fbpx
Wikipedia

Melbourne 2030

Melbourne 2030 is a Government of Victoria strategic planning policy framework for the metropolitan area of Melbourne, Australia intended to cover the period 2001–2030. During this period the population of the metropolitan area is expected to grow by a million people to over five million. Population projections now predict Melbourne's population could reach seven million by that time and the government has since changed its strategy on the policy, abandoning the urban growth boundary in the north and west of Melbourne and reducing green wedges.

The Yarra River and Melbourne skyline.

Introduced by the Bracks government, its main elements are based on well-established planning principles for Transit-oriented development:

  • reducing the proportion of new development occurring at low densities on Melbourne's fringe from about 60% of annual construction to 40% by redirecting new development to defined areas of established inner and middle-ring suburbs.
  • concentrating development within designated activity centres close to transport nodes. The policy has particular emphasis on public transport over car-based suburbs dependent on the private motor car. However the strategy itself does not detail further investment in the public transport system.
  • reducing urban sprawl by establishing legislated urban growth boundaries, with the aim of containing urban development.
  • protecting areas of open space known as green wedges left between areas defined by the urban growth boundaries from development.[1]

The existence of Melbourne 2030 gives the Victorian Civil and Administrative Tribunal (VCAT) the policy rationale to determine planning disputes in favour of developments that it judges to be in accordance with the metropolitan strategy's objectives.

The policy was amended in late 2008 to become Melbourne @ Five Million in response to increased population forecasts and an increased demand for housing. The update provisioned for an extended growth boundary[2] and is reinforcing the aim of a multi-centre metropolitan area by lifting the hierarchic level of six Principal Activity Centres (PAC) to Central Activities Districts (CAD). The centres of Box Hill, Broadmeadows, Dandenong, Footscray, Frankston and Ringwood[3] will thus have to provide similar services and functions as central Melbourne.

Outline edit

Activity Centres edit

  • Central Activities Districts (CAD)
Seven centres including the Hoddle Grid, also known as the Central Business District (CBD) or 'City'. These areas require excellent connections to public transport.
  • Principal, Major and Specialised Activity Centres
Approximately 100 principal, major and specialised activity centres of varying sizes, with strong links to public transport
  • Neighbourhood Activity Centres
Approximately 900 local neighbourhood activity centres

Central Activities Districts (CAD) edit

 
A tram passing high-rise apartment buildings in suburban Box Hill, 14 km east of the CBD

Principal Activity Centres edit

Major Activity Centres edit

There are 93 Major Activity Centres, including: Altona, Altona Gate (Altona North), Brunswick, Cheltenham, Eltham, Ivanhoe, Kew, Mornington, Nunawading, The Pines (Doncaster East), Preston, Rosebud, Sandringham, South Melbourne, St Kilda, Williamstown.

Criticisms and controversy edit

Melbourne 2030 has been subject to criticism concerning the basis of some of its policy objectives, inconsistencies between policies, poor implementation and departures from its principles by the Victorian government.

Monash University published a critique of the policy in its book "Melbourne 2030: Planning Rhetoric Versus Urban Reality".[4]

The Melbourne media has also published several stories about the flaws in the policy.[5][6]

Policy objectives edit

Encouraging intensification in activity centres sustains existing development pressure in some of the oldest parts of inner-city and middle-ring suburbs that are also often heritage precincts. The National Trust of Victoria has expressed concern about the effect on inner city heritage areas, particularly in sensitive suburbs such as Carlton, Fitzroy, Collingwood[7] and South Yarra. Some media commentators claimed that the policy would destroy Melbourne's character.[8]

Some of the organisations that have spoken out against Melbourne 2030's objectives:

  • Collingwood Action Group[9] – specifically with regard to the development of Smith Street
  • Sunshine Residents and Ratepayers Association[10]

A large rally was held in 2004 by community groups in opposition to the policy.[11]

Inconsistencies of opponents edit

Opponents of the blueprint are inconsistent in their arguments against the Melbourne 2030 blueprint. For example, although much criticism has been directed at increasing density in the inner suburbs of Melbourne, opponents are also highly critical of the releasing of new land on the fringes of Melbourne.[6] The Victorian Government has been continuously blocked from increasing density in existing suburban areas, such as the City of Boroondara, by "residents' groups" who continuously object to new medium-density developments, greatly hindering the progress of the blueprint.[12]

However, it is these same groups who oppose the urban sprawl of Melbourne, the only other option short of refusing residence to new arrivals.[12]

Policy inconsistencies edit

The Public Transport Users Association criticised the target of 20% of motorised trips transferring to public transport by 2020, claiming that the existing system is at capacity and could not cope with a tripling of users without expansion and increased frequency of services.[citation needed] Transport experts such as Paul Mees and others have argued that the capacity of the current system could be increased if management practices were improved, and many have called for the system to be returned to public administration when the contracts with private operators expire in November 2007. Furthermore, public transport advocates are doubtful about the capability of the privatised transport system to handle increased patronage without a large increase government investment, although little is envisaged by the strategy. After taking over the role as transport minister, Lynne Kosky, conceding that the goal was becoming impossible to reach described the 2020 aim as always only having been "aspirational goal" rather than a policy.[13]

Other infrastructure concerns included the availability of water for the growing metropolis. Victorian opposition leader Ted Baillieu has criticised the policy of "no new dams" while allowing the population to increase by another million.[14]

Policy implementation edit

The high-profile resistance campaign against the redevelopment proposals for Camberwell railway station, headed by Geoffrey Rush, provide an example of how politically difficult it could be to implement policies for intensification of suburban activity centres.

To achieve the objectives, the State Government stripped local councils of many of their planning powers and escalating decisions to VCAT.[5] This has caused much controversy and many councils have become unsure of their role in the planning process.[15]

Many felt that the policy had become further flawed by the underestimated population projections contained in the report when figures were released showing higher than expected population growth for Melbourne.[16]

Policy departures edit

At the same time, proponents have been critical of the implementation of Melbourne 2030 with many believing that the government is abandoning key aspects of the strategy. For example, after a boom in new housing construction in outer Melbourne, the government released more land for outer suburban development beyond the urban growth boundary.[17] Other policies, such as the construction of freeways (including the 45 kilometre EastLink tollway, Pakenham Bypass, Craigieburn Bypass and Peninsula Link) and upgrading of existing freeway systems (including the CityLink tollway, Monash Freeway, and West Gate Freeway) appear to many to be at odds with Melbourne 2030.

Other Planning policies edit

See also edit

References edit

  1. ^ "Wedge Politics". The Age. Melbourne: Fairfax. 6 November 2003. Retrieved 29 September 2010.
  2. ^ Lucas, Clay (16 June 2009). "New train line and ring road routes to be unveiled". The Age. Melbourne: Fairfax. Retrieved 29 September 2010.
  3. ^ Department of Planning and Community Development (December 2008). "Melbourne 2030: a planning update, Melbourne @ 5 million". Managing Melbourne's Growth. State Government of Victoria. Retrieved 29 September 2010.
  4. ^ "Melbourne 2030: Planning Rhetoric Versus Urban Reality" Bob Birrell, Kevin O'Connor, Virginia Rapson, Ernest Healy, ebrary, Inc Published by Monash University ePress, 2005 ISBN 0-9757475-0-9, ISBN 978-0-9757475-0-6
  5. ^ a b Davidson, Kenneth (26 May 2008). "Experts find the flaws in Melbourne 2030". Age. Fairfax. Retrieved 29 September 2010.
  6. ^ a b Dowling, Jason; Houston, Cameron (7 June 2008). "Flawed design for a perfect city". Age. Melbourne: Fairfax. Retrieved 29 September 2010.
  7. ^ Collingwood Action Group 22 January 2007 at the Wayback Machine
  8. ^ Birrell, Bob; O'Connor, Kevin (22 March 2005). "2030: a space fallacy". The Age. Melbourne: Fairfax. Retrieved 29 September 2009.
  9. ^ Collingwood Action Group (CAG): Melbourne 2030 - The State Government's Planning Strategy 22 March 2009 at the Wayback Machine. Smith Street (2004-07-15). Retrieved on 2013-12-06.
  10. ^ Intimidation at Council Meetings 19 July 2008 at the Wayback Machine. Sunshine.asn.au (2005-06-02). Retrieved on 2013-12-06.
  11. ^ Boulton, Martin (6 October 2004). "Ban plan for Melbourne, groups urge". Age. Fairfax. Retrieved 29 September 2010.
  12. ^ a b "Boroondara Residents' Action Group (BRAG)". Marvellous Melbourne. Retrieved 29 April 2009.
  13. ^ Millar, Royce; Moynihan, Stephen (26 February 2007). "Trams, trains likely to stay private". Age. Melbourne: Fairfax. Retrieved 29 September 2010.
  14. ^ Austin, Paul (9 October 2006). "Yes or no? A dam fine election question". Age. Melbourne: Fairfax. Retrieved 29 September 2010.
  15. ^ Gordon, Josh (20 February 2008). "Judge may toll the bell on VCAT's old ways". Age. Melbourne: Fairfax. Retrieved 29 September 2010.
  16. ^ "Melbourne's population to hit 5m by 2032". Sydney Morning Herald. Fairfax. 24 September 2007. Retrieved 29 September 2010.
  17. ^ Donovan, Samantha (4 March 2008). "Vic land release plan could create 'urban wasteland'". ABC. Retrieved 22 August 2015.
  18. ^ "Melbourne 2030: a planning update - Melbourne @ 5 million". Planning. 8 March 2017.
  19. ^ "Plan Melbourne". Planning. 13 June 2023.

External links edit

  • DSE Melbourne 2030: a planning update – Melbourne @ 5 million (December 2008)
  • DSE Planning for all of Melbourne (May 2008)
  • DSE Melbourne 2030 online (October 2002)

melbourne, 2030, government, victoria, strategic, planning, policy, framework, metropolitan, area, melbourne, australia, intended, cover, period, 2001, 2030, during, this, period, population, metropolitan, area, expected, grow, million, people, over, five, mil. Melbourne 2030 is a Government of Victoria strategic planning policy framework for the metropolitan area of Melbourne Australia intended to cover the period 2001 2030 During this period the population of the metropolitan area is expected to grow by a million people to over five million Population projections now predict Melbourne s population could reach seven million by that time and the government has since changed its strategy on the policy abandoning the urban growth boundary in the north and west of Melbourne and reducing green wedges The Yarra River and Melbourne skyline Introduced by the Bracks government its main elements are based on well established planning principles for Transit oriented development reducing the proportion of new development occurring at low densities on Melbourne s fringe from about 60 of annual construction to 40 by redirecting new development to defined areas of established inner and middle ring suburbs concentrating development within designated activity centres close to transport nodes The policy has particular emphasis on public transport over car based suburbs dependent on the private motor car However the strategy itself does not detail further investment in the public transport system reducing urban sprawl by establishing legislated urban growth boundaries with the aim of containing urban development protecting areas of open space known as green wedges left between areas defined by the urban growth boundaries from development 1 The existence of Melbourne 2030 gives the Victorian Civil and Administrative Tribunal VCAT the policy rationale to determine planning disputes in favour of developments that it judges to be in accordance with the metropolitan strategy s objectives The policy was amended in late 2008 to become Melbourne Five Million in response to increased population forecasts and an increased demand for housing The update provisioned for an extended growth boundary 2 and is reinforcing the aim of a multi centre metropolitan area by lifting the hierarchic level of six Principal Activity Centres PAC to Central Activities Districts CAD The centres of Box Hill Broadmeadows Dandenong Footscray Frankston and Ringwood 3 will thus have to provide similar services and functions as central Melbourne Contents 1 Outline 1 1 Activity Centres 1 1 1 Central Activities Districts CAD 1 1 2 Principal Activity Centres 1 1 3 Major Activity Centres 2 Criticisms and controversy 2 1 Policy objectives 2 2 Inconsistencies of opponents 2 3 Policy inconsistencies 2 4 Policy implementation 2 5 Policy departures 3 Other Planning policies 4 See also 5 References 6 External linksOutline editActivity Centres edit Central Activities Districts CAD Seven centres including the Hoddle Grid also known as the Central Business District CBD or City These areas require excellent connections to public transport Principal Major and Specialised Activity Centres Approximately 100 principal major and specialised activity centres of varying sizes with strong links to public transport Neighbourhood Activity Centres Approximately 900 local neighbourhood activity centres Central Activities Districts CAD edit nbsp A tram passing high rise apartment buildings in suburban Box Hill 14 km east of the CBD The Hoddle Grid Central Business District CBD or City Box Hill Broadmeadows Dandenong Footscray Frankston Ringwood Principal Activity Centres edit Airport West Camberwell Junction Chadstone Cheltenham Southland Coburg Cranbourne Doncaster Hill Epping Glen Waverley Greensborough Maribyrnong Highpoint Moonee Ponds Narre Warren Fountain Gate Prahran South Yarra Preston High Street Preston Northland South Morang Sunshine Sydenham Wantirna South Knox Central Werribee Major Activity Centres edit There are 93 Major Activity Centres including Altona Altona Gate Altona North Brunswick Cheltenham Eltham Ivanhoe Kew Mornington Nunawading The Pines Doncaster East Preston Rosebud Sandringham South Melbourne St Kilda Williamstown Criticisms and controversy editMelbourne 2030 has been subject to criticism concerning the basis of some of its policy objectives inconsistencies between policies poor implementation and departures from its principles by the Victorian government Monash University published a critique of the policy in its book Melbourne 2030 Planning Rhetoric Versus Urban Reality 4 The Melbourne media has also published several stories about the flaws in the policy 5 6 Policy objectives edit Encouraging intensification in activity centres sustains existing development pressure in some of the oldest parts of inner city and middle ring suburbs that are also often heritage precincts The National Trust of Victoria has expressed concern about the effect on inner city heritage areas particularly in sensitive suburbs such as Carlton Fitzroy Collingwood 7 and South Yarra Some media commentators claimed that the policy would destroy Melbourne s character 8 Some of the organisations that have spoken out against Melbourne 2030 s objectives Collingwood Action Group 9 specifically with regard to the development of Smith Street Sunshine Residents and Ratepayers Association 10 A large rally was held in 2004 by community groups in opposition to the policy 11 Inconsistencies of opponents edit Opponents of the blueprint are inconsistent in their arguments against the Melbourne 2030 blueprint For example although much criticism has been directed at increasing density in the inner suburbs of Melbourne opponents are also highly critical of the releasing of new land on the fringes of Melbourne 6 The Victorian Government has been continuously blocked from increasing density in existing suburban areas such as the City of Boroondara by residents groups who continuously object to new medium density developments greatly hindering the progress of the blueprint 12 However it is these same groups who oppose the urban sprawl of Melbourne the only other option short of refusing residence to new arrivals 12 Policy inconsistencies edit The Public Transport Users Association criticised the target of 20 of motorised trips transferring to public transport by 2020 claiming that the existing system is at capacity and could not cope with a tripling of users without expansion and increased frequency of services citation needed Transport experts such as Paul Mees and others have argued that the capacity of the current system could be increased if management practices were improved and many have called for the system to be returned to public administration when the contracts with private operators expire in November 2007 Furthermore public transport advocates are doubtful about the capability of the privatised transport system to handle increased patronage without a large increase government investment although little is envisaged by the strategy After taking over the role as transport minister Lynne Kosky conceding that the goal was becoming impossible to reach described the 2020 aim as always only having been aspirational goal rather than a policy 13 Other infrastructure concerns included the availability of water for the growing metropolis Victorian opposition leader Ted Baillieu has criticised the policy of no new dams while allowing the population to increase by another million 14 Policy implementation edit The high profile resistance campaign against the redevelopment proposals for Camberwell railway station headed by Geoffrey Rush provide an example of how politically difficult it could be to implement policies for intensification of suburban activity centres To achieve the objectives the State Government stripped local councils of many of their planning powers and escalating decisions to VCAT 5 This has caused much controversy and many councils have become unsure of their role in the planning process 15 Many felt that the policy had become further flawed by the underestimated population projections contained in the report when figures were released showing higher than expected population growth for Melbourne 16 Policy departures edit At the same time proponents have been critical of the implementation of Melbourne 2030 with many believing that the government is abandoning key aspects of the strategy For example after a boom in new housing construction in outer Melbourne the government released more land for outer suburban development beyond the urban growth boundary 17 Other policies such as the construction of freeways including the 45 kilometre EastLink tollway Pakenham Bypass Craigieburn Bypass and Peninsula Link and upgrading of existing freeway systems including the CityLink tollway Monash Freeway and West Gate Freeway appear to many to be at odds with Melbourne 2030 Other Planning policies editPostcode 3000 1990s ResCode a design guide for medium density housing in Melbourne which came into effect on 24 August 2001 Transport and Livability Statement delivered on 17 May 2006 Green belt Melbourne 5 million 18 Plan Melbourne 19 See also editTransport in Melbourne Transit oriented development Urban Design Sustainability Save Our SuburbsReferences edit Wedge Politics The Age Melbourne Fairfax 6 November 2003 Retrieved 29 September 2010 Lucas Clay 16 June 2009 New train line and ring road routes to be unveiled The Age Melbourne Fairfax Retrieved 29 September 2010 Department of Planning and Community Development December 2008 Melbourne 2030 a planning update Melbourne 5 million Managing Melbourne s Growth State Government of Victoria Retrieved 29 September 2010 Melbourne 2030 Planning Rhetoric Versus Urban Reality Bob Birrell Kevin O Connor Virginia Rapson Ernest Healy ebrary Inc Published by Monash University ePress 2005 ISBN 0 9757475 0 9 ISBN 978 0 9757475 0 6 a b Davidson Kenneth 26 May 2008 Experts find the flaws in Melbourne 2030 Age Fairfax Retrieved 29 September 2010 a b Dowling Jason Houston Cameron 7 June 2008 Flawed design for a perfect city Age Melbourne Fairfax Retrieved 29 September 2010 Collingwood Action Group Archived 22 January 2007 at the Wayback Machine Birrell Bob O Connor Kevin 22 March 2005 2030 a space fallacy The Age Melbourne Fairfax Retrieved 29 September 2009 Collingwood Action Group CAG Melbourne 2030 The State Government s Planning Strategy Archived 22 March 2009 at the Wayback Machine Smith Street 2004 07 15 Retrieved on 2013 12 06 Intimidation at Council Meetings Archived 19 July 2008 at the Wayback Machine Sunshine asn au 2005 06 02 Retrieved on 2013 12 06 Boulton Martin 6 October 2004 Ban plan for Melbourne groups urge Age Fairfax Retrieved 29 September 2010 a b Boroondara Residents Action Group BRAG Marvellous Melbourne Retrieved 29 April 2009 Millar Royce Moynihan Stephen 26 February 2007 Trams trains likely to stay private Age Melbourne Fairfax Retrieved 29 September 2010 Austin Paul 9 October 2006 Yes or no A dam fine election question Age Melbourne Fairfax Retrieved 29 September 2010 Gordon Josh 20 February 2008 Judge may toll the bell on VCAT s old ways Age Melbourne Fairfax Retrieved 29 September 2010 Melbourne s population to hit 5m by 2032 Sydney Morning Herald Fairfax 24 September 2007 Retrieved 29 September 2010 Donovan Samantha 4 March 2008 Vic land release plan could create urban wasteland ABC Retrieved 22 August 2015 Melbourne 2030 a planning update Melbourne 5 million Planning 8 March 2017 Plan Melbourne Planning 13 June 2023 External links editDSE Melbourne 2030 a planning update Melbourne 5 million December 2008 DSE Planning for all of Melbourne May 2008 DSE Melbourne 2030 online October 2002 Retrieved from https en wikipedia org w index php title Melbourne 2030 amp oldid 1183012284, wikipedia, wiki, book, books, library,

article

, read, download, free, free download, mp3, video, mp4, 3gp, jpg, jpeg, gif, png, picture, music, song, movie, book, game, games.