018.
  12. ^ Mees, Paul; Groenhart, Lucy (December 2012). "Transport Policy at the Crossroads: Travel to work in Australian capital cities 1976–2011". RMIT University: 21. {{cite journal}}: Cite journal requires |journal= (help)
  13. ^ Carey, Adam (27 October 2013). "The odyssey". The Sunday Age. from the original on 5 November 2018. Retrieved 25 October 2018.
  14. ^ Preiss, Benjamin (14 August 2018). "Victorian Labor promises biggest transport building program in Australia". The Age. from the original on 21 October 2018. Retrieved 25 October 2018.
  15. ^ a b c Jacks, Timna; Preiss, Benjamin (27 August 2018). "State government announces massive suburban rail loop for Melbourne". The Age. from the original on 5 November 2018. Retrieved 25 October 2018.
  16. ^ Hutchinson, Samantha; Varga, Remy (28 August 2018). "Victoria's Labor government announces $50bn mega rail". The Australian. Retrieved 25 October 2018.
  17. ^ Carey, Adam (29 August 2018). "Rail pledge makes claim to take politics out of planning sound hollow". The Age. from the original on 20 September 2018. Retrieved 25 October 2018.
  18. ^ "Melbourne Airport Rail Link market engagement begins". Railway Gazette. 13 September 2018. from the original on 13 September 2018. Retrieved 3 November 2018.
  19. ^ a b Durkin, Patrick (14 October 2018). "Shorten, Andrews on unity ticket for $50b rail loop". Australian Financial Review. from the original on 14 October 2018. Retrieved 3 November 2018.
  20. ^ Lund, Andrew (14 October 2018). "Victorian premier mulls more stations on Suburban Rail Loop". 9 News. from the original on 14 October 2018. Retrieved 3 November 2018.
  21. ^ Carey, Adam (16 October 2018). "Leaked rail plan shows few extra services for regional commuters". The Age. from the original on 24 January 2019. Retrieved 3 November 2018.
  22. ^ Jacks, Timna; Lucas, Clay (27 May 2019). "Victoria to write its own ticket for ambitious transport agenda". The Age. from the original on 8 August 2019. Retrieved 8 August 2019.
  23. ^ "Victoria opens ROI process for Suburban Rail Loop". Railway Technology. 16 June 2019. from the original on 8 August 2019. Retrieved 8 August 2019.
  24. ^ a b Jacks, Timna (23 July 2019). "Suburban Rail Loop work begins as geologists drill deep for $50b line". The Age. from the original on 8 August 2019. Retrieved 8 August 2019.
  25. ^ Preiss, Benjamin (3 September 2019). "Suburban rail line loops in three big interchanges as route firms up". The Age. from the original on 3 September 2019. Retrieved 3 September 2019.
  26. ^ a b "New Dedicated Trains For Standalone Suburban Rail Loop". Premier of Victoria. 24 November 2019. from the original on 15 November 2022. Retrieved 28 November 2019.
  27. ^ a b c Precel, Nicole (24 November 2019). "Daniel Andrews eyes private investors to fund Suburban Rail Link". The Age. from the original on 28 November 2019. Retrieved 28 November 2019.
  28. ^ Premier of Victoria (16 November 2020). "Works To Kick Off On The Suburban Rail Loop". from the original on 14 November 2022. Retrieved 13 May 2022.
  29. ^ a b c d e f "Business and Investment Case". Suburban Rail Loop. Victorian Government. from the original on 6 September 2021. Retrieved 6 September 2021.
  30. ^ a b Suburban Rail Loop Authority (August 2021). "SRL Business and Investment Case" (PDF). p. 308. (PDF) from the original on 12 March 2022. Retrieved 13 May 2022.
  31. ^ a b c d e Suburban Rail Loop Authority (November 2021). "Suburban Rail Loop Environmental Effects Statement". srleastees.vic.gov.au. from the original on 18 May 2022. Retrieved 13 May 2022.
  32. ^ "Suburban Rail Loop Bill 2021". www.legislation.vic.gov.au. from the original on 15 December 2022. Retrieved 13 May 2022.
  33. ^ Sakkal, Paul (17 August 2022). "Matthew Guy says Coalition will shelve 'dreamt up' Suburban Rail Loop". The Age. from the original on 17 August 2022. Retrieved 17 August 2022.
  34. ^ readAugust 17, Ewa StaszewskaDigital Reporter2 min; 2022 – 12:05pm (17 August 2022). "'Our state is sick': Guy's promise to fix Victoria's health system". skynews. from the original on 29 November 2022. Retrieved 29 November 2022.{{cite web}}: CS1 maint: numeric names: authors list (link)
  35. ^ "The Suburban Rail Loop: Will it be built and do Victorians want it to be?". www.9news.com.au. from the original on 29 November 2022. Retrieved 29 November 2022.
  36. ^ "Digging in: Matthew Guy's gamble on scrapping Victoria's suburban rail loop". The Guardian. 17 August 2022. from the original on 29 November 2022. Retrieved 29 November 2022.
  37. ^ McMillan, Clay Lucas, Ashleigh (28 August 2022). "Andrews questions inflated costs in Suburban Rail Loop analysis". The Age. from the original on 11 January 2023. Retrieved 11 January 2023.{{cite web}}: CS1 maint: multiple names: authors list (link)
  38. ^ "Victoria's auditor general pokes holes in Suburban Rail Loop business case". The Guardian. 21 September 2022. from the original on 11 January 2023. Retrieved 11 January 2023.
  39. ^ "Daniel Andrews says Labor victory confirms Victoria is nation's 'most progressive' state". ABC News. 26 November 2022. from the original on 28 November 2022. Retrieved 29 November 2022.
  40. ^ "Delivering For All Victorians With The Suburban Rail Loop | Premier of Victoria". www.premier.vic.gov.au. from the original on 29 November 2022. Retrieved 29 November 2022.
  41. ^ a b "VIC Government provides $9.3b funding for Suburban Rail Loop works". Infrastructure Magazine. 26 November 2021. from the original on 27 June 2022. Retrieved 13 May 2022.
  42. ^ "Massive Funding Boost Means SRL Build Starts Next Year | Premier of Victoria". www.premier.vic.gov.au. from the original on 17 March 2022. Retrieved 13 May 2022.
  43. ^ a b "New Tunnelling Packages And Community Fund For SRL | Premier of Victoria". www.premier.vic.gov.au. from the original on 28 March 2022. Retrieved 13 May 2022.
  44. ^ "What to know about Anthony Albanese's $2.2bn pledge for Victoria's Suburban Rail Loop". The Guardian. 10 May 2022. from the original on 29 November 2022. Retrieved 29 November 2022.
  45. ^ Gordon, Josh (25 October 2022). "Infrastructure cuts loom as Suburban Rail Loop grant evens up Victoria's ledger". The Sydney Morning Herald. from the original on 29 November 2022. Retrieved 29 November 2022.
  46. ^ Build, Victoria’s Big (2 June 2022). "Construction starts today on SRL East". Victoria’s Big Build. from the original on 12 August 2022. Retrieved 5 June 2022.
  47. ^ "Construction begins on Victoria's Suburban Rail Loop". Infrastructure Magazine. 2 June 2022. from the original on 2 June 2022. Retrieved 5 June 2022.
  48. ^ Build, Victoria’s Big (29 August 2023). "SRL construction blitz with works underway in Box Hill and Burwood". Victoria’s Big Build. Retrieved 31 August 2023.
  49. ^ "Suburban Rail Loop gets green light from environment minister". Ground Engineering (GE). 17 August 2022. from the original on 17 August 2022. Retrieved 17 August 2022.
  50. ^ Department of Environment, Land, Water and Planning (10 August 2022). "Suburban Rail Loop – East". Planning. from the original on 17 August 2022. Retrieved 17 August 2022.{{cite web}}: CS1 maint: multiple names: authors list (link)
  51. ^ Build, Victoria’s Big (11 August 2022). "Green light for Suburban Rail Loop East". Victoria’s Big Build. from the original on 17 August 2022. Retrieved 17 August 2022.
  52. ^ a b Build, Victoria’s Big (29 August 2023). "Preferred bidder announced for SRL East tunnelling contract". Victoria’s Big Build. Retrieved 31 August 2023.
  53. ^ a b c Duboudin, Tony (30 August 2023). "Preferred bidder named for Melbourne Suburban Rail Loop tunnelling". International Railway Journal. Retrieved 31 August 2023.
  54. ^ Chan, Ray (29 August 2023). "TBMs on the way for SRL". Rail Express. Retrieved 31 August 2023.
  55. ^ Build, Victoria’s Big (29 August 2023). "Planning for the future of SRL neighbourhoods". Victoria’s Big Build. Retrieved 31 August 2023.
  56. ^ Build, Victoria’s Big (16 November 2021). "SRL East: Train stabling facility fact sheet". Victoria’s Big Build. from the original on 17 August 2022. Retrieved 17 August 2022.
  57. ^ "Major planning changes under new Suburban Rail Loop law". www.holdingredlich.com. from the original on 8 December 2021. Retrieved 13 May 2022.
  58. ^ Waters, Cara (19 November 2021). "Streamlined or autocratic? Minister's planning powers gradually grow". The Age. from the original on 13 May 2022. Retrieved 13 May 2022.
  59. ^ a b Jacks, Timna (28 September 2021). "'Unconscionable': Councils fear government rail loop land grab". The Age. from the original on 13 May 2022. Retrieved 13 May 2022.
  60. ^ Suburban Rail Loop: Strategic Assessment (PDF). Development Victoria. 2018. p. 22. (PDF) from the original on 19 September 2018. Retrieved 3 November 2018.
  61. ^ Willingham, Richard. "Melbourne's new Suburban Rail Loop to start at Cheltenham, $2.2 billion announced for early works". from the original on 23 November 2020. Retrieved 24 November 2020.
  62. ^ a b Development Victoria 2018, p. 26.
  63. ^ "Rail loop set to connect Gippsland". from the original on 4 November 2018. Retrieved 3 November 2018.
  64. ^ a b Build, Victoria’s Big (30 October 2022). "Train stabling facility". Victoria’s Big Build. from the original on 25 February 2023. Retrieved 25 February 2023.
  65. ^ "Rail Loop Set To Connect North-East Victoria". Premier of Victoria. 28 August 2018. Retrieved 3 November 2018.
  66. ^ a b Build, Victoria’s Big (30 October 2022). "Melbourne Airport Rail overview". Victoria’s Big Build. from the original on 5 January 2023. Retrieved 31 October 2022.
  67. ^ "SRL Airport Takes Flight As Works Begin | Premier of Victoria". www.premier.vic.gov.au. from the original on 31 October 2022. Retrieved 30 October 2022.
  68. ^ Western Rail Plan (PDF). Transport for Victoria. 2018. p. 9. (PDF) from the original on 7 March 2019. Retrieved 3 November 2018.
  69. ^ a b c Jacks, Timna; Preiss, Benjamin (28 August 2018). "Crucial questions remain over cost of Melbourne's suburban rail loop". The Age. from the original on 5 November 2018. Retrieved 5 November 2018.
  70. ^ Eddie, Rachel (28 October 2018). "Victoria election: Daniel Andrews, Matthew Guy launch campaigns". The New Daily. from the original on 7 November 2018. Retrieved 3 November 2018.
  71. ^ Taylor, Alistair (25 November 2018). "Did the Suburban Rail Loop win the Victorian election for Labor?". Urban. from the original on 2 December 2018. Retrieved 2 December 2018.
  72. ^ Johnston, Matt; Dowling, James (26 November 2018). "How ALP rolled the rest". Herald Sun. p. 4.
  73. ^ "Suburban rail loop plan has lots of merit, but let's see the detail". The Age. 28 August 2018. from the original on 13 September 2018. Retrieved 3 November 2018.
  74. ^ Johnston, Matt (31 August 2018). "Dan's tunnel is likely to have plenty of twists". Herald Sun. p. 55.
  75. ^ Bowen, Daniel (28 August 2018). "This is Big City thinking, and should be applauded". The Age. from the original on 5 November 2018. Retrieved 3 November 2018.
  76. ^ a b c d "'A generation's worth of spending': Is the $50-billion rail loop a waste of money?". ABC News. 22 October 2018. from the original on 3 November 2018. Retrieved 3 November 2018.
  77. ^ Jones, Dave (September 2018). "Melbourne suburban rail loop analysis". RoyalAuto. Royal Automobile Club of Victoria. from the original on 5 November 2018. Retrieved 5 November 2018.
  78. ^ Jacks, Timna (6 September 2018). "What Melbourne's public transport could look like by 2050, according to the experts". The Age. from the original on 7 September 2018. Retrieved 3 November 2018.
  79. ^ Koob, Simone Fox (28 August 2018). "Melbourne suburban rail loop: What readers think". The Age. from the original on 6 September 2018. Retrieved 3 November 2018.
  80. ^ Booker, Chloe (5 September 2018). "Putting the rail loop on the map: Results in on your favourite design". The Age. from the original on 13 September 2018. Retrieved 3 November 2018.
  81. ^ Potter, Ben (28 August 2018). "Victorian state election: Daniel Andrews floats plan for $50b suburban rail loop". Australian Financial Review. from the original on 27 March 2019. Retrieved 31 December 2018.
  82. ^ Koziol, Michael (1 September 2018). "Alan Tudge backs 'a bigger Australia' as he eyes the demon of population policy". The Age. from the original on 31 December 2018. Retrieved 31 December 2018.
  83. ^ Bowen, Daniel (7 September 2018). "More thoughts on the suburban rail loop (Metro 3?) – Daniel Bowen dot com". danielbowen.com. from the original on 31 December 2018. Retrieved 31 December 2018.
  84. ^ "Swiss declare Alps tamed as longest rail tunnel opens with eclectic ceremony". www.abc.net.au. 1 June 2016. from the original on 24 November 2020. Retrieved 24 June 2020.
  85. ^ a b Lucas, Clay; Jacks, Timna (14 October 2018). "Hundreds of millions more to plan rail loop, but not all on board". The Age. from the original on 12 January 2019. Retrieved 13 January 2019.
  86. ^ a b Parliamentary Budget Office, Victoria (27 August 2022). "Suburban Rail Loop East and North – Value of continued investment". pbo.vic.gov.au. from the original on 25 February 2023. Retrieved 24 February 2023.
  87. ^ "Daniel Andrews defends Suburban Rail Loop amid claims it could cost more than double the original estimate". ABC News. 17 August 2022. from the original on 18 August 2022. Retrieved 18 August 2022.
  88. ^ Victorian Parliamentary Budget Office (18 August 2022). "Advice: Suburban Rail Loop East and North – Building and operating costs". pbo.vic.gov.au. from the original on 17 August 2022. Retrieved 18 August 2022.
  89. ^ Ilanbey, Sumeyya (18 August 2022). "'Where is the value for money?': Experts back call to shelve $125b rail loop". WAtoday. from the original on 18 August 2022. Retrieved 18 August 2022.
  90. ^ Clure, Elias (8 September 2022), Fears that Victoria's suburban rail loop project will have a massive cost blowout, 730: ABC News, from the original on 25 February 2023, retrieved 24 February 2023
  91. ^ Development Victoria 2018, p. 13.
  92. ^ Rawsley, Terry (2018). Will the $50b Suburban Rail Loop shape the Melbourne we want? (PDF). SGS Economics and Planning. pp. 9–10. (PDF) from the original on 27 February 2020. Retrieved 13 January 2019.
  93. ^ "Daniel Andrews' $50bn rail loop through marginal seats". The Australian. 29 August 2018.
  94. ^ Ore, Adeshola (21 September 2022). "Victoria's auditor general pokes holes in Suburban Rail Loop business case". The Guardian. ISSN 0261-3077. Retrieved 14 December 2023.
  95. ^ Kolovos, Benita; correspondent, Benita Kolovos Victoria state (6 December 2023). "'Creeping politicisation' in Victoria's public service needs 'urgent attention', ombudsman warns". The Guardian. ISSN 0261-3077. Retrieved 14 December 2023.
  96. ^ Victoria, Environment Protection Authority. "Suburban Rail Loop Project | Environment Protection Authority Victoria". www.epa.vic.gov.au. Retrieved 4 March 2024.

External links edit

  • Department of Transport – Suburban Rail Loop
  • Victoria's Big Build – Suburban Rail Loop
  • Suburban Rail Loop – Business and Investment Case
  • Suburban Rail Loop – Appendix B1: SRL Precinct Location Options Assessment Summary

suburban, rail, loop, group, rapid, transit, lines, planned, under, construction, melbourne, victoria, australia, project, divided, into, four, distinct, sections, main, sections, east, north, would, together, form, single, fully, automated, orbital, metro, li. The Suburban Rail Loop SRL is a group of new rapid transit lines planned or under construction in Melbourne Victoria Australia The project is divided into four distinct sections The two main sections SRL East and SRL North would together form a single 60 km 37 mi fully automated orbital metro line through the city s middle suburbs with 13 stations between Cheltenham and Melbourne Airport connecting to eight existing Melbourne rail lines SRL East is currently under construction and is planned to open in 2035 Suburban Rail LoopMap of Suburban Rail LoopOverviewStatusUnder construction SRL East OwnerVicTrack Projected LocaleMelbourne Victoria AustraliaTerminiCheltenhamBox Hill SRL East Melbourne Airport SRL North Werribee SRL West Stations6 SRL East 7 SRL North 2 SRL Airport TBD SRL West Websitesuburbanrailloop vic gov auServiceTypeRapid transitDepot s Heatherton Train Stabling SiteRolling stock4 car driverless trains SRL East amp SRL North High Capacity Metro Trains SRL Airport HistoryCommenced2022 SRL East SRL Airport Planned opening2035 SRL East 2043 53 SRL North TBD SRL Airport TBD SRL West Estimated cost 31 58 billionTechnicalLine length15 km 9 3 mi SRL Airport 26 km 16 mi SRL East 34 km 21 mi SRL North 90 km 56 mi total Number of tracks2CharacterUnderground SRL East and SRL North ElectrificationOverhead catenaryOperating speed100 km h 62 mph The SRL Airport section in the city s west would be formed by the separate Melbourne Airport rail link project which is being delivered separately by Rail Projects Victoria This section will run into the central business district via the Metro Tunnel The final section SRL West has not been defined in detail by the state government but would connect the city s outer western suburbs and may be formed by electrifying the existing Deer Park West Werribee railway line and extending it to Werribee station Several orbital rail schemes have been proposed and some constructed throughout Melbourne s history but the rail network has remained largely radial The Victorian Labor government led by Premier Daniel Andrews announced the SRL as policy in 2018 in the lead up that year s state election Initial planning for the SRL was carried out in secret prior to its announcement and when the plans were released it received significant attention The SRL plan was praised for its long term vision and ambition as well as being an innovative solution to the difficulties faced by Melbourne s transport network but criticised for its political motives and large cost SRL East and North would take more than 25 years to construct and together are estimated by the project s business case to cost between 30 7 and 57 6 billion depending on project staging of which capital costs would be between 24 1 and 45 1 billion 1 SRL East and North will be built entirely underground along new rail alignments while SRL Airport will be formed by the at grade and elevated Melbourne Airport rail link and funded separately In 2021 the Victorian government announced that the SRL East between Cheltenham and Box Hill would commence construction first and be open by 2035 2 On 2 June 2022 early works began on SRL East with major construction expected to commence in 2023 followed by tunnelling works in 2026 3 Contents 1 Background 2 History 2 1 Proposal 2 2 Planning 2 3 Release of Business and Investment Case 2 4 2022 state election campaign 3 SRL East construction 3 1 Early works 3 2 Major construction 4 Project description 5 Proposed route 5 1 SRL East 5 2 SRL North 5 3 SRL Airport Melbourne Airport Rail 5 4 SRL West 6 Reception 6 1 Political 6 2 Media 6 3 Experts and lobby groups 6 4 Public 7 Criticism 7 1 Cost 7 2 Patronage 7 3 Transparency 8 Environmental monitoring 9 Notes 10 References 11 External linksBackground edit nbsp The Suburban Rail Loop shown with proposed extensions to the Melbourne rail network See also Railways in Melbourne History and Transport in Melbourne The Melbourne transport network was substantially developed in the late 19th century when the newly available technology of the railway enabled population growth away from the city centre The result was the development of a largely radial network which over the following century reinforced a model of urban development focused on heavy daily commuter flows into and out of the CBD Furthermore a program of freeway construction in the wake of the 1969 Melbourne Transportation Plan reinforced the structure of the suburbs and introduced car dependence to new regions of development not served by the legacy rail network As a consequence Melbourne unlike many cities of comparable size did not develop any major centres of employment or dense population in its outlying regions over the course of the 20th century 4 A number of orbital lines were constructed at the peak of railway development but most failed to attract the necessary traffic of passengers and goods to remain sustainable into the late 20th century The Outer Circle which ran from Oakleigh on the Dandenong line to Fairfield on the Hurstbridge line via the Glen Waverley and Lilydale lines was constructed between 1888 and 1891 but closed by 1897 though it was partly reopened as the Alamein branch line 5 The Inner Circle linking the modern day Upfield and Mernda lines was opened in 1888 but closed to passengers in 1941 6 The Albion Jacana line and Newport Sunshine line in the city s west though performing a similar purpose were never intended to carry passenger traffic In the late 20th century interest grew in enabling orbital journeys between Melbourne suburbs Included in the 1969 Plan were a number of orbital freeways some of which were constructed over the following decades The M80 Ring Road through the outer western and northern suburbs was constructed in stages between 1989 and 1999 and by the time of its completion was claimed by its advocates to have been partly responsible for a massive economic boom in the western suburbs centred on its points of intersection with existing radial routes 7 a EastLink a similar orbital freeway through the eastern suburbs opened in 2008 9 but was less successful failing to reduce traffic meaningfully on parallel arterials such as Springvale Road 10 Detailed plans for the North East Link connecting the Ring Road and EastLink to complete the orbital route were released in 2018 with construction expected to start in 2020 for an anticipated completion date of 2027 11 Despite the investment in orbital road transport from 1990 little changed in the structure of the public transport network No new suburban railway lines after 1930 and trams were increasingly delayed by traffic congestion on key routes 12 From 2002 the SmartBus program introduced three orbital bus routes in an attempt to meet the city s burgeoning need for outer suburban public transport In addition to serving new corridors previously without mass transit the buses were operated at a relatively high frequency and along direct routes in contrast to the existing network of infrequent and circuitous routes As a result the SmartBus routes became the most heavily used in Melbourne and were widely praised as a model for recasting the future public transport network 13 History editProposal edit In August 2018 three months prior to the 2018 Victorian state election then Premier Daniel Andrews promised that a re elected Labor government would undertake the biggest public transport building program in Australian history in a speech to the Committee for Economic Development of Australia The comments were interpreted as a hint that as yet unannounced projects would be revealed closer to the election although Andrews provided no detail in his speech 14 On 27 August Andrews revealed plans for the Suburban Rail Loop for the first time a 90 km 56 mi orbital line for Melbourne s rail network connecting 11 of the city s existing rail lines and serving new regions of the middle and outer suburbs at an estimated cost of 50 billion 15 The government committed 300 million to complete a business case and feasibility study should it be re elected noting that the project would take several terms of government to complete 16 In the days following the proposal the government revealed that its plan had been under consideration within Development Victoria a planning agency under the Department of Environment Land Water and Planning for 12 months Controversially neither Infrastructure Victoria nor Transport for Victoria both established by the Andrews government had been involved in the SRL s planning stages furthermore neither agency had identified the need for a similar project in their long term plans for the transport network Andrews defended the decision to develop the SRL independently of infrastructure authorities arguing that while Infrastructure Victoria have lots of good ideas they don t have every good idea 17 The tender process for the Melbourne Airport rail link project was launched in mid September and the state government confirmed that it anticipated the airport link would form part of the SRL West with construction beginning in 2022 18 In mid October Labor federal Leader of the Opposition Bill Shorten announced support for the SRL including a commitment for 300 million in initial federal funding should the Labor Party be elected 19 The state government also indicated that it would be prepared to add additional stops to the loop to those included in the original announcement particularly in the western suburbs 20 Days later a leaked document from Transport for Victoria showed that the SRL had not been included in the transport authority s long term plan for the rail network 21 Planning edit 300 million was allocated to planning works for the SRL in the 2019 state budget 22 Rail Projects Victoria announced registrations of interest for potential contractors were open in June 23 and the first geotechnical investigations began in July in Box Hill 24 The state government announced the formation of a Suburban Rail Loop Authority in September at the same time as confirming station precincts for SRL East 25 In November 2019 the government announced that the loop would be an operationally independent standalone line using different rail technology from the existing suburban rail network 26 27 The system would use new smaller metro rollingstock that is four to five carriages long allowing shorter platforms 27 26 The Premier announced an intention to use private investment to help fund the line but did not indicate whether the line would be driverless 27 In 2020 the government committed a further 2 2 billion for initial and early works on the loop with expressions of interest opened for contractors to deliver these works 28 Jacinta Allan who in her role as Minister for Transport Infrastructure had overseen the SRL since its inception was given the additional role of Minister for the Suburban Rail Loop Release of Business and Investment Case edit nbsp Interactive map showing Suburban Rail Loop East in grey and its interaction with the existing lines of the Melbourne metropolitan rail network Individual stations are not shown The Business and Investment Case of SRL was released in August 2021 primarily focusing on SRL East and North 29 SRL East will commence building in 2022 and is expected to finish by 2035 The rail line will be fully underground between Cheltenham and the Airport while SRL West is subject to further investigation planning and development The business case modelled two staging scenarios The first scenario has SRL North opening in two sections the first from Box Hill to Reservoir opening in 2043 and the second between Reservoir and the Airport opening in 2053 This scenario has estimated capital costs of 24 1 to 40 2 billion and total costs of 30 7 to 50 5 billion with estimated benefits of 48 5 to 58 7 billion 30 The second scenario is faster but higher cost and has the section from Box Hill to Reservoir opening by 2038 and the full SRL North corridor from Box Hill to the Airport opening by 2043 This scenario had capital costs of 27 1 to 45 1 billion total costs of 35 1 to 57 6 billion and benefits of 54 7 to 65 8 billion 30 The timing and cost would be further refined through the tender and planning process This gave the project a cost benefit ratio range between 1 0 and 1 7 The government stated that it expected 30 to 34 5 billion would be spent on the project over the 14 years to the opening of the first stage in 2035 with significant works on SRL North taking place as part of that expenditure 2 An Environmental Effects Statement EES process for SRL East was initiated in late 2021 that provided more detail on the station locations the precinct designs the local effects of the project and the design of the train system 31 Community and stakeholder consultation was launched as part of this process In October 2021 the Minister for Transport Infrastructure Jacinta Allan introduced legislation to the Victorian Parliament to establish the Suburban Rail Loop Authority as a statutory government body and grant it a number of transport and planning powers 32 2022 state election campaign edit Then Opposition Leader Matthew Guy announced he would cancel the Suburban Rail Loop if the Liberal party won the 2022 state election arguing that the project was a waste of money 33 34 The SRL became a major and contentious issue during the campaign with Guy pledging to reallocated the saved money to health infrastructure 35 Described by some commentators as a politically risky move in Melbourne s eastern suburbs that would be connected by the line Guy committed to honour the 2 2 billion early works contract but reappropriate the remaining 9 6 billion allocated to the SRL by the government 36 During the campaign there was significant debate in the media over the project s cost and value for money 37 38 After the Labor government won a third term at the election with an increased majority then Premier Daniel Andrews said the result was the second clear endorsement of the project by Victorian voters 39 40 SRL East construction edit nbsp Map showing the Melbourne metropolitan rail network with SRL East shown as a dotted line Early construction began in 2022 on SRL East the project s first stage and the city s first stand alone orbital rail line Early works edit In November 2021 the State Government committed 9 3 billion in funding towards SRL East on top of 2 5 billion previously allocated for planning and early works 41 42 Engineering firm Laing O Rourke was awarded the contract to deliver early works which were set to begin in 2022 41 In March 2022 a tender process was opened for two major works packages to deliver the SRL East tunnels 43 The first is a 16 km 9 9 mi tunnel contract between Cheltenham and Glen Waverley the second is from Glen Waverley to Box Hill The government announced that up to ten tunnel boring machines would be used to dig SRL East 43 In May 2022 prior to the 2022 Australian federal election Labor leader Anthony Albanese pledged 2 2 billion in federal funding for the SRL if his party was elected 44 Following the party s success at the election the new Albanese Government allocated the money in its October 2022 3 budget 45 In June 2022 construction work began on the project with early works and utility relocations commencing at the Clayton precinct 3 46 47 Early works in 2023 included the relocation of the tram terminus of Route 109 on Whitehorse Road in order to allow the excavation of the Box Hill SRL station the preparation of a tunnel boring machine TBM launch site at Burwood and the moving of water sewerage electricity and gas services at each station site 48 Major construction edit In August 2022 the Victorian Environment Minister Lily D Ambrosio approved the Environment Effects Statement planning process meaning the project could proceed to other necessary planning approvals and towards major construction 49 50 The approval recommended a number of extra actions by the SRLA to minimise impacts to local residents including replacing open space on the project limiting construction noise additional cycling and walking connections and more support for local businesses 51 In August 2023 a preferred bidder was announced for the first package of 16 km 9 9 mi of SRL East tunnels between Cheltenham and Glen Waverley 52 53 The Suburban Connect consortium consisted of the Australian construction firm CPB Contractors Italian civil engineering company Ghella and the Spanish construction company Acciona 53 The arrival of TBMs and the commencement of tunnelling was expected in 2026 52 A second contract for the remaining 10 km 6 2 mi of tunnelling was expected to be awarded in 2024 53 At the same time the state government released a discussion paper for community consultation on precinct plans for the six stations on SRL East 54 55 Project description edit nbsp The growth suburb of Box Hill is planned to become an important interchange on the SRL with shops on the right set to be acquired for construction of the loop The 2021 Environmental Effects Statement outlined the key design elements of the project saying the SRL would provide a high frequency metro service with fully automated four car trains 31 The trains would be approximately 93 metres long 3 2 metres wide and 4 metres high capable of an operating line speed of 100 kilometres per hour running on an alternating current system 31 This design differs from Melbourne s existing heavy rail system which uses longer heavier rolling stock on a direct current power system The project has two initial stages SRL East and SRL North which will consist of 13 stations and twin tunnels running 60 km 37 mi from Cheltenham in the city s south east to Melbourne Airport in the north west The design of a future western stage from the airport to Werribee was not detailed in the project s 2021 business case 29 SRL East will be the first section to be built with planning and construction to move immediately onto SRL North 29 SRL East from Cheltenham to Box Hill is planned to be open by 2035 with SRL North to then open in two stages the first from Box Hill to Reservoir and the second from Reservoir to Melbourne Airport 29 Stations will be two level with large concourses and escalators with interchanges to connecting train and bus services 31 Stations are also set to include bicycle parking over site developments and broader precinct redevelopments 31 A train stabling and maintenance facility is planned to be built in Heatherton on a former landfill site to accommodate the train fleet for both SRL East and North 56 29 Under state legislation passed in 2021 the Suburban Rail Loop Authority was given planning powers over the area 1 6 km 0 99 mi from each SRL station 57 58 59 This grants the authority the power to bypass local councils and rezone or develop land in the station precincts allowing for increased housing and job density a move that prompted criticism from councils 59 Proposed route editvteSuburban Rail LoopLegend nbsp nbsp nbsp nbsp Werribee line nbsp Hoppers Crossing Freight nbsp nbsp nbsp Werribee nbsp Intermediate stations nbsp nbsp nbsp Sunshine nbsp nbsp nbsp nbsp nbsp nbsp nbsp Sunbury Airport Bendigo Ballarat Geelong lines nbsp Tottenham Albion Ardeer nbsp nbsp nbsp nbsp nbsp Maribyrnong River nbsp Keilor East nbsp nbsp nbsp nbsp nbsp nbsp Melbourne Airport nbsp nbsp nbsp Broadmeadows nbsp nbsp nbsp nbsp nbsp nbsp nbsp Craigieburn Seymour Albury Sydney lines nbsp Jacana Coolaroo nbsp nbsp nbsp nbsp Fawkner nbsp nbsp nbsp nbsp nbsp nbsp Upfield line nbsp Merlynston Gowrie nbsp nbsp nbsp nbsp Reservoir nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp Mernda line nbsp Regent Ruthven nbsp nbsp nbsp Bundoora nbsp nbsp nbsp Heidelberg nbsp nbsp nbsp nbsp nbsp nbsp Hurstbridge line nbsp Eaglemont Rosanna nbsp nbsp Yarra River nbsp Doncaster nbsp nbsp nbsp nbsp Box Hill nbsp nbsp nbsp nbsp nbsp nbsp nbsp nbsp Belgrave Lilydale lines nbsp Union Laburnum nbsp nbsp nbsp Burwood nbsp nbsp nbsp Glen Waverley nbsp nbsp nbsp nbsp nbsp Glen Waverley line nbsp Syndal nbsp Monash nbsp nbsp nbsp Clayton nbsp nbsp nbsp nbsp nbsp nbsp nbsp Pakenham Cranbourne Traralgon lines nbsp Huntingdale Westall nbsp nbsp nbsp Heatherton Train Stabling Site nbsp nbsp Southland nbsp nbsp nbsp nbsp Frankston line nbsp Highett Cheltenham nbsp The SRL consists of four sections SRL East and SRL North will form one continuous metro line stretching 60 km 37 mi from Cheltenham to Melbourne Airport The two western sections SRL Airport and SRL West are separate lines formed by distinct projects that would require an interchange to access The SRL Strategic Assessment produced by Development Victoria in 2018 identified four distinct sections of the route some of which are formed by other projects or existing rail corridors The overall corridor selected was originally identified as a middle corridor and was assessed against other routes closer to and further from the CBD before being prioritised for further investigation 60 SRL East edit SRL East will run between Southland station on the Frankston line and Box Hill station on the Belgrave and Lilydale lines and will be entirely underground along a new alignment 61 From south to north SRL East would also include stations at Clayton on the Dandenong rail corridor Monash University s Clayton campus Glen Waverley station the terminus of Glen Waverley line and Burwood near the main campus of Deakin University 62 Government press releases identify Clayton as the location of a super hub allowing interchange between SRL services frequent Dandenong corridor services and regional Gippsland line services 63 A train stabling and maintenance depot will be built between Southland and Clayton stations in the suburb of Heatherton at the current Kingston Road landfill site 64 The rail line will briefly surface to enter the depot which will initially house 13 trains but will be large enough to accommodate 30 64 SRL East began construction in 2022 and is planned to open by 2035 2 SRL North edit SRL North between Box Hill station and Melbourne Airport would be constructed after SRL East and include stops at Doncaster a middle suburb long proposed for the terminus of a new rail line Heidelberg station on the Hurstbridge line Reservoir station on the Mernda line Bundoora home to the main campus of La Trobe University Broadmeadows station on the Craigieburn line and the airport itself This section of the SRL would also be constructed entirely underground and Broadmeadows would function as a super hub for the Seymour and North East regional lines 65 The 2021 SRL business case proposed opening SRL North in two stages the first running from Box Hill to Reservoir and the second between Reservoir and Melbourne Airport 29 SRL Airport Melbourne Airport Rail edit Main article Melbourne Airport rail link The under construction Melbourne Airport rail link between the airport and Sunshine station will form the SRL Airport section of the loop with one intermediate station at Keilor East Trains will not continue onto Werribee however but will run into the Melbourne CBD via the Metro Tunnel 66 Interchange would be required at Melbourne Airport station and Sunshine station to connect with other sections of the SRL This section would be mostly constructed along the existing railway corridor at surface level commencing construction at the same time as the SRL East section in 2022 67 It is planned to open in 2029 66 SRL West edit Apart from the termini at Sunshine and Werribee the Strategic Assessment did not identify specific routes intermediate stations or connections to other lines for SRL West and suggested it would be the final section constructed 62 The Western Rail Plan published by Transport for Victoria in October 2018 suggested that the role of SRL West could be undertaken by electrifying the Deer Park West Werribee line to Wyndham Vale station as an extension of the radial suburban network and extending the Werribee line to meet it at Wyndham Vale 68 Later documents released by the government confirmed that Wyndham Vale would become an interchange station 24 Reception editPolitical edit Federal Infrastructure Minister Alan Tudge said that the Suburban Rail Loop s big vision is great but said the federal government would withhold its support until further details and costings of the plan were provided 69 Following the plan s original announcement federal Labor leader Bill Shorten said that he liked the principle of the SRL but would not immediately commit to supporting it with federal funding 15 He announced federal Labor s official support in mid October 2018 committing 300 million in business case funding and saying the project responded to an old map of Melbourne that simply doesn t work any more His infrastructure spokesman Anthony Albanese said that this project here in Melbourne is the most transformative project for any capital city in Australia 19 Shorten later called the project the Holy Grail of public transport projects 70 State opposition treasury spokesman Michael O Brien said that the SRL was a plan for the next election rather than a plan for the next generation and called on the government to send its plans to Infrastructure Victoria for independent costings and analysis 15 The plan was embraced by influential former Liberal premier Jeff Kennett who called for bipartisan support for the project immediately after it was announced despite expressing doubts about the accuracy of the 50 billion costing 69 At the election of November 2018 the traditionally Liberal held seats of Mount Waverley Burwood and Box Hill all falling along the path of the SRL proposal were claimed by the Labor Party after large swings leading to speculation among Labor MPs and electoral commentators that the SRL announcement had contributed significantly to the government being returned with an increased majority The phenomenon was also replicated in a number of safe Labor seats which would benefit from the line 71 72 The project was also a major issue at the 2022 state election where similar results were seen in Melbourne s east Media edit The Age in its editorial the day following the announcement wrote that there are so many reasons to endorse this proposal that it s easy to get carried away but observed that good government is ultimately about more than just vision It s about having the inventiveness discipline and fiscal capacity to make that vision reality and suggested that the true test for the SRL would be the government s ability to complete it 73 Herald Sun political editor Matt Johnston was less supportive of what he called a highly political project arguing that the comparisons to other major global cities ignored the fact that Australia is fairly remote has a relatively small population and has higher labour costs However Johnston also noted that the route of the suburban rail loop would go near to or through Liberal held state seats such as Mount Waverley and Burwood and near to or through federal Liberal seats such as Chisholm and Deakin 74 Experts and lobby groups edit The SRL was warmly received by the Public Transport Users Association with spokesman Daniel Bowen describing it as Big City thinking in an opinion piece 75 Prominent public transport advocate Graham Currie also supported the plan for its potential to induce new development in the outer suburbs although he admitted being stunned by the government s secretive planning process 76 The Royal Automobile Club of Victoria also offered in principle support saying that it makes sense for the state to protect a rail corridor through what is now middle Melbourne although it also argued that the SRL should not overshadow other improvements to the network such as Melbourne Metro 2 77 The SRL plan was criticised by rail lobby group the Rail Futures Institute who argued that its benefits could be produced by a substantially cheaper network of orbital light rail routes 78 Marion Terill of the Grattan Institute was also critical saying that travel demand did not warrant the investment required for the SRL 76 Public edit Media outlets reported massive levels of public support after the initial announcement of the plan 76 79 An impromptu competition organised by The Age to redesign the Melbourne rail network map to incorporate the SRL received entries from leading cartographers and attracted thousands of public votes in the days after the announcement 80 Criticism editCost edit Both the plausibility and practicality of the government s initial headline 50 billion construction cost for the project were the subject of significant commentary at the time of the SRL s original announcement Political opponents suggested that the government had wildly understated the cost of the project with former premier Jeff Kennett calling the figure irresponsibly and fraudulently inaccurate 69 state opposition spokesmen suggesting the cost could be between 50 and 100 billion 81 and federal infrastructure minister Alan Tudge later saying he believed 100 150 billion was a more likely range 82 Independent experts agreed that the project was likely to ultimately cost more than the government s claim 76 Prominent transport commentator Daniel Bowen in a back of the envelope analysis concluded that the government was close to the mark but expressed reservations about the accuracy of his estimate 83 All these estimates suggest the tunnel will be more expensive than the 16 billion Gotthard Base Tunnel through the Alps in Europe 84 Separately transport planners criticised the promises made by state and federal Labor for a total of 600 million in planning funding The Age published comments from an engineer arguing that a competent business case could be completed for only 5 million 85 Some commentary also questioned the capacity of the state to fund the project without severe impacts on its fiscal policy irrespective of its actual cost 85 In 2022 Victoria s Parliamentary Budget Office PBO released analysis finding that the total construction and operating costs of SRL East and North together between 2022 and 2085 in 2022 dollars would be 29 214 billion significantly less than other public estimates 86 In nominal terms not adjusted for yearly inflation the PBO estimated that SRL East would cost 36 5 billion by 2035 but that SRL East and North would together cost 81 7 billion to build when the final section opens in 2053 and 125 billion when including 30 years of asset expenditure after opening to 2085 87 88 The PBO analysis was requested by the State Opposition and the large headline figure prompted calls in the media for the project to be shelved 89 Minister Jacinta Allan dismissed the report saying the Opposition framed the PBO request in order to obtain a large number including unadjusted asset renewal expenses over fifty years 90 The PBO found that while the SRL would cost 29 214 billion in 2022 dollars its benefits would be only between 17 757 billion and 21 133 billion meaning a cost benefit ratio of between 0 6 and 0 7 using a 7 discount rate 86 Patronage edit The Strategic Analysis released by the government in 2018 projects total daily trips on the SRL of 400 000 by 2051 making the line the busiest in Melbourne It suggests that morning peak would have a 60 40 ratio of clockwise to counter clockwise travel with the balance reversed in the afternoon peak by comparison Melbourne s radial lines operate at a 90 10 ratio 91 Independent analysis of the plan by SGS Economics in the weeks following its release broadly supported the Strategic Assessment noting that if the SRL had been in operation in 2018 a 2 km 1 2 mi catchment around each station would have captured roughly 270 600 jobs 416 100 residents 212 300 workers and 112 600 higher education students It argued that SRL East consequently would have served 30 000 50 000 daily trips if in operation in 2018 with the qualification that the level of service provided would need to make travel time competitive with car journeys However it concluded that the benefits and potential patronage of the North East and two western sections were more nebulous as their impact would depend on the efficiency with which the project was leveraged to create new development 92 Transparency edit The initiation of the project s eastern alignment has faced allegations of being a form of pork barrel politics as it strategically aligns with marginal electorates in the Victorian Legislative Assembly Notably stations along the Suburban Rail Loop SRL East such as Burwood and Box Hill are situated within electorates that the Victorian Labor Party secured in the 2018 Victorian state election 93 Furthermore reviews conducted by the Victorian Ombudsman and the Victorian Auditor General s office in 2023 and 2022 respectively revealed shortcomings in the project s scrutiny and economic justification Concerns were raised about the lack of transparency in the project s development and the appointment of ministerial staffers within the Victoria State Government 94 95 Environmental monitoring editEnvironment Protection Authority Victoria is in charge of evaluating the compliance of the project with environmental legislations and is doing so throughout all phases of the project EPA can advise on issues such as air pollution contaminated land greenhouse gas emissions human health land planning and use noise and vibration water and groundwater 96 Notes edit This claim has been disputed well known public transport advocate Paul Mees argued that the assertion was at best premature 8 References edit Build Victoria s Big 26 October 2021 Business and Investment Case Victoria s Big Build Archived from the original on 22 June 2022 Retrieved 13 May 2022 a b c Premier of Victoria 19 August 2021 Next Steps For Suburban Rail Loop Archived from the original on 22 January 2022 Retrieved 13 May 2022 a b Works Start Today On Victoria s Suburban Rail Loop Premier of Victoria www premier vic gov au Archived from the original on 1 June 2022 Retrieved 2 June 2022 Burke Matthew 1 March 2016 Problems and Prospects for Public Transport Planning in Australian Cities Built Environment 42 1 37 54 doi 10 2148 benv 42 1 37 Brown Simon Leo 15 December 2014 Outer Circle Line film tells of railway debacle ABC News Archived from the original on 26 August 2018 Retrieved 2 October 2018 Webb Carolyn 30 August 2018 Heed the ghosts of Melbourne s railway lines past says historian The Age Archived from the original on 6 September 2018 Retrieved 2 October 2018 Hopkins Phillip 11 October 1999 A ring road runs through it The Age p 4 Mees Paul 2001 The short term effects of Melbourne s Western Ring Road PDF Australasian Transport Research Forum Hobart Archived PDF from the original on 25 March 2016 Retrieved 25 October 2018 Sexton Reid 29 June 2008 Relief as drivers get early start on road of success The Age p 4 Gardiner Ashley 19 August 2010 So you hoped Eastlink would make life easier well think again Springvale Rd traffic jams as bad as ever Herald Sun p 10 Towell Noel 9 September 2018 North East Link Superhighway through Melbourne s east The Age Archived from the original on 26 October 2018 Retrieved 25 October 2018 Mees Paul Groenhart Lucy December 2012 Transport Policy at the Crossroads Travel to work in Australian capital cities 1976 2011 RMIT University 21 a href Template Cite journal html title Template Cite journal cite journal a Cite journal requires journal help Carey Adam 27 October 2013 The odyssey The Sunday Age Archived from the original on 5 November 2018 Retrieved 25 October 2018 Preiss Benjamin 14 August 2018 Victorian Labor promises biggest transport building program in Australia The Age Archived from the original on 21 October 2018 Retrieved 25 October 2018 a b c Jacks Timna Preiss Benjamin 27 August 2018 State government announces massive suburban rail loop for Melbourne The Age Archived from the original on 5 November 2018 Retrieved 25 October 2018 Hutchinson Samantha Varga Remy 28 August 2018 Victoria s Labor government announces 50bn mega rail The Australian Retrieved 25 October 2018 Carey Adam 29 August 2018 Rail pledge makes claim to take politics out of planning sound hollow The Age Archived from the original on 20 September 2018 Retrieved 25 October 2018 Melbourne Airport Rail Link market engagement begins Railway Gazette 13 September 2018 Archived from the original on 13 September 2018 Retrieved 3 November 2018 a b Durkin Patrick 14 October 2018 Shorten Andrews on unity ticket for 50b rail loop Australian Financial Review Archived from the original on 14 October 2018 Retrieved 3 November 2018 Lund Andrew 14 October 2018 Victorian premier mulls more stations on Suburban Rail Loop 9 News Archived from the original on 14 October 2018 Retrieved 3 November 2018 Carey Adam 16 October 2018 Leaked rail plan shows few extra services for regional commuters The Age Archived from the original on 24 January 2019 Retrieved 3 November 2018 Jacks Timna Lucas Clay 27 May 2019 Victoria to write its own ticket for ambitious transport agenda The Age Archived from the original on 8 August 2019 Retrieved 8 August 2019 Victoria opens ROI process for Suburban Rail Loop Railway Technology 16 June 2019 Archived from the original on 8 August 2019 Retrieved 8 August 2019 a b Jacks Timna 23 July 2019 Suburban Rail Loop work begins as geologists drill deep for 50b line The Age Archived from the original on 8 August 2019 Retrieved 8 August 2019 Preiss Benjamin 3 September 2019 Suburban rail line loops in three big interchanges as route firms up The Age Archived from the original on 3 September 2019 Retrieved 3 September 2019 a b New Dedicated Trains For Standalone Suburban Rail Loop Premier of Victoria 24 November 2019 Archived from the original on 15 November 2022 Retrieved 28 November 2019 a b c Precel Nicole 24 November 2019 Daniel Andrews eyes private investors to fund Suburban Rail Link The Age Archived from the original on 28 November 2019 Retrieved 28 November 2019 Premier of Victoria 16 November 2020 Works To Kick Off On The Suburban Rail Loop Archived from the original on 14 November 2022 Retrieved 13 May 2022 a b c d e f Business and Investment Case Suburban Rail Loop Victorian Government Archived from the original on 6 September 2021 Retrieved 6 September 2021 a b Suburban Rail Loop Authority August 2021 SRL Business and Investment Case PDF p 308 Archived PDF from the original on 12 March 2022 Retrieved 13 May 2022 a b c d e Suburban Rail Loop Authority November 2021 Suburban Rail Loop Environmental Effects Statement srleastees vic gov au Archived from the original on 18 May 2022 Retrieved 13 May 2022 Suburban Rail Loop Bill 2021 www legislation vic gov au Archived from the original on 15 December 2022 Retrieved 13 May 2022 Sakkal Paul 17 August 2022 Matthew Guy says Coalition will shelve dreamt up Suburban Rail Loop The Age Archived from the original on 17 August 2022 Retrieved 17 August 2022 readAugust 17 Ewa StaszewskaDigital Reporter2 min 2022 12 05pm 17 August 2022 Our state is sick Guy s promise to fix Victoria s health system skynews Archived from the original on 29 November 2022 Retrieved 29 November 2022 a href Template Cite web html title Template Cite web cite web a CS1 maint numeric names authors list link The Suburban Rail Loop Will it be built and do Victorians want it to be www 9news com au Archived from the original on 29 November 2022 Retrieved 29 November 2022 Digging in Matthew Guy s gamble on scrapping Victoria s suburban rail loop The Guardian 17 August 2022 Archived from the original on 29 November 2022 Retrieved 29 November 2022 McMillan Clay Lucas Ashleigh 28 August 2022 Andrews questions inflated costs in Suburban Rail Loop analysis The Age Archived from the original on 11 January 2023 Retrieved 11 January 2023 a href Template Cite web html title Template Cite web cite web a CS1 maint multiple names authors list link Victoria s auditor general pokes holes in Suburban Rail Loop business case The Guardian 21 September 2022 Archived from the original on 11 January 2023 Retrieved 11 January 2023 Daniel Andrews says Labor victory confirms Victoria is nation s most progressive state ABC News 26 November 2022 Archived from the original on 28 November 2022 Retrieved 29 November 2022 Delivering For All Victorians With The Suburban Rail Loop Premier of Victoria www premier vic gov au Archived from the original on 29 November 2022 Retrieved 29 November 2022 a b VIC Government provides 9 3b funding for Suburban Rail Loop works Infrastructure Magazine 26 November 2021 Archived from the original on 27 June 2022 Retrieved 13 May 2022 Massive Funding Boost Means SRL Build Starts Next Year Premier of Victoria www premier vic gov au Archived from the original on 17 March 2022 Retrieved 13 May 2022 a b New Tunnelling Packages And Community Fund For SRL Premier of Victoria www premier vic gov au Archived from the original on 28 March 2022 Retrieved 13 May 2022 What to know about Anthony Albanese s 2 2bn pledge for Victoria s Suburban Rail Loop The Guardian 10 May 2022 Archived from the original on 29 November 2022 Retrieved 29 November 2022 Gordon Josh 25 October 2022 Infrastructure cuts loom as Suburban Rail Loop grant evens up Victoria s ledger The Sydney Morning Herald Archived from the original on 29 November 2022 Retrieved 29 November 2022 Build Victoria s Big 2 June 2022 Construction starts today on SRL East Victoria s Big Build Archived from the original on 12 August 2022 Retrieved 5 June 2022 Construction begins on Victoria s Suburban Rail Loop Infrastructure Magazine 2 June 2022 Archived from the original on 2 June 2022 Retrieved 5 June 2022 Build Victoria s Big 29 August 2023 SRL construction blitz with works underway in Box Hill and Burwood Victoria s Big Build Retrieved 31 August 2023 Suburban Rail Loop gets green light from environment minister Ground Engineering GE 17 August 2022 Archived from the original on 17 August 2022 Retrieved 17 August 2022 Department of Environment Land Water and Planning 10 August 2022 Suburban Rail Loop East Planning Archived from the original on 17 August 2022 Retrieved 17 August 2022 a href Template Cite web html title Template Cite web cite web a CS1 maint multiple names authors list link Build Victoria s Big 11 August 2022 Green light for Suburban Rail Loop East Victoria s Big Build Archived from the original on 17 August 2022 Retrieved 17 August 2022 a b Build Victoria s Big 29 August 2023 Preferred bidder announced for SRL East tunnelling contract Victoria s Big Build Retrieved 31 August 2023 a b c Duboudin Tony 30 August 2023 Preferred bidder named for Melbourne Suburban Rail Loop tunnelling International Railway Journal Retrieved 31 August 2023 Chan Ray 29 August 2023 TBMs on the way for SRL Rail Express Retrieved 31 August 2023 Build Victoria s Big 29 August 2023 Planning for the future of SRL neighbourhoods Victoria s Big Build Retrieved 31 August 2023 Build Victoria s Big 16 November 2021 SRL East Train stabling facility fact sheet Victoria s Big Build Archived from the original on 17 August 2022 Retrieved 17 August 2022 Major planning changes under new Suburban Rail Loop law www holdingredlich com Archived from the original on 8 December 2021 Retrieved 13 May 2022 Waters Cara 19 November 2021 Streamlined or autocratic Minister s planning powers gradually grow The Age Archived from the original on 13 May 2022 Retrieved 13 May 2022 a b Jacks Timna 28 September 2021 Unconscionable Councils fear government rail loop land grab The Age Archived from the original on 13 May 2022 Retrieved 13 May 2022 Suburban Rail Loop Strategic Assessment PDF Development Victoria 2018 p 22 Archived PDF from the original on 19 September 2018 Retrieved 3 November 2018 Willingham Richard Melbourne s new Suburban Rail Loop to start at Cheltenham 2 2 billion announced for early works Archived from the original on 23 November 2020 Retrieved 24 November 2020 a b Development Victoria 2018 p 26 Rail loop set to connect Gippsland Archived from the original on 4 November 2018 Retrieved 3 November 2018 a b Build Victoria s Big 30 October 2022 Train stabling facility Victoria s Big Build Archived from the original on 25 February 2023 Retrieved 25 February 2023 Rail Loop Set To Connect North East Victoria Premier of Victoria 28 August 2018 Retrieved 3 November 2018 a b Build Victoria s Big 30 October 2022 Melbourne Airport Rail overview Victoria s Big Build Archived from the original on 5 January 2023 Retrieved 31 October 2022 SRL Airport Takes Flight As Works Begin Premier of Victoria www premier vic gov au Archived from the original on 31 October 2022 Retrieved 30 October 2022 Western Rail Plan PDF Transport for Victoria 2018 p 9 Archived PDF from the original on 7 March 2019 Retrieved 3 November 2018 a b c Jacks Timna Preiss Benjamin 28 August 2018 Crucial questions remain over cost of Melbourne s suburban rail loop The Age Archived from the original on 5 November 2018 Retrieved 5 November 2018 Eddie Rachel 28 October 2018 Victoria election Daniel Andrews Matthew Guy launch campaigns The New Daily Archived from the original on 7 November 2018 Retrieved 3 November 2018 Taylor Alistair 25 November 2018 Did the Suburban Rail Loop win the Victorian election for Labor Urban Archived from the original on 2 December 2018 Retrieved 2 December 2018 Johnston Matt Dowling James 26 November 2018 How ALP rolled the rest Herald Sun p 4 Suburban rail loop plan has lots of merit but let s see the detail The Age 28 August 2018 Archived from the original on 13 September 2018 Retrieved 3 November 2018 Johnston Matt 31 August 2018 Dan s tunnel is likely to have plenty of twists Herald Sun p 55 Bowen Daniel 28 August 2018 This is Big City thinking and should be applauded The Age Archived from the original on 5 November 2018 Retrieved 3 November 2018 a b c d A generation s worth of spending Is the 50 billion rail loop a waste of money ABC News 22 October 2018 Archived from the original on 3 November 2018 Retrieved 3 November 2018 Jones Dave September 2018 Melbourne suburban rail loop analysis RoyalAuto Royal Automobile Club of Victoria Archived from the original on 5 November 2018 Retrieved 5 November 2018 Jacks Timna 6 September 2018 What Melbourne s public transport could look like by 2050 according to the experts The Age Archived from the original on 7 September 2018 Retrieved 3 November 2018 Koob Simone Fox 28 August 2018 Melbourne suburban rail loop What readers think The Age Archived from the original on 6 September 2018 Retrieved 3 November 2018 Booker Chloe 5 September 2018 Putting the rail loop on the map Results in on your favourite design The Age Archived from the original on 13 September 2018 Retrieved 3 November 2018 Potter Ben 28 August 2018 Victorian state election Daniel Andrews floats plan for 50b suburban rail loop Australian Financial Review Archived from the original on 27 March 2019 Retrieved 31 December 2018 Koziol Michael 1 September 2018 Alan Tudge backs a bigger Australia as he eyes the demon of population policy The Age Archived from the original on 31 December 2018 Retrieved 31 December 2018 Bowen Daniel 7 September 2018 More thoughts on the suburban rail loop Metro 3 Daniel Bowen dot com danielbowen com Archived from the original on 31 December 2018 Retrieved 31 December 2018 Swiss declare Alps tamed as longest rail tunnel opens with eclectic ceremony www abc net au 1 June 2016 Archived from the original on 24 November 2020 Retrieved 24 June 2020 a b Lucas Clay Jacks Timna 14 October 2018 Hundreds of millions more to plan rail loop but not all on board The Age Archived from the original on 12 January 2019 Retrieved 13 January 2019 a b Parliamentary Budget Office Victoria 27 August 2022 Suburban Rail Loop East and North Value of continued investment pbo vic gov au Archived from the original on 25 February 2023 Retrieved 24 February 2023 Daniel Andrews defends Suburban Rail Loop amid claims it could cost more than double the original estimate ABC News 17 August 2022 Archived from the original on 18 August 2022 Retrieved 18 August 2022 Victorian Parliamentary Budget Office 18 August 2022 Advice Suburban Rail Loop East and North Building and operating costs pbo vic gov au Archived from the original on 17 August 2022 Retrieved 18 August 2022 Ilanbey Sumeyya 18 August 2022 Where is the value for money Experts back call to shelve 125b rail loop WAtoday Archived from the original on 18 August 2022 Retrieved 18 August 2022 Clure Elias 8 September 2022 Fears that Victoria s suburban rail loop project will have a massive cost blowout 730 ABC News archived from the original on 25 February 2023 retrieved 24 February 2023 Development Victoria 2018 p 13 Rawsley Terry 2018 Will the 50b Suburban Rail Loop shape the Melbourne we want PDF SGS Economics and Planning pp 9 10 Archived PDF from the original on 27 February 2020 Retrieved 13 January 2019 Daniel Andrews 50bn rail loop through marginal seats The Australian 29 August 2018 Ore Adeshola 21 September 2022 Victoria s auditor general pokes holes in Suburban Rail Loop business case The Guardian ISSN 0261 3077 Retrieved 14 December 2023 Kolovos Benita correspondent Benita Kolovos Victoria state 6 December 2023 Creeping politicisation in Victoria s public service needs urgent attention ombudsman warns The Guardian ISSN 0261 3077 Retrieved 14 December 2023 Victoria Environment Protection Authority Suburban Rail Loop Project Environment Protection Authority Victoria www epa vic gov au Retrieved 4 March 2024 External links editDepartment of Transport Suburban Rail Loop Victoria s Big Build Suburban Rail Loop Suburban Rail Loop Business and Investment Case Suburban Rail Loop Appendix B1 SRL Precinct Location Options Assessment Summary Retrieved from https en wikipedia org w index php title Suburban Rail Loop amp oldid 1211877540, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.